You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, March 29th 2007, 5:29pm

Republic of France, Q2/34

A. Industrial Allocation

13/26 factories to naval materials: 13,000 tons created for Q2/34. 4,992 tons saved from Q1/34, for a total of 17,992 tons available.

13/26 factories (committed) to infrastructure development: 1.3 pts

0/26 factories (non-committed) to infrastructure development; total 0.0 infrastructure points produced.

B. Infrastructure Development

Continue 1 factory at Phnom Penh - 6.0 pts added by Q2/34. 1.0 pts added in Q2/34. 3.0 pts remaining.

Expand Class 3 Drydock #1 at Saigon to Class 4 - 0.1 pts added by Q2/34. 0.1 pt added in Q2/34. 0.8 pts remaining.

Expand Class 3 Drydock #1 at Noumea to Class 4 - 0.1 pts added by Q2/34. 0.1 pt added in Q2/34. 0.8 pts remaining.

Begin Class 1 Port at Chrouy Svay, Kampuchea. 0.1 pts added by Q2/34. 0.1 pt added in Q2/34. 2.8 pts remaining.

C. Naval Construction

At La Rochelle
Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Slip #3 - Contre-Torpillieur Mogador laid down 2 January 1934. 750 tons added by Q2/34. 750 tons added in Q2/34. 1,365 tons remaining.
Class 3 Slip #4 - Contre-Torpillieur Hoche laid down 2 January 1934. 750 tons added by Q2/34. 750 tons added in Q2/34. 1,365 tons remaining.
Class 2 Slip #1 - Contre-Torpillieur Desaix laid down 2 January 1934. 750 tons added by Q2/34. 750 tons added in Q2/34. 1,365 tons remaining.
Class 2 Slip #2 - Contre-Torpillieur Marceau laid down 2 January 1934. 750 tons added by Q2/34. 750 tons added in Q2/34. 1,365 tons remaining.
Class 1 Slip #1 -
Class 1 Slip #2 -
Class 1 Slip #3 -
Class 1 Slip #4 -
Class 0 Slip #1 -
Class 0 Slip #2 -
Class 0 Slip #3 -
Class 0 Slip #4 -

At Brest
Class 3 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

Cruise liner Marianne being built in the private yard of Chantiers et Ateliers de St. Nazaire, expected to be completed by 12/37

At Cayenne
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Abidjan
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Marseilles
Class 4 Drydock #1 - Battleship France rebuild begun 1/1/34. 2,250 tons added by Q2/34. 2,250 tons added in Q2/34. 13,500 tons remaining.
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

At Oran
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

At Tunis
Class 4 Drydock #1 - Battleship Republique rebuild begun 1/1/34. 2,250 tons added by Q2/34. 2,250 tons added in Q2/34. 13,500 tons remaining.
Class 3 Slip #1 - Idle
Class 1 drydock #1 - Idle

At Beiruit
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Djibouti (Cl 2)
Class 1 Drydock - Idle

At Crozet Island
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Saigon
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle

At New Caledonia
Class 3 Drydock #1 - Idle
Class 2 Drydock #1 - Repair ship Dakar being refitted. 758 tons added by Q2/34. 758 tons added in Q2/34. 1,514 tons remaining.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle

At Papeete (Cl 3)
Class 3 Drydock - Idle

Launched ships being completed:

BB Richelieu laid down 3 January 1931. 29,900 tons added by Q2/34. 1,000 tons added in Q2/34. Launched 8 January 1933. 2,978 tons remaining.

BB Courbet laid down 6 January 1931. 29,900 tons added by Q2/34. 1,000 tons added in Q2/34. Launched 11 January 1933. 2,978 tons remaining.

10 wooden subchaers built at Saigon - 1,000 tons

D. Transactions

Ordered 8 420mm naval rifles from the Obukhov Works, Petrograd. Each gun weighs 135 tons. The total order comes to 1,080 tons, and a total of 1,200 tons of warship material will be paid to the Russian Federation.

300 tons warship material sent to the Russian Federation in payment in Q2/34. 600 tons remain to be paid.

E. Other Notes
8 single turrets for 420mm guns started. Each requires 600 tons warship materials, for a total of 4,800 tons required. 1,200 tons added by Q2/34. 1,200 tons added in Q2/34. 2,400 tons remaining. Concrete work has been initiated near Saigon Indochina and Noumea New Caledonia.

Development of 420mm/45 begun.

12,758 tons expended out of 17,992 tons available.
5,234 tons saved.

12x 12" guns from the scrapped battleship Paris, and 8x 190mm, 16x 164mm and 12x 100mm guns from the scrapped armored cruisers Gloire and Conde incorporated into the coastal defenses at Papeete, French Polynesia.

22x 140mm guns from the scrapped battleship Paris and 16x 155mm and 12x 75mm guns from the scrapped aircraft carriers Normandie and Languedoc incorporated into coast artillery defenses in French Polynesia.

New coast defense guns now available:


- 108x 10mm AA guns in 54 twin mounts
18 being installed at Tunis

- 400x 40mm AA guns in 200 twin mounts
40 being installed at Tunis
40 being installed at Papeete
16 being installed at Noumea
24 being installed at Saigon

F. Ships being scrapped

None

G. Updated Order of Battle, 1 July 1934

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 6(2)+2
BC: 0(0)+0
CV:3(0)+0
CA: 4(0)+2
CL: 22(0)+4
Monitors: 5(0)+0
DD: 96(0)+0
Sloops: 0(0)+0
Fleet Submarine: 15(0)+0
Coastal Submarine: 70(0)+0

This post has been edited 1 times, last edit by "AdmKuznetsov" (Apr 2nd 2007, 11:32am)