You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Monday, January 15th 2007, 4:07pm

Quarterly Report #48 for the SAE

[SIZE=4]SAE Quarterly Reports [/SIZE]

No. 48 - October to December 1932


[SIZE=3]Transfers:[/SIZE]

None


[SIZE=3]Factories:[/SIZE]

26 factories total can be used.

Fixed factories

2 factory will be fixed to produce infrastructure points for 1932.

Flexible factories

189ts material transferred from Q3 (incl. material recovered from scrapyard).

24,000ts material necessary to be produced in this quarter (24 factories).

0 factories will produce infrastructure points this quarter.

Infrastructure points used this quarter:

0,4pts put into an extension of a Type 3 Dock in Douala for a total of 4,5pts at the end of Q4.


[SIZE=3]Ships:[/SIZE]

Minor vessels

Completed Units

48x UJ26-class ASW launch
28x UJ30-class ASW launch

48x R28-class motor launch
20x R31-class motor launch

1x Tree-class minesweeper (Type 16)
16x Bush-class minesweeper (Type 21)
16x Cactus-class minesweeper (Type 28)

4x Polar-class sloops
8x S-class sloops
3x Circe-class sloops

16x River-class frigate

8x Pleiades-class light destroyers
8x Planet-class light destroyers

2x Guard-class patrol crafts

On Trials

4x Tree-class minesweeper
- Birch running trials until October 32
- Red Beech running trials until December 32
- Yew running trials until March 33
- Plane running trials until February 33

1x Guard-class patrol crafts
- Guard running trials until March 33

Ordered Units

2x Polar-class sloop (11 month á 134ts material necessary per unit)
- Polar Bear II laid down in Durban on a Type 1 slip in March, completed in January 33
- Polar Light II laid down in Daressalam on a Type 1 slip in February, completed in December 32

1x SL29-class sloop (10 month á 100ts material necessary per unit)
- Harpy laid down in Montevideo on a Type 1 slip in January, completed October 32

4x R31-class motor launch (1 month á 95ts material necessary per unit)
- R69-R72 build in Lüderitz in December

Rebuilds/Refits

3x Tree-class minesweeper (2 month á 60ts/month material necessary per unit)
- Stone Pine entering a Type 0 dock in Libreville in September. Leaving the dock in September, the minesweeper will stay in the yard until October 32
- Alder entering a Type 0 dock in Douala in October. Leaving the dock in October, the minesweeper will stay in the yard until November 32
- Pine entering a Type 0 dock in Douala in December. Leaving the dock in December, the minesweeper will stay in the yard until January 33

3x Guard-class patrol crafts (3 month á 160ts/month material necessary per unit)
- Watcher entering in October the vessel will stay in the yard in until December 32
- Keeper entering in October the vessel will stay in the yard in until December 32
- Look-Out entering in November the vessel will stay in the yard in until February 33

Scrapping

None


Destroyers

Completed Units

12x Cat-class torpedoboat
12x Hound-class torpedoboat (Type 21)
12x Hound-class torpedoboat (Type 26)

12x Nymph-class destroyer (Type 21)
12x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
14x Nymph-class destroyer (Type 30)

8x DL28-class destroyer leader (Type 28)

On Trials

2x DD30-class destroyer
- Iuturna running trials until October 32
- Karmena running trials until February 33

Ordered Units

4x DD32-class destroyer (11 month á 145ts material necessary per unit)
- Naja laid down in Cape Town on a Type 1 slip in February, completed in December 32
- Death Adder laid down in Durban on a Type 1 slip in April, completed in February 33
- Maticora laid down in Port Elizabeth on a Type 1 slip in April, completed in February 33
- Black Adder laid down in Port Louis on a Type 1 slip in October, completed in August 33

4x DL32-class destroyer (11 month á 180ts material necessary per unit)
- Claymore laid down in Daressalam on a Type 2 slip in March, completed in January 33
- Scimitar laid down in Port Louis on a Type 2 slip in February, completed in November 32
- Broadsword laid down in Durban on a Type 2 slip in November, completed in September 33
- Shortsword laid down in Port Louis on a Type 2 slip in December, completed in October 33

Rebuilds

None

Scrapping

None


Class B Cruisers

Completed Units

2x Nampula-class light cruiser
6x Port Shepstone-class light cruiser
6x Santa Fe-class light cruiser
1x Yaounde-class light cruiser
2x Libreville-class light cruiser
4x Rosario-class light cruiser
4x Aurora-class light cruiser
4x Arion-class light cruiser
4x Douala II-class light cruiser

4x Fenris-class destroyer leader

On Trials

1x CL19-class light cruiser
- Brazzaville running trials until October 32

Ordered Units

1x DL30-class destroyer leader (12 month á 218ts material necessary per unit)
- Garm, ex-Python laid down in Mar del Plata on a Type 2 Slip in December, completed in November 32

2x CL31-class light cruiser (17 month á 468ts material necessary per unit)
- Ajax laid down in Durban on a Type 3 slip in August, completed in December 32
- Achilles laid down in Cape Town on a Type 3 slip in October, completed in February 33

2x DL31-class destroyer leader (13 month á 296ts material necessary per unit)
- Fasold laid down in Durban on a Type 2 slip in October, completed in October 32
- Freischütz laid down in Cape Town on a Type 2 slip in May, completed in May 33

Rebuilds/Refits

2x CL19-class light cruiser (4 month á 299ts/month material necessary per unit)
- Port Gentil entering a Type 2 dock in Durban in August. Leaving the dock in September, the cruiser will stay in the yard until November 32
- Bata entering a Type 3 dock in Cape Town in July. Leaving the dock in August, the cruiser will stay in the yard until October 32

Scrapping

None


Class A Cruisers

Completed Units

1x Colony-class AC
4x Cape-class (Type 23)
2x Cape-class (Type 26)
2x Dragon-class (Type 29)

On Trials

None

Ordered Units

None

Refits

None

Scrapping

None


Capital Units

Completed Units

2x Hertog-class
4x Koning-class
2x Mauritius-class
1x South Africa-class
2x Mocambique-class
2x Ophion-class

On Trials

None

Ordered Units

2x BB29O-class battleship (47 month á 800ts material necessary per unit)
- Imperator laid down in Durban on a Type 4 slip in January, completed in November 34
- Conqueror laid down in Montevideo on a Type 4 slip in January, completed in November 34

2x BC31-class battle cruiser (39 month á 764ts material necessary per unit)
- Triumph laid down in Port Elizabeth on a Type 4 slip in January, completed in March 34
- Victory laid down in Durban on a Type 4 slip in April, completed in June 34

Rebuilds/Refits

1x South Africa-class battleship (22 month á 753ts/month material necessary per unit)
- South Africa entering a Type 4 dock in Cape Town in June. Leaving the dock in February 32, the capital ship will stay in the yard until March 34

Scrapping

None


Coastal Defence Units

Completed Units

1x Nagelring-class
1x Tyrfing-class
1x Gungnir-class

2x LCDS-class
2x LCDS-2-class

On Trials

None

Ordered Units

None


Carriers

Completed Units

1x Hammer-class fleet carrier (Type 25B)
1x Forge-class fleet carrier (Type 26)

1x Anvil-class light fleet carrier (Type 30)

On Trials

1x CV30-class light fleet carrier
- Gripper running trials until December 32

Ordered Units

None

Rebuilds/Refits

None


Class A Submarines

Completed Units

11x E-class submarine
15x F-class submarine
4x J-class submarine
1x L-class submarine

On Trials

1x L-class submarine
- L2 running trials until February 33


Ordered Units

None


Class B Submarines

Completed Units

15x I-class submarine
12x H-class submarine
16x K-class submarine

On Trials

None

Ordered Units

None

Scrapping

None


Non-combatants

Completed Units

1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 19)
4x Bay-class tender (Type 23)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)

4x Mimir-class floatplane carriers
2x Bölthorn-class floatplane carrier
2x Thjazi-class floatplane carrier

On Trials

1x TD29-class tender
- Stilbaai running trials until August 32

Ordered Units

1x FV32-class fleet support ship (18 month á 467ts material necessary per unit)
- Alexandra Paul laid down in Montevideo on a Type 2 slip in January, completed June 33

Rebuilds/Refits

None

----------------------------------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only):

76 ASW launches
68 motor launches
33 minesweepers
49 small patrol crafts
98 TB/DD/DLs of less than 2,000ts
37 cruisers category b
9 cruisers category a
13 capital units
7 costal defence ships
3 fleet carrier
43 submarines category b
31 submarines category a
8 floatplane carriers
20 armed tenders

plus numerous auxiliary vessels of all kind.