[SIZE=4]SAE Quarterly Reports [/SIZE]
No. 48 - October to December 1932
[SIZE=3]Transfers:[/SIZE]
None
[SIZE=3]Factories:[/SIZE]
26 factories total can be used.
Fixed factories
2 factory will be fixed to produce infrastructure points for 1932.
Flexible factories
189ts material transferred from Q3 (incl. material recovered from scrapyard).
24,000ts material necessary to be produced in this quarter (24 factories).
0 factories will produce infrastructure points this quarter.
Infrastructure points used this quarter:
0,4pts put into an extension of a Type 3 Dock in Douala for a total of 4,5pts at the end of Q4.
[SIZE=3]Ships:[/SIZE]
Minor vessels
Completed Units
48x UJ26-class ASW launch
28x UJ30-class ASW launch
48x R28-class motor launch
20x R31-class motor launch
1x Tree-class minesweeper (Type 16)
16x Bush-class minesweeper (Type 21)
16x Cactus-class minesweeper (Type 28)
4x Polar-class sloops
8x S-class sloops
3x Circe-class sloops
16x River-class frigate
8x Pleiades-class light destroyers
8x Planet-class light destroyers
2x Guard-class patrol crafts
On Trials
4x Tree-class minesweeper
- Birch running trials until October 32
- Red Beech running trials until December 32
- Yew running trials until March 33
- Plane running trials until February 33
1x Guard-class patrol crafts
- Guard running trials until March 33
Ordered Units
2x Polar-class sloop (11 month á 134ts material necessary per unit)
- Polar Bear II laid down in Durban on a Type 1 slip in March, completed in January 33
- Polar Light II laid down in Daressalam on a Type 1 slip in February, completed in December 32
1x SL29-class sloop (10 month á 100ts material necessary per unit)
- Harpy laid down in Montevideo on a Type 1 slip in January, completed October 32
4x R31-class motor launch (1 month á 95ts material necessary per unit)
- R69-R72 build in Lüderitz in December
Rebuilds/Refits
3x Tree-class minesweeper (2 month á 60ts/month material necessary per unit)
- Stone Pine entering a Type 0 dock in Libreville in September. Leaving the dock in September, the minesweeper will stay in the yard until October 32
- Alder entering a Type 0 dock in Douala in October. Leaving the dock in October, the minesweeper will stay in the yard until November 32
- Pine entering a Type 0 dock in Douala in December. Leaving the dock in December, the minesweeper will stay in the yard until January 33
3x Guard-class patrol crafts (3 month á 160ts/month material necessary per unit)
- Watcher entering in October the vessel will stay in the yard in until December 32
- Keeper entering in October the vessel will stay in the yard in until December 32
- Look-Out entering in November the vessel will stay in the yard in until February 33
Scrapping
None
Destroyers
Completed Units
12x Cat-class torpedoboat
12x Hound-class torpedoboat (Type 21)
12x Hound-class torpedoboat (Type 26)
12x Nymph-class destroyer (Type 21)
12x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
14x Nymph-class destroyer (Type 30)
8x DL28-class destroyer leader (Type 28)
On Trials
2x DD30-class destroyer
- Iuturna running trials until October 32
- Karmena running trials until February 33
Ordered Units
4x DD32-class destroyer (11 month á 145ts material necessary per unit)
- Naja laid down in Cape Town on a Type 1 slip in February, completed in December 32
- Death Adder laid down in Durban on a Type 1 slip in April, completed in February 33
- Maticora laid down in Port Elizabeth on a Type 1 slip in April, completed in February 33
- Black Adder laid down in Port Louis on a Type 1 slip in October, completed in August 33
4x DL32-class destroyer (11 month á 180ts material necessary per unit)
- Claymore laid down in Daressalam on a Type 2 slip in March, completed in January 33
- Scimitar laid down in Port Louis on a Type 2 slip in February, completed in November 32
- Broadsword laid down in Durban on a Type 2 slip in November, completed in September 33
- Shortsword laid down in Port Louis on a Type 2 slip in December, completed in October 33
Rebuilds
None
Scrapping
None
Class B Cruisers
Completed Units
2x Nampula-class light cruiser
6x Port Shepstone-class light cruiser
6x Santa Fe-class light cruiser
1x Yaounde-class light cruiser
2x Libreville-class light cruiser
4x Rosario-class light cruiser
4x Aurora-class light cruiser
4x Arion-class light cruiser
4x Douala II-class light cruiser
4x Fenris-class destroyer leader
On Trials
1x CL19-class light cruiser
- Brazzaville running trials until October 32
Ordered Units
1x DL30-class destroyer leader (12 month á 218ts material necessary per unit)
- Garm, ex-Python laid down in Mar del Plata on a Type 2 Slip in December, completed in November 32
2x CL31-class light cruiser (17 month á 468ts material necessary per unit)
- Ajax laid down in Durban on a Type 3 slip in August, completed in December 32
- Achilles laid down in Cape Town on a Type 3 slip in October, completed in February 33
2x DL31-class destroyer leader (13 month á 296ts material necessary per unit)
- Fasold laid down in Durban on a Type 2 slip in October, completed in October 32
- Freischütz laid down in Cape Town on a Type 2 slip in May, completed in May 33
Rebuilds/Refits
2x CL19-class light cruiser (4 month á 299ts/month material necessary per unit)
- Port Gentil entering a Type 2 dock in Durban in August. Leaving the dock in September, the cruiser will stay in the yard until November 32
- Bata entering a Type 3 dock in Cape Town in July. Leaving the dock in August, the cruiser will stay in the yard until October 32
Scrapping
None
Class A Cruisers
Completed Units
1x Colony-class AC
4x Cape-class (Type 23)
2x Cape-class (Type 26)
2x Dragon-class (Type 29)
On Trials
None
Ordered Units
None
Refits
None
Scrapping
None
Capital Units
Completed Units
2x Hertog-class
4x Koning-class
2x Mauritius-class
1x South Africa-class
2x Mocambique-class
2x Ophion-class
On Trials
None
Ordered Units
2x BB29O-class battleship (47 month á 800ts material necessary per unit)
- Imperator laid down in Durban on a Type 4 slip in January, completed in November 34
- Conqueror laid down in Montevideo on a Type 4 slip in January, completed in November 34
2x BC31-class battle cruiser (39 month á 764ts material necessary per unit)
- Triumph laid down in Port Elizabeth on a Type 4 slip in January, completed in March 34
- Victory laid down in Durban on a Type 4 slip in April, completed in June 34
Rebuilds/Refits
1x South Africa-class battleship (22 month á 753ts/month material necessary per unit)
- South Africa entering a Type 4 dock in Cape Town in June. Leaving the dock in February 32, the capital ship will stay in the yard until March 34
Scrapping
None
Coastal Defence Units
Completed Units
1x Nagelring-class
1x Tyrfing-class
1x Gungnir-class
2x LCDS-class
2x LCDS-2-class
On Trials
None
Ordered Units
None
Carriers
Completed Units
1x Hammer-class fleet carrier (Type 25B)
1x Forge-class fleet carrier (Type 26)
1x Anvil-class light fleet carrier (Type 30)
On Trials
1x CV30-class light fleet carrier
- Gripper running trials until December 32
Ordered Units
None
Rebuilds/Refits
None
Class A Submarines
Completed Units
11x E-class submarine
15x F-class submarine
4x J-class submarine
1x L-class submarine
On Trials
1x L-class submarine
- L2 running trials until February 33
Ordered Units
None
Class B Submarines
Completed Units
15x I-class submarine
12x H-class submarine
16x K-class submarine
On Trials
None
Ordered Units
None
Scrapping
None
Non-combatants
Completed Units
1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 19)
4x Bay-class tender (Type 23)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
4x Mimir-class floatplane carriers
2x Bölthorn-class floatplane carrier
2x Thjazi-class floatplane carrier
On Trials
1x TD29-class tender
- Stilbaai running trials until August 32
Ordered Units
1x FV32-class fleet support ship (18 month á 467ts material necessary per unit)
- Alexandra Paul laid down in Montevideo on a Type 2 slip in January, completed June 33
Rebuilds/Refits
None
----------------------------------------------------------------------------------------------------------------
At the end of this quarter the RSAN consists of (units in service only):
76 ASW launches
68 motor launches
33 minesweepers
49 small patrol crafts
98 TB/DD/DLs of less than 2,000ts
37 cruisers category b
9 cruisers category a
13 capital units
7 costal defence ships
3 fleet carrier
43 submarines category b
31 submarines category a
8 floatplane carriers
20 armed tenders
plus numerous auxiliary vessels of all kind.