Iberian Naval Developments Q1 1933
a/ Industrial Allocation
14/24 factories producing materiel for shipbuilding =14000 tons
10/24 factories (fixed) producing infrastructure materiel =1.0 pts
00/24 factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
Transfer of 0.3 pts to Denmark for development of naval infrastructure
Transfer of 0.3 pts to Peru for development of naval infrastructure
0.4 pts diverted to I.C.E.
c/ Naval Construction
Cadiz-
No.1 type 5 slip - San Sebastian, TS, laid down 02/01/32, receives 1361 tons, balance 667 tons
No.2 type 4 slip - Los Estallas, BB, laid down 02/01/33, receives 2220 tons, balance 23,364 tons
No.3 type 3 slip - San Francisco, TS, laid down 02/01/32, receives 1361 tons, balance 667 tons
No.4 type 2 slip - Envasar, FT, laid down 02/01/32, receives 237 tons to complete
No.5 type 2 slip - Idle
No.6 type 2 slip - Empapar, FT, laid down 02/01/32, receives 237 tons to complete
No.1 type 4 drydock - Idle
No.2 type 3 drydock - Idle
Dock side - Idle
Dock side - Idle
Barreiro-
No.1 type 4 slip - Idle
No.2 type 3 slip - Goteo, FT, laid down 02/01/32, receives 237 tons to complete
No.3 type 3 slip - Diluvio, FT, laid down 02/01/32, receives 237 tons to complete
No.4 type 1 slip - BDA 49 - BDA 51, each receive 30 tons to complete.
No.5 type 1 slip - BDA 52 - BDA 54, each receive 30 tons to complete.
No.6 type 1 slip - BDA 55 - BDA 57, each receive 30 tons to complete.
No.1 type 5 drydock - Idle
No.2 type 3 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle
Dock side - Idle
Porto-
No.1 type 4 slip - Idle
No.2 type 3 slip - La Luna, BB, laid down 01/10/32, receives 2220 tons, balance 21144 tons
No.3 type 3 slip - Idle
Dock side - Idle
La Coruna-
No.1 type 2 slip - San Diego, TS, laid down 02/01/32, receives 1361 tons, balance 667 tons
No.2 type 1 slip - BDA 58 - BDA 60, each receive 30 tons to complete.
No.1 type 2 drydock - Idle
No.2 type 1 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle
Dock side - Idle
Santander-
No.1 type 3 slip - San Juan, TS, laid down 02/01/32, receives 1361 tons, balance 667 tons
No.2 type 2 slip - Derramar, FT, laid down 02/01/32, receives 237 tons to complete
No.3 type 1 slip - BDA 61 - BDA 63, each receive 30 tons to complete.
No.4 type 1 slip - BDA 64 - BDA 66, each receive 30 tons to complete.
No.5 type 1 slip - BDA 67 - BDA 69, each receive 30 tons to complete.
No.6 type 1 slip - BDA 70 - BDA 72, each receive 30 tons to complete.
No.1 type 2 drydock - Idle
Dock side - Idle
Dock side - Idle
Santiago De Cuba-
No.1 type 2 slip - Idle
No.2 type 1 slip - Idle
No.3 type 1 slip - Idle
No.1 type 4 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
Dock side - Idle
Dock side - Idle
San Lorenzo-
No.1 type 3 drydock - Idle
No.2 type 1 drydock - Idle
Dock side - Idle
Panama-
No.1 type 2 slip - Idle
No.2 type 1 slip - Idle
No.3 type 1 slip - Idle
No.4 type 1 slip - Idle
No.5 type 1 slip - Idle
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle
Dock side - Idle
Dock side - Idle
Luanda-
No.1 type 1 slip - Idle
No.2 type 1 slip - Idle
No.3 type 1 slip - Idle
No.4 type 1 slip - Idle
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle
Dock side - Idle
Dock side - Idle
San Hainando-
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
d/ Transactions
1400 tons to Italy as part payment for 2 x "Hercules" class sea-lift vessels
e/ Other Notes
Breaking of the following ships:-
None
Re-Fitting (25%) of the following ships:-
None
Re-Building (50%) of the following ships:-
None
Landing Craft -
BDA 49 - BDA 72 = 24 x 30 tons = 720 tons to complete
(due to metal construction, they are assembled on available type 1 slips)
Sea trials of the following vessels:-
C103 - C112 continue sea trials until 03/05/1933
Goteo commences sea trials on 20/01/1933
Diluvio commences sea trials on 20/01/1933
Envasar commences sea trials on 20/01/1933
Empapar commences sea trials on 20/01/1933
Derramar commences sea trials on 20/01/1933
Commissioning of the following vessels:-
BDT265 - BDT276 commission on 29/01/1933
Salpicadura commissions on 30/01/1933
Rocie commissions on 30/01/1933
Tonnage from scrapping = 0
Tonnage Carried Over From This Quarter = 619 tons
Total Tonnage Carried Over From This Quarter = 619 tons
f/ Order of Battle
Note: W(X)+Y(Z) = In Service (under repair/refit) + building/on order (breaking)
BB = 08 (0) + 2/0 (0)
BC = 04 (0) + 0/0 (0)
CDS(CE) = 05 (0) + 0/0 (0)
CA = 10 (0) + 0/0 (0)
CL = 44 (0) + 0/0 (0)
CV = 04 (0) + 0/0 (0)
DD = 99 (0) + 0/0 (0)
FR = 16 (0) + 0/0 (0)
GB = 92 (0) + 0/0 (0)
SL = 10 (0) + 10/0 (0)
SUB = 54 (0) + 0/0 (0)
MWS = 32 (0) + 0/0 (0)
BDT = 276 (0) + 12/0 (0)
TS = 02 (0) + 4/0 (0)
TK = 02 (0) + 5/0 (0)
SLV = 00 (0) + 0/2 (0)
Note: FR = Frigate
GB = Gun Boat
MWS = Mine Warfare Ship
BDT = Barco Del Torpedo
TS = Troop Ship
TK = Tanker
SL = Sloop
SLV = Sea-Lift Vessel
Hopefully no errors!