Danish Naval Developments Q4 1932
a/ Industrial Allocation
9/11 factories producing materiel for shipbuilding = 9000 tons
2/11 factories (fixed) producing infrastructure materiel =0.2 pts + 0.2 bonus pts
0/11 Factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
Slip No.5 (Type 0) at Aalborg extending to type 1, receives 0.2 IP = Total 1.0 IP points, completed
Drydock No.1 (Type 0) at Phuket continues construction, receives 0.2 IP (Danish), 0.1 IP (Italian) and 0.3 IP (Iberian) = Total 0.8 IP points, balance 0.2 pts
c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Eias, CA, laid down 02/08/32, receives 1769 tons, balance 9,395 tons
No.2 type 2 slip – Skalmold, CL, laid down 02/10/32, receives 1164 tons, balance 4548 tons
No.3 type 1 slip – Lancer (e), DD, laid down 02/04/32, receives 440 tons, balance 226 tons
No.4 type 1 slip – Lancer (f), DD, laid down 02/04/32, receives 440 tons, balance 226 tons
No.1 type 3 drydock – Idle
Dock side – Idle
Aarhus-
No.1 type 3 slip – Einmyria, CA, laid down 02/02/32, receives 1,749 tons, balance 5,857 tons
No.2 type 2 slip – Herja, CL, laid down 02/10/32, receives 1165 tons, balance 4548 tons
No.3 type 1 slip – Lancer (g), DDL, laid down 02/04/32, receives 400 tons, balance 226 tons
No.4 type 1 slip – Lancer (h), DDL, laid down 02/04/32, receives 400 tons, balance 226 tons
No.1 type 3 drydock –
No.2 type 2 drydock - Idle
Dock side - Ull, DD, laid down 02/04/32, receives 536 tons, balance 348 tons
Dock side - Herfjötur, CL, laid down 02/07/31, receives 1,053 tons to complete
Dock side – Idle
Dock side - Idle
Aalborg-
No.1 type 1 slip – Artemis, DD, laid down 02/04/32, receives 536 tons, balance 348 tons
No.2 type 1 slip – Idle
No.3 type 1 slip – Idle
No.4 type 1 slip - Idle
No.5 type 0 slip – EXTENDING
No.6 type 0 slip - Idle
Dock side - Idle
Dock side - Idle
Dock side - Idle
Dock side - Idle
Bangkok-
No.1 type 1 slip – Idle
No.2 type 0 slip – Idle
No.3 type 0 slip – Idle
No.1 type 2 drydock –Idle
Dock side – Idle
Phuket-
No.1 type 0 drydock – BUILDING
d/ Transactions
750 tons from Siam for refitting of KDM Sjaelland prior to transfer to Siamese Navy, Total 3,000 tons
e/ Other Notes
KDM Geirahöd commissions on 13/12/1932
KDM Phlox commissions on 29/10/1932
KDM Cornflower commissions on 29/10/1932
KDM Guldsmed commissions on 18/12/1932
KDM Regnorm commissions on 18/12/1932
KDM Gammelmoso commissions on 10/11/1932
KDM Lyngso commissions on 10/11/1932
KDM c(Lancer) continues sea trials until 13/03/1933
KDM d(Lancer) continues sea trials until 13/03/1933
KDM Hrist continues sea trials until 14/03/1933
KDM Herfjotur commences sea trials on 16/12/1932
Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 856 tons
f/ Order of Battle
Note:
Y)+Z = In Service (under repair/refit) + building/on order (breaking)
BB = 02 (0) + 0/0 (0)
CDS = 00 (0) + 0/0 (0)
CA = 02 (0) + 2/0 (0)
CL = 18 (1) + 4/0 (3)
CV(X) = 01 (0) + 0/0 (0)
DD = 28 (0) + 6/0 (0)
SL = 16 (0) + 0/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)