Total
11 factories
Fixed on infrastructure 3 building 0,3IP
Non fixed 8
5 on IP
3 on WSM
Factory P5 (36%complete)
Factory R6 (67%complete)
Production 9000t
Stockpile 1045t
Used on construction
Poland 3300t
Romania 4500t
Jugoslavia NON
Total 2600t
Transferd
NONE
total used 7800t
New stockpile 3135t
Infrastructure
2,8IP
Poland: NON
Romania: NON
Yugoslavia:NON
Naval construction
Poland
at Danzig:
1 Type 2 slip building cruiser vz31 500t used(6000t of 13000t used)
1 Type 1 slips Building Peggy Brown DD 200t used(1100t of 1100t)
1 Type 1 slips Building Peggy Brown DD 200t used(1100t of 1100t)
1 Type 0 slips Idle
1 Type 0 slips Idle
1 type 2 drydock uprading (0,5 IP recived)
1 Type 1 drydock Idle
at Koszalin
1 Type 1 slips Building Peggy Brown DD 200t used(1100t of 1100t)
1 Type 0 slips Idle
1 Type 0 slips Idle
1 Type 2 drydock Idle
2 Type 0 drydocks idle
Peggy brown 1 to 3 undergoing trails
Romania
at Galatz:
1 Type 0 slip Idle
1 Type 0 drydock Idle
at Constanta:
1 Type 1 slips building vz31 500t used(2100t of 2100t)
1 Type 1 slips building vz31 500t used(2100t of 2100t)
3 Type 0 slips Idle
1 Type 2 drydock building Cruiser vz31 500t used(6000t of 13000t)
1 Type 1 drydock Idle
1 Type 0 drydock Idle
DD vz31 1 and 2 undergoing trails
Yugoslavia
at Belgrade:
1 Type 0 slip Idle
1 Type 0 drydock Idle
at Bar
1 Type 2 slip Idle
1 Type 1 drydock Idle
2 Type 0 slips Idle
1 Type 0 drydock Idle
Clear as mud...
Errors may creap in there some were...