You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

Ubiwan

Unregistered

1

Friday, September 15th 2006, 8:06am

Chinese Naval Developments - Q2/1932

Chinese Naval Developments - Q2/1932 (April / May / June):

A. Industiral Allocation

Stockpile Q2/1932: 39 tons

4/5 factories (non-fixed) to naval materials: 4000 tons created for Q2/1932

used at Taku 771tons
used at Shanghai 1200tons
used at Zhanjiang 472tons
used for small vessels 54tons
used for Transaction 1531tons

warmaterial recycling 0tons (first quarter)
warmaterial recycling 0tons (second quarter)


=> 4000tons (manufactured) + 39tons (stockpiled) + 0tons (recycled) - 1531tons (Transaction)= 2508tons


Stockpile after Q2/1932: 11tons


1/5 factories (fixed) to infrastructure development: 0.1 points for Q2/1932


B. Infrastructure Development

upgrading type 1 slip at Taku into type 2 slip, 0.4 points needed, 0.6 points used, 0.1 points added (0.1pt production)



C. Naval Construction

at Taku:
Type 1 slip not in use
Type 1 slip not in use
Type 1 slip upgrading into type 2 slip
Type 0 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 1 drydock not in use
Type 0 drydock not in use
Type 0 drydock not in use


Freefloating / in completation:
CL Lienyun
2000 tons needed; 280tons received (~60% completed)

CL Hainan
2000 tons needed; 280tons received (~60% completed)

CLCV-1
111 tons needed; 111tons received (completed)

Shuihong
100 tons needed; 100tons received (completed)


at Shanghai:
Type 2 slip not in use
Type 1 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 2 drydock laid down 20.08.1931; Building CSS Luda - Class (5309tons); 4300tons needed; 300tons received (~25% completed)
launchingdate: ~ 1932 [Name: CSS Luda]
Type 1 drydock scraping PC Hai Yung (25.June completed = 490tons for recycling)


Freefloating / in completation:
CA Kaifeng
3800tons needed; 300tons received (~54% completed)

CL Chagda
2500tons needed; 200tons received (~46% completed)

Huangfen 604
200tons needed; 200tons received (completed)

Huangfen 605
200tons needed; 200tons received (completed)




at Zhanjiang:
Type 1 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 1 drydock not in use

Freefloating / in completation:
CL Hegu
2500tons needed; 300tons received (~46% completed)

Huangfen 606
172tons needed; 172tons received (completed)



D. Transactions

to Germany:
--------------
375tons for Building "Bajoi"
125tons the fourth of four rates for the Licence of the 28cm cannon

to India:
------------
278tons for building "Yamlai"
150tons the third of four rates for the Licence of the super destroyer

to Russia:
------------
603tons for Building "Haijui"


E. Other Notes
Scraping of the "Hai Yung" (3,264 t light displacement = 4 month ; 25.February till 25.June); 490tons can be recycled


F. Small vessels
RP-Boat Youkan-Class 200; constructed and launched in Q2/1932 ; 18 tons received
RP-Boat Youkan-Class 201; constructed and launched in Q2/1932 ; 18 tons received
RP-Boat Youkan-Class 202; constructed and launched in Q2/1932 ; 18 tons received


G. Shakedown cruises
U-1
begin of shakedown cruise February; End of shakedown cruise August
CLCV-1
begin of shakedown cruise April; End of shakedown cruise July
Shuihong
begin of shakedown cruise April; End of shakedown cruise July
Huangfen 604
begin of shakedown cruise May; End of shakedown cruise November
Huangfen 605
begin of shakedown cruise May; End of shakedown cruise November
Huangfen 606
begin of shakedown cruise May; End of shakedown cruise November

small vessels:
RP-Boat Youkan-Class 200
RP-Boat Youkan-Class 201
RP-Boat Youkan-Class 202


H. Order of Battle
Note: X(Y)+Z = In Service (under repair/refit) + building/on order (breaking) + shakedown cruise

BB = 00 (0) + 0/0 (0) + 0
CA = 01 (0) + 1/0 (0) + 0
CL = 05 (0) + 4/0 (0) + 0
PC = 00 (0) + 0/0 (1) + 0
DD = 04 (0) + 1/0 (0) + 0
FR = 00 (0) + 1/0 (0) + 0
SL = 00 (0) + 0/0 (0) + 1
CSS = 00 (0) + 1/0 (0) + 0
GB = 02 (0) + 0/0 (0) + 0
RGB = 19 (0) + 0/0 (0) + 0
RPB = 00 (0) + 0/0 (0) + 3
TB = 08 (0) + 0/0 (0) + 3
TGB = 03 (0) + 0/0 (0) + 0
STC = 04 (0) + 1/0 (0) + 0
SUB = 00 (0) + 0/0 (0) + 1
LCV = 00 (0) + 0/0 (0) + 1
MWS = 00 (0) + 0/0 (0) + 0
AMC = 00 (0) + 0/0 (0) + 0
DV = 02 (0) + 0/0 (0) + 0
TS = 02 (0) + 0/0 (0) + 0

Note:
PC = Protected Cruiser
FR = Frigate
SL = Sloop
CSS = Chinese Support Ship
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
RGB = River Gun Boat
TGB = Torpedo Gun Boat
DV = Despatch Vessel
TS = Training Ships


#######################
Hope there is no fault in my report
#######################