[SIZE=4]SAE Quarterly Reports[/SIZE]
No. 44 – October to December 1931
[SIZE=3]Transfers:[/SIZE]
525ts received from Mexico.
520ts received from Australia.
2,592ts received from India.
[SIZE=3]
Factories: [/SIZE]
26 factories total can be used.
Fixed factories
4 factory will be fixed to produce infrastructure points for 1931.
Flexible factories
1,061ts material transferred from Q3 (incl. material recovered from scrapyard).
17,799ts material necessary to be produced in this quarter (18 factories).
4 factories will produce infrastructure points this quarter.
Infrastructure points used this quarter:
1,2put into an extention of a Type 2 Slip in Buenos Aires for a total of 3,3pts at the end of Q4.
[SIZE=3]
Ships: [/SIZE]
Minor vessels
Completed Units
48x UJ26-class ASW launch
16x UJ30-class ASW launch
48x R28-class motor launch
8x R31-class motor launch
8x Tree-class minesweeper (Type 16)
16x Bush-class minesweeper (Type 21)
14x Cactus-class minesweeper (Type 2
4x Polar-class sloops
8x S-class sloops
2x Circe-class sloops
16x River-class frigate
8x Pleiades-class light destroyers
8x Planet-class light destroyers
6x Guard-class patrol crafts
On Trials
4x R31-class motor launch
-
R57-R60 running trials until December 31
2x MS28-class minesweeper
-
Faucaria running trials until February 32
-
Eberlanzia running trials until February 32
Ordered Units
1x SL29-class sloop (11 month á 100ts material necessary per unit)
-
Euryale laid down in Montevideo on a Type 1 slip in January, completed October 31
4x R31-class motor launch (1 month á 95ts material necessary per unit)
-
R61-R64 build in Lüderitz in December
4x UJ30-class ASW launch (1 month á 196ts material necessary per unit)
-
UJ65-UJ68 build in Lüderitz in November
Rebuilds
None
Scrapping
8x SL14-class (4 month total, 2 month in Type 0 dock)
-
Steadfast scrapping in Durban starting in January, finished in April – 142ts received from hull for Q4/1931
-
Swordsman scrapping in Prince Eduard Islands starting in Frebruary, finished in May – 142ts received from hull for Q4/1931
-
Storm scrapping in Libreville starting in January, finished in April – 142ts received from hull for Q4/1931
-
Stalwart scrapping in Durban starting in June, finished in September – 142ts received from hull for Q1/1932
-
Success scrapping in Prince Eduard Islands starting in June, finished in September – 142ts received from hull for Q1/1932
-
Strenuous scrapping in Libreville starting in May, finished in August – 142ts received from hull for Q1/1932
-
Sturdy scrapping in Libreville starting in September, finished in December – 142ts received from hull for Q2/1932
-
Scourge scrapping in Durban starting in November, finished in February 32 – 142ts received from hull for Q3/1932
Destroyers
Completed Units
12x Cat-class torpedoboat
12x Hound-class torpedoboat (Type 21)
12x Hound-class torpedoboat (Type 26)
12x Nymph-class destroyer (Type 21)
12x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
8x Nymph-class destroyer (Type 30)
8x DL28-class destroyer leader (Type 2
On Trials
None
Ordered Units
8x DD30-class destroyer (11 month á 145ts material necessary per unit)
-
Thetis laid down in Durban on a Type 1 slip in January, completed in November 31
-
Thoe laid down in Cape Town on a Type 2 slip in March, completed in January 32
-
Thaleia laid down in Cape Town on a Type 1 slip in January, completed in November 31
-
Arethusa laid down in Port Elizabeth on a Type 1 slip in January, completed in November 31
-
Albuneia laid down in Daressalam on a Type 2 slip in March, completed in January 32
-
Egeria laid down in Daressalam on a Type 1 slip in January, completed in November 31
-
Iuturna laid down in Port Louis on a Type 1 slip in July, completed in May 32
-
Karmena laid down in Buenos Aires on a Type 1 slip in September, completed in August 32
Rebuilds
None
Scrapping
None
Class B Cruisers
Completed Units
2x Nampula-class light cruiser
6x Port Shepstone-class light cruiser
4x Santa Fe-class light cruiser
3x Yaounde-class light cruiser
4x Libreville-class light cruiser
4x Rosario-class light cruiser
4x Aurora-class light cruiser
4x Arion-class light cruiser
2x Douala II-class light cruiser
2x Fenris-class destroyer leader
On Trials
1x DL30-class destroyer leader
-
Freki running trials until December 31
2x CL29-class light cruiser
-
Beira II running trials until January 32
-
Blantyre II running trials until January 32
1x CL16-class light cruiser
-
Santana running trials until January 32
Ordered Units
2x DL30-class destroyer leader (12 month á 218ts material necessary per unit)
-
Cerberus laid down in Mar del Plata on a Type 2 Slip in December, completed in November 31
-
Python laid down in Mar del Plata on a Type 2 Slip in December, completed in November 32
2x CL31-class light cruiser (17 month á 468ts material necessary per unit)
-
Ajax laid down in Durban on a Type 3 slip in August, completed in December 32
-
Achilles laid down in Cape Town on a Type 3 slip in October, completed in February 33
1x DL31-class destroyer leader (13 month á 296ts material necessary per unit)
-
Fasold laid down in Durban on a Type 2 slip in October, completed in October 32
Rebuilds/Refits
1x CL16-class light cruiser (12 month á 192ts/month material necessary per unit)
-
Parana entering a Type 2 dock in Daressalam in November. Leaving the dock in March 31, the cruiser will stay in the yard until October 31
1x CL19-class light cruiser (4 month á 299ts/month material necessary per unit)
-
Yaounde entering a Type 2 dock in Durban in July. Leaving the dock in August 31, the cruiser will stay in the yard until October 31
Scrapping
None
Class A Cruisers
Completed Units
1x Colony-class AC
4x Cape-class (Type 23)
2x Cape-class (Type 26)
1x Dragon-class (Type 29)
On Trials
1x CA29-class heavy cruiser
-
Fafnir running trials until October 31
Ordered Units
None
Refits
None
Scrapping
None
Capital Units
Completed Units
2x Hertog-class
4x Koning-class
2x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class
On Trials
None
Ordered Units
2x BB29O-class battleship (47 month á 800ts material necessary per unit)
-
Imperator laid down in Durban on a Type 4 slip in January, completed in November 34
-
Conqueror laid down in Montevideo on a Type 4 slip in January, completed in November 34
2x BC31-class battle cruiser (39 month á 764ts material necessary per unit)
-
Triumph laid down in Port Elizabeth on a Type 4 slip in January, completed in March 34
-
Victory laid down in Durban on a Type 4 slip in April, completed in June 34
Rebuilds
None
Scrapping
None
Coastal Defence Units
Completed Units
1x Nagelring-class
1x Tyrfing-class
1x Gungnir-class
2x LCDS-class
2x LCDS-2-class
On Trials
None
Ordered Units
None
Carriers
Completed Units
1x Hammer-class (Type 25B)
1x Forge-class (Type 26)
Ordered Units
2x CV30-class light fleet carrier (23 month á 587ts material necessary per unit)
-
Anvil laid down in Cape Town on a Type 3 slip in January, completed in November 31
-
Gripper laid down in Buenos Aires on a Type 3 slip in August, completed in June 32
On Trials
None
Ordered Units
None
Class A Submarines
Completed Units
11x E-class submarine
15x F-class submarine
4x J-class submarine
Ordered Units
2x L-class submarine (10 month á 87ts material necessary per unit)
-
L1 laid down in Buenos Aires on a Type 0 slip in January, completed in October 31
-
L2 laid down in Buenos Aires on a Type 0 slip in November, completed in August 32
Class B Submarines
Completed Units
15x I-class submarine
12x H-class submarine
16x K-class submarine
On Trials
None
Ordered Units
None
Scrapping
7x G-class (4 month total, 1 month in Type 0 dock)
-
G16 scrapping in Buenos Aires starting in February, finished in May – 69ts received from hull for Q4/1931
-
G8 scrapping in Mar del Plata starting in January, finished in April – 69ts received from hull for Q4/1931
-
G14 scrapping in Montevideo starting in April, finished in July – 69ts received from hull for Q1/1932
-
G18 scrapping in Buenos Aires starting in June, finished in September – 69ts received from hull for Q1/1932
-
G10 scrapping in Mar del Plata starting in May, finished in August – 69ts received from hull for Q1/1932
-
G15 scrapping in Montevideo starting in September, finished in December – 69ts received from hull for Q2/1932
-
G11 scrapping in Mar del Plata starting in September, finished in December – 69ts received from hull for Q2/1932
Non-combatants
Completed Units
1x Bay-class tender (Type 04)
0x Bay-class tender (Type 05)
2x Bay-class tender (Type 0
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 19)
4x Bay-class tender (Type 23)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
4x Mimir-class floatplane carriers
2x Bölthorn-class floatplane carrier
1x Thjazi-class floatplane carrier
On Trials
None
Ordered Units
1x Thjazi-class floatplane carrier (15 month á 354ts material necessary per unit)
-
Ymir laid down in Montevideo on a Type 2 slip in July, completed in September 31
1x TD29-class tender (14 month á 304ts material necessary per unit)
-
Stilbaai laid down in Durban on a Type 1 slip in January, completed in February 32
Refits
2x TD05-class tender (3 month á 238ts/month material necessary per unit)
-
Antongil Bay entering a Type 2 dock in Montevideo in July. Leaving the dock in July 31, the tender will stay in the yard until September 31
-
Walvis Bay entering a Type 1 dock in Montevideo in July. Leaving the dock in July 31, the tender will stay in the yard until September 31
---------------------------------------------------------------------------------------------------------------------
At the end of this quarter the RSAN consists of (units in service only):
64 ASW launches
56 motor launches
38 minesweepers
52 small patrol crafts
92 TB/DD/DLs of less than 2,000ts
35 cruisers category b
8 cruisers category a
14 capital units
7 costal defence ships
2 fleet carrier
43 submarines category b
30 submarines category a
7 floatplane carriers
18 armed tenders
plus numerous auxiliary vessels of all kind.