Iberian Naval Developments Q4 1931
a/ Industrial Allocation
13/23 factories producing materiel for shipbuilding =13000 tons
10/23 factories (fixed) producing infrastructure materiel =1.0 points + 1.0 bonus pts
0/23 factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
Factory no. 24 continues construction, receives 0.4 points = Total 6.6 points
No.3 Type 0 drydock, La Coruna, extending to type 1, receives 0.4 pts = Total 1.0 pts, complete.
No.4 Type 0 drydock, La Coruna, extending to type 1, receives 0.4 pts = Total 1.0 pts, complete.
No.2 Type 0 drydock, San Lorenzo, extending to type 1, receives 0.4 pts = Total 1.0 pts, complete.
No.4 Type 0 drydock, Panama, extending to type 1, receives 0.4 pts = Total 1.0 pts, complete.
c/ Naval Construction
Cadiz-
No.1 type 5 slip – Idle
No.2 type 4 slip – San Cristobal, TS, laid down 02/01/31, receives 1361 tons, balance 2028 tons
No.3 type 3 slip – Idle
No.4 type 2 slip – Idle
No.5 type 2 slip – Salpicadura, FT, laid down 02/01/31, receives 1602 tons, balance 3893 tons
No.6 type 2 slip – Idle
No.1 type 4 drydock – Idle
No.2 type 3 drydock – Idle
Dock side – Idle
Dock side – Idle
Barreiro-
No.1 type 4 slip – Rocie, FT, laid down 02/01/31, receives 1602 tons, balance 3893 tons
No.2 type 3 slip – Idle
No.3 type 3 slip – Idle
No.4 type 1 slip – Idle
No.5 type 1 slip – Sc1, Sc2, Sub, laid down 01/07/31, receives 142 tons to complete
No.6 type 1 slip – Sc3, Sc4, Sub, laid down 01/07/31, receives 142 tons to complete
No.1 type 5 drydock – Idle
No.2 type 3 drydock – Idle
No.3 type 0 drydock – Idle
No.4 type 0 drydock – Idle
Dock side – Idle
Porto-
No.1 type 4 slip – San Nicolas, TS, laid down 02/01/31, receives 1361 tons, balance 2028 tons
No.2 type 3 slip – Sc7, SC8, Sub, laid down 01/10/30, receives 297 tons each, balance 142 tons each
No.3 type 3 slip – Idle
Dock side – Idle
La Coruna-
No.1 type 2 slip – Sc5, Sc6, Sub, laid down 01/07/31, receives 142 tons each to complete
No.1 type 2 drydock – Idle
No.2 type 1 drydock – Idle
No.3 type 0 drydock – EXTENDING
No.4 type 0 drydock – EXTENDING
Dock side – Idle
Santander-
No.1 type 3 slip – Idle
No.2 type 2 slip – Idle
No.3 type 1 slip – C93, SL, laid down 02/04/1931, receives 364 tons, balance 148 tons
No.4 type 1 slip – C94, SL, laid down 02/04/1931, receives 364 tons, balance 148 tons
No.5 type 1 slip – C95, SL, laid down 02/04/1931, receives 364 tons, balance 148 tons
No.6 type 1 slip – C96, SL, laid down 02/04/1931, receives 364 tons, balance 148 tons
No.1 type 2 drydock – Idle
Dock side – Idle
Dock side – Idle
Santiago De Cuba-
No.1 type 2 slip – Idle
No.2 type 1 slip – Idle
No.3 type 1 slip – C97, SL, laid down 02/04/1931, receives 364 tons, balance 148 tons
No.1 type 4 drydock - Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – C98, SL, laid down 02/04/1931, receives 364 tons, balance 148 tons
Dock side – Idle
Dock side – Idle
San Lorenzo-
No.1 type 3 drydock – Idle
No.2 type 0 drydock – EXTENDING
Dock side – Idle
Panama-
No.1 type 2 slip – Idle
No.2 type 1 slip – Idle
No.3 type 1 slip – C99, SL, laid down 02/04/1931, receives 364 tons, balance 148 tons
No.4 type 1 slip – C100, SL, laid down 02/04/1931, receives 364 tons, balance 148 tons
No.5 type 1 slip – Idle
No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle
No.4 type 0 drydock – EXTENDING
Dock side – Idle
Dock side – Idle
Luanda-
No.1 type 1 slip – Idle
No.2 type 1 slip – Idle
No.3 type 1 slip – C101, SL, laid down 02/04/1931, receives 364 tons, balance 148 tons
No.4 type 1 slip – C102, SL, laid down 02/04/1931, receives 364 tons, balance 148 tons
No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle
No.4 type 1 drydock – Idle
Dock side – Idle
Dock side – Idle
San Hainando-
No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle
d/ Transactions
None
e/ Other Notes
Breaking of the following ships:-
None
Re-Fitting (25%) of the following ships:-
None
Re-Building (50%) of the following ships:-
None
Sea trials of the following vessels:-
Sc1 – Sc6 commence sea trials on 11/11/1931
C87 – C92 continue sea trials until 18/02/1931
Commissioning of the following vessels:-
BDT205 – BDT216 commission on 29/10/1931
Tonnage from scrapping = 0
Tonnage Carried Over From This Quarter = 1704 tons
Total Tonnage Carried Over From This Quarter = 1704 tons
f/ Order of Battle
Note: W(X)+Y(Z) = In Service (under repair/refit) + building/on order (breaking)
BB = 08 (0) + 0/0 (0)
BC = 04 (0) + 0/0 (0)
CDS(CE) = 05 (0) + 0/0 (0)
CA = 10 (0) + 0/0 (0)
CL = 49 (0) + 4/0 (0)
CV = 02 (0) + 2/0 (0)
DD = 99 (0) + 0/0 (0)
FR = 16 (0) + 0/0 (0)
GB = 86 (0) + 6/0 (0)
SL = 00 (0) + 10/0 (0)
SUB = 40 (0) + 0/0 (0)
MWS = 32 (0) + 0/0 (0)
BDT = 204 (0) + 12/0 (0)
TS = 00 (0) + 2/0 (0)
TK = 00 (0) + 2/0 (0)
Note: FR = Frigate
GB = Gun Boat
MWS = Mine Warfare Ship
BDT = Barco Del Torpedo
TS = Troop Ship
TK = Tanker
SL = Sloop