You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

Ubiwan

Unregistered

1

Monday, July 17th 2006, 2:51pm

Chinese Naval Developments - Q3/1931 (July / August / September):

Chinese Naval Developments - Q3/1931 (July / August / September):

A. Industiral Allocation

Stockpile before Q3/1931: 31 tons

4/5 factories (non-fixed) to naval materials: 4000 tons created for Q3/1931
used at Taku 500tons
used at Shanghai 1600tons
used at Zhanjiang 500tons
used for small vessels 94tons
for the special use 300tons
used for Transaction 1037tons

=> 4000tons (manufactured) + 31tons (stockpiled) - 1037tons (Transaction)= 2994tons

Stockpile after Q3/1931: 0tons


1/5 factories (fixed) to infrastructure development: 0.1 points for Q3/1931


300tons invested in Upgrading the factory for the licence Production of the "Rhino"-Truck (Atlantis-Design)


B. Infrastructure Development

upgrading type 1 slip at Taku into type 2 slip, 0.8 points needed, 0.2 points used, 0.1 points added



C. Naval Construction

at Taku:
Type 1 slip not in use
Type 1 slip not in use
Type 1 slip upgrading into type 2 slip
Type 0 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 1 drydock not in use
Type 0 drydock not in use
Type 0 drydock not in use

Freefloating / in completation:
CL Lienyun
2740 tons needed; 250tons received (~42% completed); launched 17.07.1931
CL Hainan
2740 tons needed; 250tons received (~42% completed); launched 28.07.1931



at Shanghai:
Type 2 slip CA Hong Lung-Class (7551tons); 2000tons build; 5551tons needed; 800tons received (~37% completed); [CAKaifeng]
Type 1 slip CL Wenshan-Class (4240tons); 1000tons build; 3240tons needed; 250tons received (~30% completed); [CLChagda]
Type 0 slip not in use
Type 0 slip not in use
Type 2 drydock laid down 20.08.1931; CSS Luda - Class (5309tons); 0tons build; 5309tons needed; 300tons received (~4% completed) [CSSLuda]
Type 1 drydock not in use

Freefloating / in completation:
Huangfen 604
587 tons needed; 125tons received (~45% completed); launched 03.August 1931
Huangfen 605
587 tons needed; 125tons received (~45% completed); launched 03.August 1931




at Zhanjiang:
Type 1 slip CL Wenshan-Class (4240tons); 1000tons build; 3240tons needed; 250tons received (~29% completed) [CLHegu]
Type 0 slip not in use
Type 0 slip not in use
Type 1 drydock not in use

Freefloating / in completation:
Huangfen 606
587 tons needed; 125 tons received (~45% completed); launched 22.September 1931
U-1
412 tons needed; 125 tons received (~46% completed); launched 29.September 1931



D. Transactions

to Germany:
-----------
512tons for Building "Bajoi"
125tons the first of four rates for the Licence of the 28cm cannon

to India:
---------
300 tons for Licence Building "Umred"-Design
100 tons for Licence Building "Landing Craft"-Design



E. Other Notes
None



F. Small vessels
Shanghai-Class 101; constructed and launched in August 1931 ; 94 tons received



G. Shakedown cruises
Shanghai-Class 100 in servie 1.July 1931 (end of shakedown cruises 22.06.1931)
Shanghai-Class 101 begin of shakedown cruise 1.September 1931