Danish Naval Developments Q1 1931
a/ Industrial Allocation
9/11 factories producing materiel for shipbuilding = 9000 tons
2/11 factories (fixed) producing infrastructure materiel =0.2 pts
0/11 Factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
Slip No.5 (Type 0) at Aalborg building, receives 0.1 IP = Total 0.1 IP points, balance 0.4 pts
Slip No.6 (Type 0) at Aalborg building, receives 0.1 IP = Total 0.1 IP points, balance 0.4 pts
c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Reginleif, CL, laid down 02/01/31, receives 1,165 tons, balance 4548 tons
No.2 type 2 slip – Sváva, CL, laid down 02/04/30, receives 1,170 tons, balance 1072 tons
No.3 type 1 slip – a (Lancer), DDL, laid down 02/01/31, receives 440 tons, balance 1106 tons
No.4 type 1 slip – b (Lancer), DDL, laid down 02/01/31, receives 440 tons, balance 1106 tons
No.1 type 3 drydock – Idle
Dock side – Kára, CL, laid down 02/01/30, receives 1072 tons to complete
Dock side – Lavender , SL, laid down 02/07/30, receives 349 tons, balance 137 tons
Dock side – Orchid , SL, laid down 02/07/30, receives 349 tons, balance 137 tons
Aarhus-
No.1 type 3 slip – Sigrún, CL, laid down 01/10/30, receives 1170 tons, balance 3412 tons
No.2 type 2 slip – Mist, CL, laid down 01/10/30, receives 1170 tons, balance 3412 tons
No.3 type 1 slip – Idle
No.4 type 1 slip – Idle
No.1 type 3 drydock - Idle
No.2 type 2 drydock - Idle
Aalborg-
No.1 type 1 slip – Fuschia, SL, laid down 02/01/31, receives 349 tons, balance 835 tons
No.2 type 1 slip – Nigella, SL, laid down 02/01/31, receives 349 tons, balance 835 tons
No.3 type 1 slip – Kalorm, MWS, laid down 15/10/1930, receives 245 tons, balance 310 tons
No.4 type 1 slip - Tusindben, MWS, laid down 15/10/1930, receives 245 tons, balance 310 tons
No.5 type 0 slip - Building
No.6 type 0 slip - Building
Dock side – Myre, MWS, laid down 02/01/1930, receives 65 tons to complete
Dock side – Bi, MWS, laid down 02/01/1930, receives 65 tons to complete
Dock side – Bille, MWS, laid down 15/05/1930, receives 65 tons to complete
Dock side – Sommerfugl, MWS, laid down 15/05/1930, receives 65 tons to complete
Dock side - Jasmine, SL, laid down 01/07/30, receives 349 tons, balance 137 tons
Dock side - Dahlia, SL, laid down 01/07/30, receives 349 tons, balance 137 tons
Bangkok-
No.1 type 1 slip – Idle
No.2 type 0 slip – Norreso, GB, laid down 02/01/31, receives 283 tons, balance 133 tons
No.3 type 0 slip – Sonderso, GB, laid down 02/01/31, receives 283 tons, balance 133 tons
No.1 type 2 drydock –Idle
Dock side – Sunflower, SL, laid down 02/06/30, receives 349 tons, balance 137 tons
d/ Transactions
None
e/ Other Notes
KDM Tulip commissions on 29/01/31
KDM Daffodil commissions on 29/01/31
KDM Rodso commissions on 09/02/31
KDM Tjele Langso commissions on 09/02/31
KDM Myre continues sea trials until 21/04/1931
KDM Bi continues sea trials until 21/04/1931
KDM Carnation continues sea trials until 02/05/1931
KDM Bluebell continues sea trials until 02/05/1931
KDM Marigold continues sea trials until 02/05/1931
KDM Róta continues sea trials until 15/06/1931
KDM Bille commences sea trials on 05/03/1931
KDM Sommerfugl commences sea trials on 05/03/1931
KDM Kára commences sea trials on 20/03/1931
Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 128 tons
f/ Order of Battle
Note:
Y)+Z = In Service (under repair/refit) + building/on order (breaking)
BB = 02 (0) + 0/0 (1) (Tegetthoff)
CDS = 00 (0) + 0/0 (0)
CA = 02 (0) + 0/0 (0)
CL = 15 (0) + 6/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 26 (0) + 2/0 (0)
SL = 02 (0) + 12/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 23 (0) + 2/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 07 (0) + 6/0 (0)
AMC = 01 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)