Siamese Naval Developments Q1 1931
a/ Industrial Allocation
0/1 factories producing materiel for shipbuilding = 0 tons
1/1 factories (un-fixed) producing infrastructure materiel = 0.1 points
b/ Infrastructure Development
No.1 type 0 drydock, Phuket, receives 0.1 point balance 0.7 points
c/ Naval Construction
Bangkok-
No.1 type 1 drydock –
Patrol boat, “Surawit Choungjamnongjit”, laid down 02/01/1931, receives 196 tons, balance 144 tons
No.2 type 1 drydock -
Patrol boat, “Songkarm Rahoung”, laid down 02/01/1931, receives 196 tons, balance 144 tons
d/ Transactions
None
e/ Other Notes
RSNS Witchaya Riddhidej commissions on 05/03/1931
RSNS Porntep Bunraksa commissions on 05/03/1931
Tonnage Carried Over From This Quarter = 238
f/ Order of Battle
Note:
Y)+Z = completed (under repair/refit) + building/on order
CDS = 02 (0) + 0/0
DD = 01 (0) + 0/0
GB = 03 (0) + 0/0
PB = 04 (0) + 2/0
MTB = 04 (0) + 0/0
Royal = 01 (0) + 0/0