You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, July 16th 2006, 10:42pm

Siam, Quarter 1, 1931

Siamese Naval Developments Q1 1931

a/ Industrial Allocation
0/1 factories producing materiel for shipbuilding = 0 tons
1/1 factories (un-fixed) producing infrastructure materiel = 0.1 points

b/ Infrastructure Development
No.1 type 0 drydock, Phuket, receives 0.1 point balance 0.7 points

c/ Naval Construction
Bangkok-
No.1 type 1 drydock –
Patrol boat, “Surawit Choungjamnongjit”, laid down 02/01/1931, receives 196 tons, balance 144 tons
No.2 type 1 drydock -
Patrol boat, “Songkarm Rahoung”, laid down 02/01/1931, receives 196 tons, balance 144 tons

d/ Transactions
None

e/ Other Notes
RSNS Witchaya Riddhidej commissions on 05/03/1931
RSNS Porntep Bunraksa commissions on 05/03/1931

Tonnage Carried Over From This Quarter = 238

f/ Order of Battle
Note: X(Y)+Z = completed (under repair/refit) + building/on order

CDS = 02 (0) + 0/0
DD = 01 (0) + 0/0
GB = 03 (0) + 0/0
PB = 04 (0) + 2/0
MTB = 04 (0) + 0/0
Royal = 01 (0) + 0/0