You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Thursday, July 13th 2006, 9:29pm

Quarterly Report #42 for the SAE

[SIZE=4]SAE Quarterly Reports[/SIZE]

No. 42 – April to June 1931


[SIZE=3]Transfers:[/SIZE]


1,000ts received from Peru.


[SIZE=3]Factories:[/SIZE]

26 factories total can be used.

Fixed factories

4 factory will be fixed to produce infrastructure points for 1931.

Flexible factories

1,315ts material transferred from Q1 (incl. material recovered from scrapyard).

21,747ts material necessary to be produced in this quarter (22 factories).

0 factories will produce infrastructure points this quarter.

Infrastructure points used this quarter:

0,4put into an extention of a Type 3 Slip in Montevideo for a total of 3,7pts at the end of Q2.


[SIZE=3]Ships:[/SIZE]

Minor vessels


Completed Units

48x UJ26-class ASW launch
12x UJ30-class ASW launch

48x R28-class motor launch

15x Tree-class minesweeper (Type 16)
16x Bush-class minesweeper (Type 21)
8x Cactus-class minesweeper (Type 28)

4x Polar-class sloops
10x S-class sloops
1x Circe-class sloops

16x River-class frigate

8x Pleiades-class light destroyers
6x Planet-class light destroyers

6x Guard-class patrol crafts

On Trials

5x MS28-class minesweeper
- Gibbaeum running trials until June 31
- Frithia running trials until May 31
- Fenestraria running trials until May 31
- Dracophilus running trials until May 31
- Drosanthemum running trials until April 31
- Delosperma running trials until April 31

2x LD29-class light destroyer
- Pluto running trials until April 31
- Neptune running trials until April 31

1x SL29-class sloop
- Medusa running trials until June 31

4x R31-class motor launch
- R49-R52 running trials until May 31

4x UJ30-class ASW launch
- UJ61-UJ64 running trials until June 31

Ordered Units

2x MS28-class minesweeper (Type 28 - 10 month á 56ts material necessary per unit)
- Faucaria laid down in St. Helena on a Type 1 slip in November, completed August 31
- Eberlanzia laid down in St. Helena on a Type 0 slip in November, completed August 31

1x SL29-class sloop (11 month á 100ts material necessary per unit)
- Euryale laid down in Montevideo on a Type 1 slip in January, completed October 31

4x R31-class motor launch (1 month á 95ts material necessary per unit)
- R53-R56 build in Lüderitz in June

Rebuilds

None

Scrapping

6x SL14-class (4 month total, 2 month in Type 0 dock)
- Steadfast scrapping in Durban starting in January, finished in April – 142ts received from hull for Q4/1931
- Swordsman scrapping in Prince Eduard Islands starting in Frebruary, finished in May – 142ts received from hull for Q4/1931
- Storm scrapping in Libreville starting in January, finished in April – 142ts received from hull for Q4/1931
- Stalwart scrapping in Durban starting in June, finished in September – 142ts received from hull for Q1/1932
- Success scrapping in Prince Eduard Islands starting in June, finished in September – 142ts received from hull for Q1/1932
- Strenuous scrapping in Libreville starting in May, finished in August – 142ts received from hull for Q1/1932


Destroyers

Completed Units

12x Cat-class torpedoboat
12x Hound-class torpedoboat (Type 21)
12x Hound-class torpedoboat (Type 26)

12x Nymph-class destroyer (Type 21)
12x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)

8x DL28-class destroyer leader (Type 28)

On Trials

8x DD30-class destroyer
- Pontoporeia running trials until May 31
- Proto running trials until May 31
- Protomedeia running trials until May 31
- Sao running trials until May 31
- Speio running trials until May 31
- Themisto running trials until July 31
- Pronoe running trials until August 31
- Psamathe running trials until August 31

Ordered Units

6x DD30-class destroyer (11 month á 145ts material necessary per unit)
- Thetis laid down in Durban on a Type 1 slip in January, completed in November 31
- Thoe laid down in Cape Town on a Type 2 slip in March, completed in January 32
- Thaleia laid down in Cape Town on a Type 1 slip in January, completed in November 31
- Arethusa laid down in Port Elizabeth on a Type 1 slip in January, completed in November 31
- Albuneia laid down in Daressalam on a Type 2 slip in March, completed in January 32
- Egeria laid down in Daressalam on a Type 1 slip in January, completed in November 31

Rebuilds

None

Scrapping

None


Class B Cruisers

Completed Units

6x Insect-class torpedoboat
4x Nampula-class light cruiser
6x Port Shepstone-class light cruiser
3x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser
4x Rosario-class light cruiser
4x Aurora-class light cruiser
4x Arion-class light cruiser
2x Douala II-class light cruiser

On Trials

2x DL30-class destroyer leader
- Fenris running trials until June 31
- Kweldulf running trials until June 31

1x CL16-class light cruiser
- Santa Marina running trials until April 31

Ordered Units

2x CL29-class light cruiser (17 month á 458ts material necessary per unit)
- Blantyre II laid down in Port Louis on a Type 2 slip in March, completed in July 31
- Beira II laid down in Buenos Aires on a Type 2 slip in January, completed in May 31

2x DL30-class destroyer leader (12 month á 218ts material necessary per unit)
- Freki laid down in Durban on a Type 2 Slip in July, completed in June 31
- Cerberus laid down in Mar del Plata on a Type 2 Slip in December, completed in November 31

Rebuilds

2x CL16-class light cruiser (12 month á 192ts/month material necessary per unit)
- Santana entering a Type 3 dock in Daressalam in September. Leaving the dock in January 31, the cruiser will stay in the yard until August 31
- Parana entering a Type 2 dock in Daressalam in November. Leaving the dock in March 31, the cruiser will stay in the yard until October 31

Scrapping

2x TB18-class (5 month total, 2 month in Type 1 dock)
- Mosquito scrapping in Durban starting in August, finished in December – 296ts received from hull for Q2/1931
- Dragonfly scrapping in Buenos Aires starting in July, finished in November – 296ts received from hull for Q2/1931


Class A Cruisers

Completed Units

1x Colony-class AC
4x Cape-class (Type 23)
2x Cape-class (Type 26)
1x Dragon-class (Type 29)

On Trials

None

Ordered Units

1x CA29-class heavy cruiser (21 month á 545ts material necessary per unit)
- Fafnir laid down in Curban on a Type 3 slip in August, completed in April 31

Refits

None

Scrapping

None


Capital Units

Completed Units

2x Hertog-class
4x Koning-class
2x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class

On Trials

None

Ordered Units

2x BB29O-class battleship (47 month á 800ts material necessary per unit)
- Imperator laid down in Durban on a Type 4 slip in January, completed in November 34
- Conqueror laid down in Montevideo on a Type 4 slip in January, completed in November 34

2x BC31-class battle cruiser (39 month á 764ts material necessary per unit)
- Triumph laid down in Port Elizabeth on a Type 4 slip in January, completed in March 34
- Victory laid down in Durban on a Type 4 slip in April, completed in June 34

Rebuilds

None

Scrapping

None


Coastal Defence Units

Completed Units

1x Nagelring-class
1x Tyrfing-class

2x LCDS-class
2x LCDS-2-class

On Trials

1x CDS5-class coast defense ship
- Gungnir running trials until April 31

Ordered Units

None


Carriers

Completed Units

1x Hammer-class (Type 25B)
1x Forge-class (Type 26)

Ordered Units

2x CV30-class light fleet carrier (23 month á 587ts material necessary per unit)
- Anvil laid down in Cape Town on a Type 3 slip in January, completed in November 31
- Gripper laid down in Buenos Aires on a Type 3 slip in August, completed in June 32

On Trials

None

Ordered Units

None


Class A Submarines

Completed Units

12x E-class submarine
16x F-class submarine
4x J-class submarine

Ordered Units

1x L-class submarine (10 month á 87ts material necessary per unit)
- L1 laid down in Buenos Aires on a Type 0 slip in January, completed in October 31


Class B Submarines

Completed Units

2x G-class submarine
15x I-class submarine
12x H-class submarine
16x K-class submarine

On Trials

None

Ordered Units

None

Scrapping

8x G-class (4 month total, 1 month in Type 0 dock)
- G5 scrapping in Montevideo starting in September, finished in December – 69ts received from hull for Q2/1931
- G7 scrapping in St. Helena starting in August, finished in November – 69ts received from hull for Q2/1931
- G12 scrapping in Montevideo starting in January, finished in March – 69ts received from hull for Q3/1931
- G16 scrapping in Buenos Aires starting in February, finished in May – 69ts received from hull for Q4/1931
- G8 scrapping in Mar del Plata starting in January, finished in April – 69ts received from hull for Q4/1931
- G14 scrapping in Montevideo starting in April, finished in July – 69ts received from hull for Q1/1932
- G18 scrapping in Buenos Aires starting in June, finished in September – 69ts received from hull for Q1/1932
- G10 scrapping in Mar del Plata starting in May, finished in August – 69ts received from hull for Q1/1932


Non-combatants

Completed Units

0x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 19)
4x Bay-class tender (Type 23)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)

4x Mimir-class floatplane carriers
2x Bölthorn-class floatplane carrier
1x Thjazi-class floatplane carrier

On Trials

1x TD Bonny Bay-class tender
- Bonny Bay running trials until April 31

Ordered Units

1x Thjazi-class floatplane carrier (15 month á 354ts material necessary per unit)
- Ymir laid down in Montevideo on a Type 2 slip in July, completed in September 31

1x TD29-class tender (14 month á 304ts material necessary per unit)
- TD29-2 laid down in Durban on a Type 1 slip in January, completed in February 32

Refit

None

---------------------------------------------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only):

60 ASW launches
48 motor launches
39 minesweepers
51 small patrol crafts
84 TB/DD/DLs of less than 2,000ts (does not include 11 TBs with 15cm guns)
41 cruisers category b (include 11 TBs with 15cm guns)
7 cruisers category a
14 capital units
6 costal defence ships
2 fleet carrier
45 submarines category b
32 submarines category a
7 floatplane carriers
19 armed tenders

plus numerous auxiliary vessels of all kind.


2

Thursday, July 13th 2006, 11:01pm

Peru

What units are being build by the SAE for Peru? I forget at this time.

3

Thursday, July 13th 2006, 11:29pm

Peru has ordered no new-build ships from the SAE, the ships that Peru bought from the SAE were all older units (2 Nampula-class CLs and 2 Tick-class DDs).

4

Friday, July 14th 2006, 12:04am

So just a payment plan, got it.