Edit: Names corrected
[SIZE=4]SAE Quarterly Reports[/SIZE]
No. 41 – January to March 1931
[SIZE=3]Transfers:[/SIZE]
2,000ts received from Peru.
[SIZE=3]
Factories: [/SIZE]
26 factories total can be used.
Fixed factories
4 factory will be fixed to produce infrastructure points for 1931.
Flexible factories
832ts material transferred from Q4 (incl. material recovered from scrapyard).
21,415ts material necessary to be produced in this quarter (22 factories).
0 factories will produce infrastructure points this quarter.
Infrastructure points used this quarter:
0,1put into a new Type 1 Dock in Port Louis for a total of 2,0pts at the end of Q1.
0,3put into an extention of a Type 3 Slip in Montevideo for a total of 3,3pts at the end of Q1.
[SIZE=3]
Ships:[/SIZE]
Minor vessels
Completed Units
48x UJ26-class ASW launch
4x UJ30-class ASW launch
40x R28-class motor launch
15x Tree-class minesweeper (Type 16)
16x Bush-class minesweeper (Type 21)
8x Cactus-class minesweeper (Type 2
4x Polar-class sloops
13x S-class sloops
1x Circe-class sloops
16x River-class frigate
8x Pleiades-class light destroyers
6x Planet-class light destroyers
6x Guard-class patrol crafts
On Trials
5x MS28-class minesweeper
-
Gibbaeum running trials until June 31
-
Frithia running trials until May 31
-
Fenestraria running trials until May 31
-
Dracophilus running trials until May 31
-
Drosanthemum running trials until April 31
-
Delosperma running trials until April 31
2x LD29-class light destroyer
-
Pluto running trials until April 31
-
Neptune running trials until April 31
1x SL29-class sloop
-
Medusa running trials until June 31
8x R28-class motor launch
-
R41-R48 running trials until March 31
8x UJ30-class ASW launch
-
UJ53-UJ56 running trials until January 31
-
UJ57-UJ60 running trials until February 31
Ordered Units
2x MS28-class minesweeper (Type 28 - 10 month á 56ts material necessary per unit)
-
Faucaria laid down in St. Helena on a Type 1 slip in November, completed August 31
-
Eberlanzia laid down in St. Helena on a Type 0 slip in November, completed August 31
1x SL29-class sloop (11 month á 100ts material necessary per unit)
-
Euryale laid down in Montevideo on a Type 1 slip in January, completed October 31
4x R31-class motor launch (1 month á 95ts material necessary per unit)
-
R49-R52 build in Lüderitz in February
4x UJ30-class ASW launch (1 month á 196ts material necessary per unit)
-
UJ61-UJ64 build in Lüderitz in March
Rebuilds
None
Scrapping
4x SL14-class (4 month total, 2 month in Type 0 dock)
-
Swift scrapping in Durban starting in June, finished in September – 142ts received from hull for Q1/1931
-
Steadfast scrapping in Durban starting in January, finished in April – 142ts received from hull for Q4/1931
-
Swordsman scrapping in Prince Eduard Islands starting in Frebruary, finished in May – 142ts received from hull for Q4/1931
-
Storm scrapping in Libreville starting in January, finished in April – 142ts received from hull for Q4/1931
Destroyers
Completed Units
12x Cat-class torpedoboat
12x Hound-class torpedoboat (Type 21)
12x Hound-class torpedoboat (Type 26)
12x Nymph-class destroyer (Type 21)
12x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
8x DL28-class destroyer leader (Type 2
On Trials
5x DD30-class destroyer
-
Pontoporeia running trials until May 31
-
Proto running trials until May 31
-
Protomedeia running trials until May 31
-
Sao running trials until May 31
-
Speio running trials until May 31
Ordered Units
9x DD30-class destroyer (11 month á 145ts material necessary per unit)
-
Themisto laid down in Majunga on a Type 1 slip in March, completed in January 31
-
Pronoe laid down in Cape Town on a Type 2 slip in April, completed in February 31
-
Psamathe laid down in Daressalam on a Type 2 slip in April, completed in February 31
-
Thetis laid down in Durban on a Type 1 slip in January, completed in November 31
-
Thoe laid down in Cape Town on a Type 2 slip in March, completed in January 32
-
Thaleia laid down in Cape Town on a Type 1 slip in January, completed in November 31
-
Arethusa laid down in Port Elizabeth on a Type 1 slip in January, completed in November 31
-
Albuneia laid down in Daressalam on a Type 2 slip in March, completed in January 32
-
Egeria laid down in Daressalam on a Type 1 slip in January, completed in November 31
Rebuilds
None
Scrapping
None
Class B Cruisers
Completed Units
6x Insect-class torpedoboat
4x Nampula-class light cruiser
6x Port Shepstone-class light cruiser
1x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser
4x Rosario-class light cruiser
4x Aurora-class light cruiser
4x Arion-class light cruiser
1x Douala II-class light cruiser
On Trials
2x CL16-class light cruiser
-
Pelotas running trials until February 31
-
Rio Grande running trials until February 31
1x CL29-class light cruiser
-
Pietermaritzburg II running trials until January 31
2x DL30-class destroyer leader
-
Fenris running trials until June 31
-
Kweldulf running trials until June 31
1x CL16-class light cruiser
-
Santa Marina running trials until April 31
Ordered Units
2x CL29-class light cruiser (17 month á 458ts material necessary per unit)
-
Blantyre II laid down in Port Louis on a Type 2 slip in March, completed in July 31
-
Beira II laid down in Buenos Aires on a Type 2 slip in January, completed in May 31
2x DL30-class destroyer leader (12 month á 218ts material necessary per unit)
-
Freki laid down in Durban on a Type 2 Slip in July, completed in June 31
-
Cerberus laid down in Mar del Plata on a Type 2 Slip in December, completed in November 31
Rebuilds
2x CL16-class light cruiser (12 month á 192ts/month material necessary per unit)
-
Santana entering a Type 3 dock in Daressalam in September. Leaving the dock in January 31, the cruiser will stay in the yard until August 31
-
Parana entering a Type 2 dock in Daressalam in November. Leaving the dock in March 31, the cruiser will stay in the yard until October 31
Scrapping
3x TB18-class (5 month total, 2 month in Type 1 dock)
-
Flea scrapping in Port Elizabeth starting in May, finished in September – 296ts received from hull for Q1/1931
-
Mosquito scrapping in Durban starting in August, finished in December – 296ts received from hull for Q2/1931
-
Dragonfly scrapping in Buenos Aires starting in July, finished in November – 296ts received from hull for Q2/1931
Class A Cruisers
Completed Units
1x Colony-class AC
4x Cape-class (Type 23)
2x Cape-class (Type 26)
On Trials
1x Dragon-class heavy cruiser
-
Ladon running trials until March 31
Ordered Units
1x CA29-class heavy cruiser (21 month á 545ts material necessary per unit)
-
Fafnir laid down in Curban on a Type 3 slip in August, completed in April 31
Refits
None
Scrapping
None
Capital Units
Completed Units
2x Hertog-class
4x Koning-class
2x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class
On Trials
None
Ordered Units
2x BB29O-class battleship (47 month á 800ts material necessary per unit)
-
Imperator laid down in Durban on a Type 4 slip in January, completed in November 34
-
Conqueror laid down in Montevideo on a Type 4 slip in January, completed in November 34
1x BC31-class battle cruiser (39 month á 764ts material necessary per unit)
-
Triumph laid down in Port Elizabeth on a Type 4 slip in January, completed in March 34
Rebuilds
None
Scrapping
None
Coastal Defence Units
Completed Units
1x Nagelring-class
1x Tyrfing-class
2x LCDS-class
1x LCDS-2-class
On Trials
1x LCDS-2-class coast defense ship
-
Nagelfar running trials until January 31
1x CDS5-class coast defense ship
-
Gungnir running trials until April 31
Ordered Units
None
Carriers
Completed Units
1x Hammer-class (Type 25B)
1x Forge-class (Type 26)
Ordered Units
2x CV30-class light fleet carrier (23 month á 587ts material necessary per unit)
-
Anvil laid down in Cape Town on a Type 3 slip in January, completed in November 31
-
Gripper laid down in Buenos Aires on a Type 3 slip in August, completed in June 32
On Trials
None
Ordered Units
None
Class A Submarines
Completed Units
12x E-class submarine
16x F-class submarine
4x J-class submarine
Ordered Units
1x L-class submarine (10 month á 87ts material necessary per unit)
-
L1 laid down in Buenos Aires on a Type 0 slip in January, completed in October 31
Class B Submarines
Completed Units
5x G-class submarine
15x I-class submarine
12x H-class submarine
16x K-class submarine
On Trials
None
Ordered Units
None
Scrapping
7x G-class (4 month total, 1 month in Type 0 dock)
-
G4 scrapping in Montevideo starting in May, finished in August – 69ts received from hull for Q1/1931
-
G2 scrapping in Mar del Plata starting in February, finished in June – 69ts received from hull for Q1/1931
-
G5 scrapping in Montevideo starting in September, finished in December – 69ts received from hull for Q2/1931
-
G7 scrapping in St. Helena starting in August, finished in November – 69ts received from hull for Q2/1931
-
G12 scrapping in Montevideo starting in January, finished in May – 69ts received from hull for Q4/1931
-
G16 scrapping in Buenos Aires starting in February, finished in June – 69ts received from hull for Q1/1932
-
G8 scrapping in Mar del Plata starting in January, finished in May – 69ts received from hull for Q4/1931
Non-combatants
Completed Units
0x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 0
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 19)
4x Bay-class tender (Type 23)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
4x Mimir-class floatplane carriers
2x Bölthorn-class floatplane carrier
On Trials
1x Thjazi-class floatplane carrier
-
Thjazi running trials until March 31
1x TD Bonny Bay-class tender
-
Bonny Bay running trials until April 31
Ordered Units
1x Thjazi-class floatplane carrier (15 month á 354ts material necessary per unit)
-
Ymir laid down in Montevideo on a Type 2 slip in July, completed in September 31
1x TD29-class tender (14 month á 304ts material necessary per unit)
-
Stilbaai laid down in Durban on a Type 1 slip in January, completed in February 32
Refit
None
---------------------------------------------------------------------------------------------------------------------
At the end of this quarter the RSAN consists of (units in service only):
52 ASW launches
40 motor launches
39 minesweepers
54 small patrol crafts
84 TB/DD/DLs of less than 2,000ts (does not include 11 TBs with 15cm guns)
38 cruisers category b (include 11 TBs with 15cm guns)
7 cruisers category a
14 capital units
5 costal defence ships
2 fleet carrier
48 submarines category b
32 submarines category a
6 floatplane carriers
19 armed tenders
plus numerous auxiliary vessels of all kind.