Australia Naval Developments - Q4/1930
A. Industrial Allocation
5 of 10 factories producing warship material for 5,000 tons, plus a stockpile of 0 t and 0 t of
scrap for 0 t. 5,000 t are used, leaving a stockpile of 0 t.
5 of 10 factories are dedicated to infrastructure material production, and produce 0.5 pts plus 0.5 bonus points.
B. Infrastructure Development
Type 1 Slip (Sydney) receives 0.7 pts, for 1 pts total. completed
Type 1 Drydock (Darwin) receives 0.2 pts, for 0.2 pts total. 1.8 pts remaining
C. Naval Construction
Cockatoo Island (Sydney)
S3:
S2:
S1:
S1: (Under construction)
Sydney
D3: HMAS Tiger reconstruction receives 2,750t, 5,250 remaining
D2: HMAS Perth rebuilding receives 400t, completed
D1: HMAS Shakespeare rebuilding receives 385t, completed
Auckland
D2: HMAS Spencer rebuilding receives 385t completed
Perth
D1:
Port Moresby
D1:
HMAS Cairns conversion to "training ship"* (25%) receives 900t
3 MTBF 180 tons completed
D. Transactions
N/A
E. Other Notes
New units laid down this quarter:
3 MTBF
F. Updated Order of Battle, 1/1/30
Note:
Y)+Z = completed (under repair/refit) + under construction
Capital Ships: 3(1)+0
Aircraft Carriers:1(0)+0
Heavy Cruisers: 1(0)+0
Light Cruisers: 7(2)+0
Destroyer Leaders:3(2)+0
Destroyers: 22(0)+0
Frigates: 10(0)+0
Submarines: 20(0)+0
Multi-Purpose: 4(0)+0
Minewarefare: 4(0)+0
Patrol Boats: 5(0)+0
Motor Boats: 20(0)+3
*She will still carry torpedo tubes, otherwise she can be considered a training ship