German Naval Developments – Q4/30
A. Industrial Allocation
Factory Allocation:
Warship Material: 4
Infrastructure (Committed): 21 (Bonus production this quarter = 2.1 pts)
Infrastructure (Non-committed): 0
Warship Material Produced: 5000 t
Stockpile: 2889 t
Recycled Scrap: 0 t
Export Orders: 1932 t
Material Used on Construction: 4252 t
New Stockpile: 4134t
B. Infrastructure Development
Factory 27 receives 2 points, for 10 total, completed.
Factory 28 receives 2 points, for 10 total, completed.
Type 3 slipway at Cuxhaven upgrade to Type 4 receives 0.2 pts, for 1 total, completed.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip:
1 Type 0 drydock: Idle
Free-floating: Submarine
U-1 receives 9t, completed, begins trials.
Submarine
U-2 receives 135t
At Bremerhaven
1 Type 3 slip: CA
Ersatz B receives 1773t
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
Free-floating: DD
Z-214 receives 241t, completed, begins trials
At Cuxhaven
1 Type 3 slip: Upgrading
1 Type 3 drydock: Idle
1 Type 2 slip: CL
Ankara laid down, receives 1302t
1 Type 1 slip:
1 Type 0 slip: Idle
Free-floating: DD
Z-215 receives 451t
At Kiel
1 Type 4 slipway: Idle
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: CA
Admiral Hipper receives 1773t
D. Transactions
CL
Ankara laid down at Cuxhaven for Turkey.
E. Other Notes
SS
U-1 completed, begins her trials
DD
Z-214 completed, begins her trials
F. Updated Order of Battle, 30/6/30
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
CA: 0(0)+2
CL: 12(0), +1 export
DD: 19(0)+1,
SS: 1(0)+1
SL: 6(0)+0
AM: 10(0)+0
TB: 4(0)+0
Target: 1(0)+0