You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, March 26th 2006, 1:26am

Siam, Quarter 3, 1930

Siamese Naval Developments Q3 1930

a/ Industrial Allocation
1/1 factories producing materiel for shipbuilding = 1000 tons
0/1 factories (fixed) producing infrastructure materiel = 0.0 points

b/ Infrastructure Development
No.1 type 0 drydock, Phuket, receives 0.0 point balance 0.9 points

c/ Naval Construction
Bangkok-
No.1 type 1 drydock –
Patrol boat, “Witchaya Riddhidej”, laid down 02/07/1930, receives 196 tons, balance 144 tons
No.2 type 1 drydock -
Patrol boat, “Porntep Bunraksa”, laid down 02/07/1930, receives 196 tons, balance 144 tons

d/ Transactions
None

e/ Other Notes
RTNS Bumroong Boonyuen commissions on 05/09/1930
RTNS Pacheun Trongsawasdi commences sea trials on 05/09/1930

Tonnage Carried Over From This Quarter = 928

f/ Order of Battle
Note: X(Y)+Z = completed (under repair/refit) + building/on order

CDS = 02 (0) + 0/0
DD = 01 (0) + 0/0
GB = 03 (0) + 0/0
PB = 01 (0) + 3/0
MTB = 04 (0) + 0/0
Royal = 01 (0) + 0/0