You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, March 21st 2006, 8:29pm

Ibedria, Quarter 2, 1930

Iberian Naval Developments Q2 1930

a/ Industrial Allocation
13/23 factories producing materiel for shipbuilding =13000 tons
10/23 factories (fixed) producing infrastructure materiel =1.0 points
0/23 factories producing infrastructure materiel = 0.0 points

b/ Infrastructure Development
Factory no. 24 continues construction, receiving 0.5 points = Total 4.1 points
No.2 Type 0 slip, La Coruna, extends to type 1 receives 0.1 pts = Total 0.2pts
No.3 Type 0 drydock, Barreiro, extending to type 1 receives 0.2 pts = Total 0.4pts
No.4 Type 0 drydock, Barreiro, extending to type 1 receives 0.2 pts = Total 0.4pts

c/ Naval Construction
Cadiz-
No.1 type 5 slip – Idle
No.2 type 4 slip – Idle
No.3 type 3 slip – Sb9, Sb10, Sub, laid down 02/01/30, each receive 257 tons, balance 326 tons each
No.4 type 2 slip – Sb11, Sb12, Sub, laid down 02/01/30, each receive 257 tons, balance 326 tons each
No.5 type 2 slip – Idle
No.6 type 2 slip – Idle

No.1 type 4 drydock – Toledo, CV, laid down 01/10/1928, receives 1827 tons, balance 5,475 tons
No.2 type 3 drydock – Idle


Dock side – Idle
Dock side – Idle

Barreiro-
No.1 type 4 slip – Idle
No.2 type 3 slip – Sb13, Sb14, Sub, laid down 02/01/30, each receive 257 tons, balance 326 tons each
No.3 type 3 slip – Sb15, Sb16, Sub, laid down 02/01/30, each receive 257 tons, balance 326 tons each
No.4 type 1 slip – Idle
No.5 type 1 slip – Idle
No.6 type 1 slip – idle

No.1 type 5 drydock – Idle
No.2 type 3 drydock – Idle
No.3 type 0 drydock – EXTENDING
No.4 type 0 drydock – EXTENDING

Dock side – Cordoba, CV, laid down 01/10/1928, receives 1827 tons, balance 5,475 tons

Porto-
No.1 type 4 slip – Idle
No.2 type 3 slip – C79, C80, GB, laid down 02/01/30, each receive 511 tons, balance 822 tons each
No.3 type 3 slip – Idle

Dock side – Idle

La Coruna-

No.1 type 2 slip – Paracels, CL, laid down 01/10/1929, receives 1235 tons, balance 2,587 tons
No.2 type 0 slip – EXTENDING

No.1 type 2 drydock –Idle
No.2 type 1 drydock –Idle
No.3 type 0 drydock –Idle
No.4 type 0 drydock –Idle

Dock side – Idle

Santander-

No.1 type 3 slip – Islas Baleares, CL, laid down 01/10/1929, receives 1235 tons, balance 2,587 tons
No.2 type 2 slip – Idle
No.3 type 1 slip – Ide
No.4 type 1 slip – Idle
No.5 type 1 slip – Idle
No.6 type 1 slip – Idle

No.1 type 2 drydock – Idle

Dock side – Idle
Dock side – Idle



Santiago De Cuba-

No.1 type 2 slip – C81, GB, laid down 02/01/30, receive 511 tons, balance 822 tons
No.2 type 1 slip – C82, GB, laid down 02/01/30, receive 511 tons, balance 822 tons
No.3 type 1 slip – Idle

No.1 type 4 drydock - Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle

Dock side – Idle

San Lorenzo-

No.1 type 3 drydock – Idle
No.2 type 0 drydock – Idle

Dock side – Idle

Panama-

No.1 type 2 slip – C83, GB, laid down 02/01/30, receive 511 tons, balance 822 tons
No.2 type 1 slip – C84, GB, laid down 02/01/30, receive 511 tons, balance 822 tons
No.3 type 1 slip – Idle
No.4 type 1 slip – Idle
No.5 type 1 slip – Idle

No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle
No.4 type 0 drydock – Idle

Dock side – Idle

Luanda-

No.1 type 1 slip – C85, GB, laid down 02/01/30, receive 511 tons, balance 822 tons
No.2 type 1 slip – C86, GB, laid down 02/01/30, receive 511 tons, balance 822 tons
No.3 type 1 slip – Idle
No.4 type 1 slip – Idle

No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle
No.4 type 1 drydock – Idle

Dock side – C77, GB, laid down 02/07/29, receive 311 tons to complete
Dock side – C78, GB, laid down 02/07/29, receive 311 tons to complete


San Hainando-

No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle

d/ Transactions
None

e/ Other Notes

Breaking of the following ships:-
None

Re-Fitting (25%) of the following ships:-
None

Re-Building (50%) of the following ships:-
None

Sea trials of the following vessels:-
C77 – C78 commences se trials on 23/05/1930

Commissioning of the following vessels:-
BDT133 – BDT144 commission on 30/04/1930
Sb1 – Sb8 commissions on 24/10/1929
C61 – C76 commissions on 22/05/1930


Tonnage from scrapping = 0 tons

Tonnage Carried Over From This Quarter = 721 tons

f/ Order of Battle
Note: W(X)+Y(Z) = In Service (under repair/refit) + building/on order (breaking)

BB = 08 (0) + 0/0 (0)
BC = 04 (0) + 0/0 (0)
CDS(CE) = 05 (0) + 0/0 (0)
CA = 10 (0) + 0/0 (0)
CL = 49 (0) + 4/0 (0)
CV = 02 (0) + 2/0 (0)
DD = 99 (0) + 0/0 (0)
FR = 16 (0) + 0/0 (0)
GB = 76 (0) + 10/0 (0)
SUB = 32 (0) + 8/0 (0)
MWS = 32 (0) + 0/0 (0)
BDT = 144 (0) + 12/0 (0)
Note: FR = Frigate
GB = Gun Boat
MWS = Mine Warfare Ship
BDT = Barco Del Torpedo (Torpedo boat)

Edited due to slip errors