You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, March 21st 2006, 8:27pm

Siam, Quarter 2, 1930

Siamese Naval Developments Q2 1930

a/ Industrial Allocation
0/1 factories producing materiel for shipbuilding = 0 tons
1/1 factories (fixed) producing infrastructure materiel = 0.1 points

b/ Infrastructure Development
No.1 type 0 drydock, Phuket, receives 0.1 point balance 0.9 points

c/ Naval Construction
Bangkok-
No.1 type 1 drydock –
Patrol boat, “Bumroong Boonyuen”, laid down 02/01/1930, receives 144 tons to complete
No.2 type 1 drydock -
Patrol boat, “Pacheun Trongsawasdi”, laid down 02/01/1930, receives 144 tons to complete

d/ Transactions
None

e/ Other Notes
RTNS Bumroong Boonyuen commences sea trials on 07/06/1930

Tonnage Carried Over From This Quarter = 320

f/ Order of Battle
Note: X(Y)+Z = completed (under repair/refit) + building/on order

CDS = 02 (0) + 0/0
DD = 01 (0) + 0/0
GB = 03 (0) + 0/0
PB = 00 (0) + 2/0
MTB = 04 (0) + 0/0
Royal = 01 (0) + 0/0