Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, August 8th 2005, 12:55am

Atlantis Q1/28

*to be revised if nessassary*

A. Industrial Allocation

17/30 factories (non fixed) to naval materials: 17,000 tons created for Q1/1928 plus 450 tons stockpiled from Q4/27 plus 1,830+1,572 tons (3,402) tons transfered from Chile in Q4/1928 for 20,852 total tons.

18,957 tons used for ship building(16,530 for local builds, 2,427 for foriegn builds), 1,895 tons stockpiled for next quarter.

3/30 factories (non fixed) to infrastructure development: 0.3 points for Q1/1928
10/30 factories (fixed) to infrastructure development: 1.0 points for Q1/1928
Plus 1.5 bonus points created in 1927



Total: 1.3 infrastructure points created (plus 1.5 bonus points for total of 2.8 points for Q1/28)

B. Infrastructure Development

1.5 points added to new factory #3, 10 points needed
0.5 points added to type 2 drydock at Safi to convert to type 3
0.8 points added to 4 new type 0 slips at Safi


C. Naval Construction

At Cleito Type 4 port (7/9)

Class 4 Slip #1 -CV Alioth launched, 13,051 tons needed, 9000 tons used, 1000 tons added
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 1 Slip #1 - H class destroyer leader Hatchet laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #2 - H class destroyer leader Hero laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #3 - H class destroyer leader Harangue laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #4 - H class destroyer leader Hazard laid down, 1,768 tons needed, 450 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

5x 22 ton Landing Craft Infantry


At Eridanus Type 4 port (8/9)

Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 2 Slip #1 - Chilean Light Cruiser #3 laid down, 1,830 tons used, 1,830 tons added
Class 2 Drydock #1 - Tanker Lamia converting to airship tender, 1078 tons added
Class 1 Slip #1 - H class destroyer leader Hasty laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #2 - H class destroyer leader Hammer laid down, 1,768 tons needed, 450 tons added

5x 22 ton Landing Craft Infantry

At Duecalion type 3 port (6/7)

Class 3 Slip #1 - CL Cerasus laid down, 7,745 tons needed, 1000 tons added
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - completed
Class 2 Drydock #1 - Tanker Tronagarru converting to airship tender, 1078 tons added

AC Cape Verde moved from drydock freefloating


At Illissus type 3 port (7/7)

Class 3 Slip #1 - CL Ithica laid down, 7,745 tons needed, 1000 tons added
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - Chilean CL Atacama launched, 9,747 tons needed, 9150 tons used, 597 tons added
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - H class destroyer leader Harpoon laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #2 - H class destroyer leader Hawk laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

5x 22 ton Landing Craft Infantry


At Phelleus type 5 port (9/11)

Class 3 Slip #1 - CL Orestes laid down, 7,745 tons needed, 1000 tons added
Class 3 Slip #2 - CL Atreus laid down, 7,745 tons needed, 1000 tons added
Class 3 Drydock #1 - Idle
Class 3 Drydock #2 - Idle
Class 5 Drydock #1 - Idle
Class 1 Slip #1 - H class destroyer leader Hind laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #2 - H class destroyer leader Havock laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

5x 22 ton Landing Craft Infantry

AC Venezuela moved from drydock freefloating

At Lycabettus type 4 port (8/9)

Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 2 Drydock #2 - Idle
Class 1 Slip #1 - H class destroyer leader Hostile laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #2 - H class destroyer leader Hardy laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 1 Drydock #1 - DD uprising converting to blimp tender, 514 tons needed, 257 tons added


At Maracaibo type 3 port (5/7)

Class 3 Drydock #1 - Idle
Class 1 Slip #1 - H class destroyer leader Hornet laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #2 - H class destroyer leader Hunter laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - completed
Class 0 Slip #4 - completed


At Safi type 2 port (4/5)

Class 2 Drydock #1 - upgrading to type 3 drydock, 1.0 points needed, 0.5 points added
Class 1 Slip #1 - H class destroyer leader Harbinger laid down, 1,768 tons needed, 450 tons added
Class 1 Slip #2 - H class destroyer leader Harrier laid down, 1,768 tons needed, 450 tons added
Class 1 Drydock #1 - DD upsurge converting to blimp tender, 514 tons needed, 257 tons added
Class 0 Slip #1 - begins contruction, 0.5 points needed, 0.2 points added
Class 0 Slip #2 - begins contruction, 0.5 points needed, 0.2 points added
Class 0 Slip #3 - begins contruction, 0.5 points needed, 0.2 points added
Class 0 Slip #4 - begins contruction, 0.5 points needed, 0.2 points added



Launched ships/freefloating ships being completed:

CV Alioth building, 13,051 tons needed, 9000 tons used, 1000 tons added
Chilean CL Atacama launched, 9,747 tons needed, 9150 tons used, 597 tons added
CL Ares completed, begins trials
CL Oceanus completed, begins trials
CL Persephone completed, begins trials
CL Artemis completed, begins trials

Transports Scythia, Nineveh, Gadir and Tanais refitting, 1305 tons needed for each, 305 tons added to Scythia, Nineveh, Gadir and Tanais (1,220 total this quarter), complete at end of quarter


AC Venezuela converting to training ship, 4,800 tons needed, 3,903 tons used, construction halted , moored at Phelleus
AC Cape Verde converting to training ship, 4,800 tons needed, 3,903 tons used, construction halted , moored at Duecalion


Ships completed and on trials

CA Astyanax, on trials
CA Sarpedon, on trials
CL Ares, begin trials
CL Oceanus, begin trials
CL Persephone, begin trials
CL Artemis, begin trials
CL's Medusa, Minotaur on trials
MPSS Efficax on trials


Summary of ship building/repairs/rebuilds and convertions.

AC's Cape Verde and Venezuela converting to training ships, work suspended.
CV Alioth building
4x Cerasus class CL's laid down
CL-6 Atacama building for Chile
CL #3 (CL-7) laid down for Chile
16xH class destroyer leaders laid down
2 Sea Lark class Tankers converting to Airship Tenders
2 admiralty class DD's converting to blimp tenders


D. Transactions

Deal with Chile for a trio of "light cruisers" with the potential for a pair of "heavy cruisers" based on the same hull. One payment of 1,830 tons and one payment of 957 tons of material transfered to Atlantis for the building of "light cruisers" CL-6 Atacama and CL-7. Second ship of this class building in Chile.

E. Other Notes

BB Aggamemnon and AC's *Cape Verde and *Venezuela converting to gunnery training ships.
*conversions susspended


F. Updated Order of Battle, 1/1/28

Note: X(Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

BB: 9(0)0 * BB Aggamemnon converted to gunnery training ship *
BC: 2(0)0
CV: 3(0)1
CA: 12(2)0 * CA's Medusa, Minotaur converting (rebuilding) into CL *
CAE:0(0)0
CL: 49(2)4 * CA's Medusa, Minotaur converting (rebuilding) into CL *
DD: 122(8)0
Training ships: 1(0)0 * BB Aggamemnon converted to gunnery training ship *
Torpedo boats: N/A
Sloops: N/A
Frigates: N/A
Moniters:2(0)0
Torpedo gunboats: 32(0)0
Gunboats: 12(0)0
Patrol vessels: 50(0)0
Mine sweepers: 24 (0) 0
Sub chasers: 312(0)0
Motor torpedo boats: 0(0)0
Fleet Submarine: 20(0)0
Coastal Submarine: 72(0)0
Floatplane carrier/tenders: 2(0)0
Destroyer depot ships: 2(0)0
Submarine depot ships: 4(0)0
Repair ships 2(0)0
Transports: 6(4)0
Landing Craft Infantry 40(0)20
Infantry launches 38(0)0
Auxillary's N/A

2

Monday, August 8th 2005, 2:01am

Note:

Chile has transfered 3,660 tons of materials to Atlantis in Quarter 1 of 1928. 1,830 for CL#1 and 1,830 for CL#3.

Atlantis design CL#3 = CL-8 and should have been laid down Q4/1927.
Chile is building CL-7 (CL#2) in Chile, though work is going slowly so they can finish the Capitan Tylor sooner.

3

Monday, August 8th 2005, 3:25am

Corrected, I forgot about the mark up and I was using the ships light displacement as the cost.

4

Monday, August 8th 2005, 3:52am

Look very carefully.

Man, make someone a world power and they stack the book to keep the third world nations in debt....

5

Monday, August 8th 2005, 4:26am

Lol, I think we were on a different page, you and I. Acctually I think you would have got the ship at cost!

6

Monday, August 8th 2005, 5:07am

Probably, but Chile doesn't want to cheat another nation out of its funds....it would be bad for business. Perhaps any cost overruns can be used to cut the price on the heavy cruiser when it starts?

7

Monday, August 8th 2005, 7:01am

Reworked the cost again to reflect the 10% markup and the materials acctually used. It should be correct now.