Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, June 24th 2005, 1:40am

Netherlands, Q4/1927

Netherlands Q4/27



9/14 factories producing naval materials: 9,000 tons created for Q4/1927 . 9000 total tons+48 stockpiled from previous quarter+414 tons from scrapping= 9462 tons

9400 tons used. 62 tons left for Q1/28

414 tons from scraping, available Q1/28

3/14 factories to infrastructure development: 0.3 points for Q4/27

2/14 factories to infrastructure development (commited): 0,2 points for Q4/27 + 0,2 for commited works= 0,4



B. Infrastructure Development

1 new factory (#15).

0.7 points added to factory #15 in Q4/1927. Current status:9.4 points.



C. Naval Construction

Den Helder:

Class 4 Slip:- Empty

Class 3 dry-dock : - Empty
Amsterdam:

Class 3 Slip :- Empty

Class 2 Slip :- Empty

Class 1 Slip :- Empty

The Hague

Class 3 Slip :- Empty

Class 2 Slip :- Empty

Class 1 Slip :- Empty

Class 3 Dry-dock:- Empty

Class 1 Dry-dock:- Empty


Hoorn:

Class 4 Slip :- Empty

Class 2 Dry-dock:- Empty



Vlissingen:

Class 3 Slip :- Empty

Class 2 Slip :- Empty

Class 1 Slip :- Empty.


IJmuiden:

Class 2 Slip :- Empty

Class 2 Dry-dock:- Empty


Oost-Vlieland:

Class 3 Slip :- Empty

Class 2 Slip :- Empty


Langedijk:

Class 2 Slip :- Empty

Class 2 Dry-dock:- Empty



AT THE EAST INDIES:


Surabaia:
Class 3 Dry-dock:- empty


Balikpapan:
Class 2 Dry-dock:- Empty
Class 1 Dry-dock:- empty


Medan:
Class 2 Dry-dock:- empty
Class 1 Dry-dock:- empty



Launched ships being completed:

Den Helder:
"Utretch" class BB. needs 12000 tons to be completed. 2000 tons added Q4/27. 10000 tons left (Q4/28)

Hoorn:
"Oceaan", Utretch class BB. needs 12000 tons to be completed. 2000 tons added Q4/27. 10000 tons left (Q4/28)

Amsterdam:
"Breda",Breda class CL. 4043 tons needed. 1350 tons added Q4/27. 2693 tons until ship complete. Expected to be completed in Q2/28.

The Hague:
"Arnhem",Breda class CL. 4043 tons needed. 1350 tons added Q4/27. 2693 tons until ship complete. Expected to be completed in Q2/28.

Vlissingen:
"Aachen",Breda class CL. 4043 tons needed. 1350 tons added Q4/27. 2693 tons until ship complete. Expected to be completed in Q2/28.

IJmuiden:
"Maastrich",Breda class CL. 4043 tons needed. 1350 tons added Q4/27. 2693 tons until ship complete. Expected to be completed in Q2/28.



C. Ships on shakedown cruises:

None

D. Transactions

None.




E. Other Notes

None



F. Updated Order of Battle-

Note: X(Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

CV: 1(0)0
BB: 2(0)2
BC: 4(0)0
PD: 2(0)0
CDS:3(0)0
CA: 4(0)0
CL: 20(0)4
DD: 48(0)0
FF: 45(0)0
Fleet Submarine: 16(0)0

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

2

Friday, June 24th 2005, 9:37am

That´s a lot of empty space on your slips... Why is this? No need for more or modern destroyers, escorts, minesweepers, submarines etc.?

3

Friday, June 24th 2005, 3:50pm

Prob'ly has more to do with this:

Quoted

9/14 factories producing naval materials: 9,000 tons created for Q4/1927 . 9000 total tons+48 stockpiled from previous quarter+414 tons from scrapping= 9462 tons

9400 tons used.


Can't build what you can't afford. ;)

4

Friday, June 24th 2005, 4:35pm

Quoted

Originally posted by Swamphen

Quoted

9/14 factories producing naval materials: 9,000 tons created for Q4/1927 . 9000 total tons+48 stockpiled from previous quarter+414 tons from scrapping= 9462 tons

9400 tons used.


Can't build what you can't afford. ;)




Seems someone hit it square on the nails' head ;).


First batch of Z53 destroyers will be started next year after completion of the Breda class CLs. Remember that my first intention was to build 12 DDs per year but someone (I think it was Rocky) pointed out at a potential "block obsolescence" problem so I decided to launch 12 each 2 years and build soomething else in the meantime.

Also a number of submarines will be built. ASW ships too. F.1 frigates are more than ageing and need replacement. This will have to wait until the "Utretchs" are completed, tho.

Also, during 1928 two 18000 ton CVs will be started.



When Factory #15 is completed, infrastructure priority will be downgraded (and I'll have 1000 tons more to play with each quarter) and the dutch navy will have a chance to focus on the CVs and smaller ships until the replacement BBs for the Zeven Provinciën and Ijselijks are started.


But for now between completing the factory ,building the Bredas and finishing the Utretchs, I have my hands full. Not many things I can do for now...