Quoted
Originally posted by Ithekro
Perhaps it has something to do with the weight of a side elevator on an already heavy deck, plus the cut in the side of the support structure for the planes in the hanger (hangers in this case) to access that elevator?
Forum Software: Burning Board® Lite 2.1.2 pl 1, developed by WoltLab® GmbH