You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, June 9th 2005, 12:22am

Republic of France - Q4/27

A. Industrial Allocation

11/25 factories to naval materials: 11,000 tons created for Q4/1927. 267 tons saved from Q4/27, plus 1,200 tons purchased from the Russian Federation, for a total of 12,467 tons available.

14/24 factories (committed) to infrastructure development: 1.4 points created in Q4/27, plus 1.4 bonus points, for a total of 2.8 infrastructure points..

0/24 factories (non-committed) to infrastructure development; total 0.0 infrastructure points produced.

Total infrastructure points available in Q4/27 - 1.4

B. Infrastructure Development
Continue 1 new factory - 3.0 pts completed by Q4/27. 2.0 pts added in Q4/27. 5.0 pts finished by Q4/27

Continue 1 Class 1 drydock at Noumea - 1.2 pts completed by Q4/27. 0.8 pts added in Q4/27. 2.0 pts added by Q4/27 to complete

C. Naval Construction

At La Rochelle
Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 3 Slip #1 - Idle.
Class 3 Slip #2 - Idle
Class 3 Slip #3 - Idle
Class 3 Slip #4 - Idle
Class 2 Slip #1 - Coastal Sub #1 laid down 2 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 2 Slip #2 - Coastal Sub #2 laid down 3 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 1 Slip #1 - Coastal Sub #3 laid down 4 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 1 Slip #2 - Coastal Sub #4 laid down 5 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 1 Slip #3 - Coastal Sub #5 laid down 6 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 1 Slip #4 - Coastal Sub #6 laid down 2 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 0 Slip #1 - Coastal Sub #7 laid down 3 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 0 Slip #2 - Coastal Sub #8 laid down 4 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 0 Slip #3 - Coastal Sub #9 laid down 5 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 0 Slip #4 - Coastal Sub #10 laid down 6 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.

At Brest
Class 3 Drydock #1 - Tanker #1 refit begun 3 January 1927. 2,813 tons completed by Q4/27. 936 tons added in Q4/27 to complete.
Class 2 Drydock #1 - Tanker #2 refit begun 5 January 1927. 2,813 tons completed by Q4/27. 936 tons added in Q4/27 to complete.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

At Cayenne
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Abidjan
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Marseilles
Class 3 Drydock #1 - Idle
Class 3 Slip #1 - Idle
Class 2 Drydock #1 - Aventurieur class destroyer #1 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 1 Drydock #1 - Aventurieur class destroyer #2 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle

At Oran
Class 1 Drydock #1 - Aventurieur class destroyer #3 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 0 Drydock #1 - Idle

At Beiruit
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Aventurieur class destroyer #4 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.

At Crozet Island
Class 2 Drydock #1 - Aventurieur class destroyer #5 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 1 Drydock #1 - Aventurieur class destroyer #6 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.

At Saigon
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Aventurieur class destroyer #7 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 0 Drydock #1 - Aventurieur class destroyer #8 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle

At New Caledonia
Class 2 Drydock #1 - Aventurieur class destroyer #9 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle

Launched ships being completed:

Battleship France - 33,288 tons added by Q4/27. 2,787 tons added in Q4/27 to complete.

Battleship Republique - 33,288 tons added by Q4/27. 2,787 tons added in Q4/27 to complete.

Heavy cruiser Duquesene - 8,695 tons added by Q4/27. 988 tons added in Q4/27 to complete.

Heavy cruiser Gloire - 8,695 tons added by Q4/27. 988 tons added in Q4/27 to complete.

D. Transactions

1,200 tons warship materials purchased from the Russian Federation.

E. Other Notes

12,403 tons expended out of 12,467 tons available.
64 tons saved.

Audaciaux class destroyer Assault entered Class 3 Drydock #1 on 9 May 1927. Requires 297 tons warship materials to repair. 297 tons added by the end of Q4/27 to complete repairs.

F. Ships being scrapped

Aircraft Carrier Normandie commenced scrapping at Marseilles beginning 1 July 1927. Will enter Class 3 Drydock #1 on 1 January 1928. Scrapping will be complete by 1 May 1928. 8x 155mm guns, 6x 75mmguns, 8x 37mm guns, and 2,691 tons of warship materials will be refurbished by the beginning of Q4/28

Battleship Paris commenced scrapping at Saigon on 15 May 1927. Will enter Class 3 Drydock #1 on 15 November 1927. Scrapping will be complete by 15 March 1928. 12x 12" guns, 22x 140mm guns, and 3,112 tons of warship materials will be refurbished by the beginning of Q4/28.

Aircraft Carrier Languedoc 100% scrapped. Guns refurbished: 8x 155mm guns, 6x 75mmguns, 8x 37mm guns

Armored Cruiser Gloire 100% scrapped.

Guns refurbished: 4x 190mm, 8x 164mm, 6x 100mm, being installed at Coast Artillery installations in French Polynesia.

Armored Cruiser Conde 100% scrapped.

Guns refurbished: 4x 190mm, 8x 164mm, 6x 100mm, being installed at Coast Artillery installations in French Polynesia.

G. Updated Order of Battle, 1 January 1928

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 6(0)+0
BC: 0(0)+0
CV:2(0)+0
CA: 6(0)+0
CL: 14(0)+0
Monitors: 5(0)+0
DD: 87(9)+0
Sloops: 0(0)+0
Fleet Submarine: 15(0)+0
Coastal Submarine: 70(0)+0