A. Industrial Allocation
11/25 factories to naval materials: 11,000 tons created for Q4/1927. 267 tons saved from Q4/27, plus 1,200 tons purchased from the Russian Federation, for a total of 12,467 tons available.
14/24 factories (committed) to infrastructure development: 1.4 points created in Q4/27, plus 1.4 bonus points, for a total of 2.8 infrastructure points..
0/24 factories (non-committed) to infrastructure development; total 0.0 infrastructure points produced.
Total infrastructure points available in Q4/27 - 1.4
B. Infrastructure Development
Continue 1 new factory - 3.0 pts completed by Q4/27. 2.0 pts added in Q4/27. 5.0 pts finished by Q4/27
Continue 1 Class 1 drydock at Noumea - 1.2 pts completed by Q4/27. 0.8 pts added in Q4/27. 2.0 pts added by Q4/27 to complete
C. Naval Construction
At La Rochelle
Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 3 Slip #1 - Idle.
Class 3 Slip #2 - Idle
Class 3 Slip #3 - Idle
Class 3 Slip #4 - Idle
Class 2 Slip #1 - Coastal Sub #1 laid down 2 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 2 Slip #2 - Coastal Sub #2 laid down 3 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 1 Slip #1 - Coastal Sub #3 laid down 4 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 1 Slip #2 - Coastal Sub #4 laid down 5 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 1 Slip #3 - Coastal Sub #5 laid down 6 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 1 Slip #4 - Coastal Sub #6 laid down 2 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 0 Slip #1 - Coastal Sub #7 laid down 3 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 0 Slip #2 - Coastal Sub #8 laid down 4 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 0 Slip #3 - Coastal Sub #9 laid down 5 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
Class 0 Slip #4 - Coastal Sub #10 laid down 6 January 1927 - 336 tons completed by Q4/27. 110 tons added in Q4/27 to complete.
At Brest
Class 3 Drydock #1 - Tanker #1 refit begun 3 January 1927. 2,813 tons completed by Q4/27. 936 tons added in Q4/27 to complete.
Class 2 Drydock #1 - Tanker #2 refit begun 5 January 1927. 2,813 tons completed by Q4/27. 936 tons added in Q4/27 to complete.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
At Cayenne
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
At Abidjan
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
At Marseilles
Class 3 Drydock #1 - Idle
Class 3 Slip #1 - Idle
Class 2 Drydock #1 - Aventurieur class destroyer #1 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 1 Drydock #1 - Aventurieur class destroyer #2 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
At Oran
Class 1 Drydock #1 - Aventurieur class destroyer #3 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 0 Drydock #1 - Idle
At Beiruit
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Aventurieur class destroyer #4 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
At Crozet Island
Class 2 Drydock #1 - Aventurieur class destroyer #5 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 1 Drydock #1 - Aventurieur class destroyer #6 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
At Saigon
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Aventurieur class destroyer #7 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 0 Drydock #1 - Aventurieur class destroyer #8 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
At New Caledonia
Class 2 Drydock #1 - Aventurieur class destroyer #9 reconstruction begun 1 January 1927. 530 tons completed by Q4/27. 176 tons added in Q4/27 to complete.
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Launched ships being completed:
Battleship France - 33,288 tons added by Q4/27. 2,787 tons added in Q4/27 to complete.
Battleship Republique - 33,288 tons added by Q4/27. 2,787 tons added in Q4/27 to complete.
Heavy cruiser Duquesene - 8,695 tons added by Q4/27. 988 tons added in Q4/27 to complete.
Heavy cruiser Gloire - 8,695 tons added by Q4/27. 988 tons added in Q4/27 to complete.
D. Transactions
1,200 tons warship materials purchased from the Russian Federation.
E. Other Notes
12,403 tons expended out of 12,467 tons available.
64 tons saved.
Audaciaux class destroyer Assault entered Class 3 Drydock #1 on 9 May 1927. Requires 297 tons warship materials to repair. 297 tons added by the end of Q4/27 to complete repairs.
F. Ships being scrapped
Aircraft Carrier Normandie commenced scrapping at Marseilles beginning 1 July 1927. Will enter Class 3 Drydock #1 on 1 January 1928. Scrapping will be complete by 1 May 1928. 8x 155mm guns, 6x 75mmguns, 8x 37mm guns, and 2,691 tons of warship materials will be refurbished by the beginning of Q4/28
Battleship Paris commenced scrapping at Saigon on 15 May 1927. Will enter Class 3 Drydock #1 on 15 November 1927. Scrapping will be complete by 15 March 1928. 12x 12" guns, 22x 140mm guns, and 3,112 tons of warship materials will be refurbished by the beginning of Q4/28.
Aircraft Carrier Languedoc 100% scrapped. Guns refurbished: 8x 155mm guns, 6x 75mmguns, 8x 37mm guns
Armored Cruiser Gloire 100% scrapped.
Guns refurbished: 4x 190mm, 8x 164mm, 6x 100mm, being installed at Coast Artillery installations in French Polynesia.
Armored Cruiser Conde 100% scrapped.
Guns refurbished: 4x 190mm, 8x 164mm, 6x 100mm, being installed at Coast Artillery installations in French Polynesia.
G. Updated Order of Battle, 1 January 1928
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 6(0)+0
BC: 0(0)+0
CV:2(0)+0
CA: 6(0)+0
CL: 14(0)+0
Monitors: 5(0)+0
DD: 87(9)+0
Sloops: 0(0)+0
Fleet Submarine: 15(0)+0
Coastal Submarine: 70(0)+0