Formosa’s Naval Developments – Q4/1926
A. Industrial Allocation
1/4 factories producing warship material = 1,000 t. 224 tons stockpiled materials available. 1224 t are used, o tons materials stockpiled.
3/4 factories are dedicated to producing infrastructure material, = 0.3 pts.
B. Infrastructure Development
D1 at Agana (Guam), receives 0.3 points. Total 1.0 points.
C. Naval Construction
Kaoshiun
D0: idle
D0: idle
D1: F-D-4 laid down 12/1/1926. Receives 612 tons.
Tahei
D0: idle
D1: F-D-5 laid down 12/1/1926. Receives 612 tons.
D2: idle
Free-floating: F-D-3 receives 0 tons. Completed 12/5/1926
D. Transactions
Horie transferred from Japan.
E. Other Notes
F-D-3 starting shakedown cruise.
F-D-2 continuing shakedown cruise.
F-D-1 completing shakedown cruise.
New units laid down this quarter:
F-D-4 laid down. Requires 1,593 tons and 11 months.
F-D-5 laid down. Requires 1,593 tons and 11 months.
F. Updated Order of Battle, 31/12/26
Note:
Y)+Z = completed (under repair/refit) + under construction
Battle Cruiser: 0(0)+1(*)
Carrier: 0(0)+1(*)
Heavy Cruiser: 0(0)+1(*)
Armored Cruiser: 2(0)+0
1st class Cruiser: 1(0)+0
Light Cruiser: 0(0)+2(*)
2nd class Cruiser: 1(0)+0
Protected Cruiser: 2(1)+0
Gunboats: 2(0)+0
River gunboat: 1(0)+0
Destroyers 2nd class: 5(0)+2
Destroyers 3rd class: 3(0)+0
TPB 1st class: 5(0)+0
TPB 2nd class: 7(0)+0
(*) under construction in Japan