Aircraft carriers Normandie and Languedoc, both laid down 4/18/13. Launched 10/19/14 and 5/10/14. Conversion to aircraft carrier begun on 3/1/19. 14,122 metric tons each completed by 1/1/21. 4,105 metric tons to be added to each in 1921 to complete them.
4 De Grasse Class CL, laid down 3/1/20, launched 9/15/20. 5,256 metric tons each completed by 1/1/21. 2,504 metric tons each remaining. Will be completed in 1921.
Lay down 2 Suffren Class heavy cruisers at the Class 4 slips at La Rochelle on 1/1/21 – 6,096 metric tons each will completed in 1921.
Lay down 12 Audacieux class destroyers at the Class 1, 2, and 3 slips at La Rochelle, and at the Class 1 drydocks at Brest and Marseilles, on 1/1/21. 14,280 metric tons added in 1921 to complete.
2 CV, 4 CL, and 12 DD completed for 44,698 metric tons materials. 6 tons saved.
11 factories produce infrastructure in 1921, starting 2 factories – 5 pts for one, 0.5 pts for the second.
Visit my Russian/French fantasy fleet page:
http://admkuznetsov.tripod.com