Netherlands Q3/25
7/14 factories to naval materials: 12,000 tons created for Q3/1925 . 7000 total tons+581 stockpiled from previous quarter= 7581 tons tons
7504 tons used for ship building, 77 tons stockpiled for next quarter.
5/15 factories to infrastructure development: 0,5 points for Q3/1925
2/14 factories (committed) to infrastructure development: 0,2 points for Q3/1925
B. Infrastructure Development
1 new factory (#15).
0.7 points added to factory #15 in Q3/1925. Current status: 3.9 points.
C. Naval Construction
Den Helder:
Class 4 Slip:- "Utrecht", "Utrecht" class BB. 30000 tons needed for competion. 2000 tons added Q3/25. 28000 tons until ship completed. Completion time Q4/28
Class 3 dry-dock : - Empty
Amsterdam:
Class 3 Slip :- Empty
Class 2 Slip :- "Z45", Z45 class DD. 1951 tons needed for completion. 451 tons added Q3/25. 1500 tons until ship completed. Completion time Q3/26.
Class 1 Slip :- "Z46", Z45 class DD. 1951 tons needed for completion. 451 tons added Q3/25. 1500 tons until ship completed. Completion time Q3/26.Class 2 Dry-dock:- empty
The Hague
Class 3 Slip :- Empty
Class 2 Slip :- "Z47", Z45 class DD. 1951 tons needed for completion. 451 tons added Q3/25. 1500 tons until ship completed. Completion time Q3/26.
Class 1 Slip :- "Z48", Z45 class DD. 1951 tons needed for completion. 451 tons added Q3/25. 1500 tons until ship completed. Completion time Q3/26.
Class 3 Dry-dock:- "Hund" CVX, being converted from a fleet collier. 10000 tons needed for competion. 1700 tons added in Q2/25. 83000 tons until conversion completed. Expected competion date: Q4/26.
Class 1 Dry-dock:- empty
Hoorn:
Class 4 Slip :- 30000 tons needed for competion. 2000 tons added in Q2/25. 28000 tons until ship completed. Completion time Q4/28
Class 2 Dry-dock:- empty
Vlissingen:
Class 3 Slip :- Empty
Class 2 Slip :- "Z49", Z45 class DD. 1951 tons needed for completion. 451 tons added Q3/25. 1500 tons until ship completed. Completion time Q3/26.
Class 1 Slip :- "Z50", Z45 class DD. 1951 tons needed for completion. 451 tons added Q3/25. 1500 tons until ship completed. Completion time Q3/26.
IJmuiden:
Class 2 Slip :- "Z51", Z45 class DD. 1951 tons needed for completion. 451 tons added Q3/25. 1500 tons until ship completed. Completion time Q3/26.
Class 2 Dry-dock:- empty
Oost-Vlieland:
Class 3 Slip :- "Z52", Z45 class DD. 1951 tons needed for completion. 451 tons added Q3/25. 1500 tons until ship completed. Completion time Q3/26.
Class 2 Slip :- Empty
Langedijk:
Class 2 Slip :- empty
Class 2 Dry-dock:- empty
AT THE EAST INDIES:
Surabaia:
Class 3 Dry-dock:- empty
Balikpapan:
Class 2 Dry-dock:- empty
Class 1 Dry-dock:- empty
Medan:
Class 2 Dry-dock:- empty
Class 1 Dry-dock:- empty
Launched ships being completed:
None.
C. Ships on shakedown cruises:
None
D. Transactions
None.
E. Other Notes
Z45, Dutch 1st class Destroyer laid down 1925
Displacement:
1.951 t light; 2.017 t standard; 2.244 t normal; 2.425 t full load
Dimensions: Length overall / water x beam x draught
387,33 ft / 377,30 ft x 32,81 ft x 14,93 ft (normal load)
118,06 m / 115,00 m x 10,00 m x 4,55 m
Armament:
4 - 4,92" / 125 mm guns in single mounts, 59,59lbs / 27,03kg shells, 1925 Model
Breech loading guns in turrets (on barbettes)
on centreline ends, evenly spread, 2 raised mounts - superfiring
4 - 1,57" / 40,0 mm guns in single mounts, 1,95lbs / 0,89kg shells, 1921 Model
Anti-aircraft guns in deck mounts
on side, all amidships, all raised mounts - superfiring
4 - 0,79" / 20,0 mm guns in single mounts, 0,24lbs / 0,11kg shells, 1923 Model
Anti-aircraft guns in deck mounts
on side, evenly spread, all raised mounts
4 - 0,51" / 13,0 mm guns in single mounts, 0,07lbs / 0,03kg shells, 1920 Model
Machine guns in deck mounts
on side, evenly spread, all raised mounts
Weight of broadside 247 lbs / 112 kg
Shells per gun, main battery: 150
6 - 21,0" / 533,4 mm above water torpedoes
Armour:
- Gun armour: Face (max) Other gunhouse (avg) Barbette/hoist (max)
Main: 0,59" / 15 mm 0,39" / 10 mm 0,39" / 10 mm
2nd: 0,39" / 10 mm - -
Machinery:
Oil fired boilers, steam turbines,
Geared drive, 2 shafts, 50.011 shp / 37.308 Kw = 34,00 kts
Range 4.000nm at 15,00 kts (Bunkerage = 409 tons)
Complement:
162 - 211
Cost:
£0,885 million / $3,542 million
Distribution of weights at normal displacement:
Armament: 31 tons, 1,4 %
Armour: 14 tons, 0,6 %
- Belts: 0 tons, 0,0 %
- Torpedo bulkhead: 0 tons, 0,0 %
- Armament: 14 tons, 0,6 %
- Armour Deck: 0 tons, 0,0 %
- Conning Tower: 0 tons, 0,0 %
Machinery: 1.259 tons, 56,1 %
Hull, fittings & equipment: 597 tons, 26,6 %
Fuel, ammunition & stores: 293 tons, 13,1 %
Miscellaneous weights: 50 tons, 2,2 %
Overall survivability and seakeeping ability:
Survivability (Non-critical penetrating hits needed to sink ship):
464 lbs / 210 Kg = 7,8 x 4,9 " / 125 mm shells or 0,3 torpedoes
Stability (Unstable if below 1.00): 1,23
Metacentric height 1,4 ft / 0,4 m
Roll period: 11,8 seconds
Steadiness - As gun platform (Average = 50 %): 72 %
- Recoil effect (Restricted arc if above 1.00): 0,55
Seaboat quality (Average = 1.00): 1,05
Hull form characteristics:
Hull has rise forward of midbreak
Block coefficient: 0,425
Length to Beam Ratio: 11,50 : 1
'Natural speed' for length: 19,42 kts
Power going to wave formation at top speed: 65 %
Trim (Max stability = 0, Max steadiness = 100): 68
Bow angle (Positive = bow angles forward): 10,00 degrees
Stern overhang: 6,56 ft / 2,00 m
Freeboard (% = measuring location as a percentage of overall length):
- Stem: 19,69 ft / 6,00 m
- Forecastle (0 %): 15,58 ft / 4,75 m
- Mid (75 %): 15,58 ft / 4,75 m (12,30 ft / 3,75 m aft of break)
- Quarterdeck (15 %): 12,30 ft / 3,75 m
- Stern: 12,30 ft / 3,75 m
- Average freeboard: 14,76 ft / 4,50 m
Ship tends to be wet forward
Ship space, strength and comments:
Space - Hull below water (magazines/engines, low = better): 194,0 %
- Above water (accommodation/working, high = better): 92,2 %
Waterplane Area: 7.745 Square feet or 720 Square metres
Displacement factor (Displacement / loading): 63 %
Structure weight / hull surface area: 36 lbs/sq ft or 173 Kg/sq metre
Hull strength (Relative):
- Cross-sectional: 0,50
- Longitudinal: 1,76
- Overall: 0,56
Hull space for machinery, storage, compartmentation is cramped
Room for accommodation and workspaces is adequate
Ship has slow, easy roll, a good, steady gun platform
F. Updated Order of Battle-
Note:
Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
CV: 0(1)0
BB: 2(0)2
BC: 4(0)0
PD: 2(0)0
CDS: 3(0)0
CA: 4(0)0
CL: 20(0)0
DD: 46(0)8
FF: 45(0)0
Fleet Submarine: 16(0)0