Marina de Filipinas
1925 Third Quarter Report
1 July-30 September
A. Factories
6/11 factories = 6,000t of material + 0t stockpiled + 234t from scrapping = 6,234t available
5728t are used, and 500t transferred, leaving a stockpile of 6t.
5/11 factories (committed) = 0.5 infrastructure pts +
0/11 factories (flexible) = 0.0 pts = 0.5 pts available
0.4 pts are used, and 0.1 pts transferred
B. Infrastructure Development
Continued construction of Type 2 slip at Butuan
0.4 points alotted = 1.3 total/2 needed = 0.7 needed to complete
C. Naval Development and Construction
at Manila:
S4: BC
Samal laid down 1 Jul; receives 2261t, balance 20859t, completes 6 Mar 28
S3: idle
S1: GB
G100-3 laid down 1 Jul; receives 320t, balance 158t, completes 16 Nov
D2: AC
Mindoro completes scrapping, recovered 131t this quarter
D1: DD
Impavido begins refit 9 Jul; receives 186t, completed 18 Sept
Dockside: DD
Martinete receives 440t, balance 26t, completes 16 Oct
at Butuan:
S2: *under construction*
S1: idle
S0: idle
S0: SC
E-2 laid down 1 Jul; receives 199t, balance 85t, completes 10 Nov
S0: idle
S0: idle
D3: CL
Cíudad Rodrigo begins refit 15 Sept; receives 161t, balance 907t, completes 26 Dec
Dockside: DD
Cormorán receives 65t, commissioned 14 Jul
Dockside: SC
E-1 launched 1 Jul; receives 85t, commissioned 10 Aug
at San Fernando:
S2: idle
D1: DD
Insidioso begins refit 1 Jul; receives 186t, completed 10 Sept
D0: idle
Dockside: CDS
Panabo launched 1 Aug; receives 1505t, balance 3261t, completes 19 May 26
at Puerto Princesa:
S0: idle
Dockside: GB
G100-2 launched 26 Jul; receives 320t, balance 33t, completes 16 Oct
Commericial shipyards:
idle
D. Transactions
0.1 IP + 500 tons of material transferred to Italy to build 10
MAS da 38m torpedo boats.
BC
Princess Royal leased from Britain for a period of four years starting 1 July;
renamed
Presidente Malvar.
Assault transport
Balabac ordered from Japan.
E. Other Notes
Ships laid down this quarter: One battlecruiser, one gunboat and one subchaser.
DD
Zampullín, PB
Avispa, GB
G100-1 complete shakedown cruises.
DD
Indomito completes post-refit shakedown.
DD
Rabijunco continues shakedown cruise.
DD
Insidioso,
Impavido begin post-refit shakedown.
AO
Bambú, TB
T-M1 to
T-M10 on shakedown in the Mediterranian; begin transit home late in the quarter.
DD
Cormorán, SC
E-1 begin shakedown cruises.
F. Scrappage Report
958 tons of material recovered from scrapping will become available in Q4/25
647 tons of material recovered from scrapping will become available in Q1/26
881 tons of material recovered from scrapping will become available in Q2/26
Stockpiled Guns
in turrets: 1 2x6" Mk 12
singles: 8 x 6" Mk VI, 18 x 3" Mk VI
G. Updated Order of Battle, 30 September 1925
Note:
Y)+Z = completed (under repair/refit) + under construction
Second class battleships 2(0)+0
Coast defense battleships 0(0)+1
Battlecruisers 1(0)+1
Armoured cruisers 1(0)+0
Light cruisers 1(1)+0
Escort cruisers 3(0)+0
Destroyers 11(0)+1
Destroyer Escorts 5(0)+0
Subchasers 1(0)+1
Submarines 1(0)+0
Torpedo boats 3(0)+0
Fast torpedo craft 10(0)+0 (+30 on order from Italy)
Gunboats 1(0)+2
Patrol boats 2(0)+0
Assault Transports 0(0)+1 building in Japan
Minesweepers (coastal) 9(0)+0
Minelayers 2(0)+0
Oilers 1(0)+0
------------