You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, November 28th 2004, 2:21pm

Philippines Q3/25

Marina de Filipinas
1925 Third Quarter Report
1 July-30 September


A. Factories

6/11 factories = 6,000t of material + 0t stockpiled + 234t from scrapping = 6,234t available
5728t are used, and 500t transferred, leaving a stockpile of 6t.

5/11 factories (committed) = 0.5 infrastructure pts +
0/11 factories (flexible) = 0.0 pts = 0.5 pts available
0.4 pts are used, and 0.1 pts transferred

B. Infrastructure Development

Continued construction of Type 2 slip at Butuan
0.4 points alotted = 1.3 total/2 needed = 0.7 needed to complete

C. Naval Development and Construction

at Manila:
S4: BC Samal laid down 1 Jul; receives 2261t, balance 20859t, completes 6 Mar 28
S3: idle
S1: GB G100-3 laid down 1 Jul; receives 320t, balance 158t, completes 16 Nov
D2: AC Mindoro completes scrapping, recovered 131t this quarter
D1: DD Impavido begins refit 9 Jul; receives 186t, completed 18 Sept
Dockside: DD Martinete receives 440t, balance 26t, completes 16 Oct

at Butuan:
S2: *under construction*
S1: idle
S0: idle
S0: SC E-2 laid down 1 Jul; receives 199t, balance 85t, completes 10 Nov
S0: idle
S0: idle
D3: CL Cíudad Rodrigo begins refit 15 Sept; receives 161t, balance 907t, completes 26 Dec
Dockside: DD Cormorán receives 65t, commissioned 14 Jul
Dockside: SC E-1 launched 1 Jul; receives 85t, commissioned 10 Aug

at San Fernando:
S2: idle
D1: DD Insidioso begins refit 1 Jul; receives 186t, completed 10 Sept
D0: idle
Dockside: CDS Panabo launched 1 Aug; receives 1505t, balance 3261t, completes 19 May 26

at Puerto Princesa:
S0: idle
Dockside: GB G100-2 launched 26 Jul; receives 320t, balance 33t, completes 16 Oct

Commericial shipyards:
idle

D. Transactions

0.1 IP + 500 tons of material transferred to Italy to build 10 MAS da 38m torpedo boats.

BC Princess Royal leased from Britain for a period of four years starting 1 July;
renamed Presidente Malvar.

Assault transport Balabac ordered from Japan.

E. Other Notes

Ships laid down this quarter: One battlecruiser, one gunboat and one subchaser.

DD Zampullín, PB Avispa, GB G100-1 complete shakedown cruises.

DD Indomito completes post-refit shakedown.

DD Rabijunco continues shakedown cruise.

DD Insidioso, Impavido begin post-refit shakedown.

AO Bambú, TB T-M1 to T-M10 on shakedown in the Mediterranian; begin transit home late in the quarter.

DD Cormorán, SC E-1 begin shakedown cruises.

F. Scrappage Report

958 tons of material recovered from scrapping will become available in Q4/25
647 tons of material recovered from scrapping will become available in Q1/26
881 tons of material recovered from scrapping will become available in Q2/26

Stockpiled Guns
in turrets: 1 2x6" Mk 12
singles: 8 x 6" Mk VI, 18 x 3" Mk VI

G. Updated Order of Battle, 30 September 1925

Note: X(Y)+Z = completed (under repair/refit) + under construction

Second class battleships 2(0)+0
Coast defense battleships 0(0)+1
Battlecruisers 1(0)+1
Armoured cruisers 1(0)+0
Light cruisers 1(1)+0
Escort cruisers 3(0)+0
Destroyers 11(0)+1
Destroyer Escorts 5(0)+0
Subchasers 1(0)+1
Submarines 1(0)+0
Torpedo boats 3(0)+0
Fast torpedo craft 10(0)+0 (+30 on order from Italy)
Gunboats 1(0)+2
Patrol boats 2(0)+0
Assault Transports 0(0)+1 building in Japan
Minesweepers (coastal) 9(0)+0
Minelayers 2(0)+0
Oilers 1(0)+0

------------