You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Tuesday, November 16th 2004, 1:40pm

Quarterly Report #18 for the SAE

[SIZE=3]SAE Quarterly Reports [/SIZE]

No. 18 – April to June 1925


Transfers:

840ts material transferred from Turkey


Factories:

26 factories total can be used.

Fixed factories

12 factories will be fixed to produce infrastructure points for 1925.

Flexible factories

1239ts material transferred from Q1

13,307s material necessary to be produced in this quarter (14 factories).

0 factory producing 0,0pts for infrastructure.


Infrastructure points used this quarter:

1,2pts put into a new Type 4 Dock in Cape Town for a total of 4,1pts at the end of Q2


[SIZE=3]Ships:[/SIZE]

Minor vessels

Completed Units

13x Flower-class minesweeper
15x Tree-class minesweeper
10x Bush-class minesweeper

7x Planet-class sloops
11x Centaur-class sloops
4x Polar-class sloops
20x S-class sloops

2x Pleiades-class light destroyers

6x Guard-class patrol crafts

4x Mimir-class floatplane carriers

On Trials

2x Bush-class minesweeper
- Cornel running trials until September 25
- Cranberry running trials until September 25

4x Pleiades-class light destroyer
- Alkyone running trials until April 25
- Elektra running trials until April 25
- Asterope running trials until April 25
- Sterope running trials until June 25
- Taygete running trials until September 25
- Kaleino running trials until September 25

Ordered Units

8x River-class frigate (10 month á 60ts material necessary per unit)
- Gariep laid down in Daressalam on a Type 1 slip in March, completed December
- Limpopo laid down in Douala on a Type 1 slip in February, completed November
- Zambezi laid down in Majunga on a Type 1 slip in January, completed October
- Rovuna laid down in Port Louis on a Type 1 slip in January, completed October
- Save Púngoè laid down in Montevideo on a Type 1 slip in February, completed November
- Vaal laid down in Port Elizabeth on a Type 1 slip in April, completed January 26
- Lurio laid down in Buenos Aires on a Type 1 slip in April, completed January 26
- Messalo laid down in Mar del Plata on a Type 1 slip in June, completed March 26

4x Turkish Bush-class minesweeper (10 month á 53ts material necessary per unit)
- MS1 laid down on Prince Eduard Islands on a Type 0 slip in January, completed in October
- MS2 laid down in Douala on a Type 0 slip in January, completed in October
- MS3 laid down in Montevideo on a Type 0 slip in January, completed in October
- MS4 laid down in Buenos Aires on a Type 0 slip in January, completed in October

Refits

None


Destroyers

Completed Units

11x Bird-class torpedoboat
12x Cat-class torpedoboat
12x Hound-class torpedoboat

12x Nymph-class destroyer (Type 21)
6x Nymph-class destroyer (Type 23)

On Trials

2x Nymph-class destroyer
- Eupompe running trials until June 25
- Eulimene running trials until July 25

Ordered Units

2x Nymph-class destroyer (Type 23 - 11 month á 127ts material necessary per unit)
- Galene laid down in Durban on a Type 1 slip in April, completed in February 26
- Glaukonome laid down in Cape Town on a Type 1 slip in April, completed in February 26

Rebuilds

1x TB16-class torpedo boat (6 month á 128ts material necessary per unit)
- Ounce entering a Type 1 dock in Buenos Aires in June. Leaving the dock in July, the torpedo boat will stay in the yard until November 25


Class B Cruisers

Completed Units

11x Insect-class torpedoboat
1x Nampula-class light cruiser
5x Pietermaritzburg-class light cruiser
6x Port Shepstone-class light cruiser
6x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser
4x Rosario-class light cruiser

On Trials

2x CL08-class light cruiser
- Oudtshoorn running trials until July 25
- Kimberly running trials until April 25

Ordered Units

2x CL24-class light cruiser (17 month á 465ts material necessary per unit)
- Aurora laid down in Mar del Plata on a Type 2 slip in August 24, completed in December 25
- Bellona laid down in Port Elizabeth on a Type 2 slip in April 25, completed in August 26

Rebuilds

1x CL08-class light cruiser (7 month á 283ts material necessary per unit)
- Nampula entering a Type 2 dock in Daressalam in October. Leaving the dock in December 24, the light cruiser will stay in the yard until April 25


Class A Cruisers

Completed Units

1x Colony-class AC
2x General-class AC

On Trials

4x Cape-class armored cruiser
- Cape Lopez running trials until April 25
- Cape Good Hope running trials until May 25
- Cape Corrientes running trials until May 25
- Cape Delgado running trials until April 25

Ordered Units

None


Capital Units

Completed Units

1x Madagascar-class (to be scrapped)
2x Sao Tome-class
2x Hertog-class
4x King-class
2x Mauritius-class
2x South Africa-class
2x Mocambique-class

On Trials

2x Hertog-class battle cruiser
- Hertog Rijnard running trials until June 25
- Hertog Alexander running trials until September 25

Ordered Units

2x BB24G-class (37 month á 808ts/month material necessary per unit)
- Ophion laid down on a Type 4 slip in Montevideo in January 24, completed in November 1927
- Hyperion laid down on a Type 4 slip in Durban in April 25, completed in February 29

Rebuilds

None


Coastal Defence Units

Completed Units

Nonce

Ordered Units

1x CDS23-class (452ts/month material necessary per unit)
- Nagelring laid down on a Type 2 slip in Montevideo in January 24, completed in May 1925


Carriers

Completed Units

1x Wim Kraash-class (converted freighter, rated as experimental, to be replaced by CV25B)

Ordered Units

1x CV25B-class fleet carrier (29 month á 690ts material necessary per unit)
- Hammer laid down in Durban on a Type 4 slip in January, completed in May 27


Class A Submarines

Completed Units

12x E-class submarine
16x F-class submarine
4x J-class submarine

Ordered Units

None


Class B Submarines

Completed Units

14x G-class submarine
15x I-class submarine
12x H-class submarine

Ordered Units

2x K-class submarine (10 month á 46ts material necessary per unit)
- K1 laid down in Durban on a Type 0 slip in January, completed in Oktober
- K2 laid down in Cape Town on a Type 1 slip in January, completed in Oktober


Non-combatants

Completed Units

14x Bay-class tender (several different designs)

Ordered Units

1x TD25-class tender (12 month á 180ts material necessary per unit)
- TD25-1 laid down in Daressalam on a Type 0 slip in January, completed in December

----------------------------------------------------------------------------------------------------

At the beginning of this quarter the RSAN consists of (units in service only):

40 minesweepers
50 small patrol crafts
53 TB/DDs (does not include 11 TBs with 15cm guns)
41 cruisers category b (does include 11 TBs with 15cm guns)
3 cruisers category a
15 capital units
1 experimental carrier (conversion)
41 submarines category b
32 submarines category a
4 floatplane carriers
14 armed tenders

plus numerous auxiliary vessels of all kind.