A. Industrial Allocation
14/29 factories to naval materials: 14,000 tons created for Q2/1925 plus 106 tons stockpiled from Q1/25 for 14,106 total tons.
13,895 tons used for ship building, 211 tons stockpiled for next quarter.
15/29 factories (fixed) to infrastructure development: 1.5 points for Q2/1925
B. Infrastructure Development
1 new factory (#30) with 8.5 points completed by the end of Q2/1925 needs 1.5 points to complete
1.5 points added to factory #30 in Q2/1925
C. Naval Construction
At Cleito
Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - BB Aggamemnon converting to Gunnery training ship, 7450 tons needed, 7150 tons used, 1000 tons added in Q2/24
Class 4 Drydock #2 - Idle
Class 1 Slip #1 - DD Goshawk laid down, 400 tons used, 400 tons added
Class 1 Slip #2 - DD Greyhound laid down, 400 tons used, 400 tons added
Class 1 Slip #3 - MS-14 building, 355 tons needed, 200 tons used, 200 tons added
At Eridanus
Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 2 Slip #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - DD Grenade laid down, 400 tons used, 400 tons added
Class 1 Slip #2 - DD Grey laid down, 400 tons used, 400 tons added
2x115 ton E class subchaser/patrol boats also being constructed.
At Duecalion
Class 3 Slip #1 - Idle
Class 3 Slip #2 - CA Peleus, 7000 tons used, 1000 tons added in Q4/24
Class 3 Drydock #1 - AC Cape Verde converting to training ship, 5800 tons needed, 2903 tons used, 1000 tons added in Q4/24
Class 2 Slip #1 - MS-15 building, 355 tons needed, 200 tons used, 200 tons added
Class 2 Slip #1 - Idle
Class 2 Drydock #1 - Idle
3x115 ton E class subchaser/patrol boats also being constructed.
At Illissus
Class 3 Slip #1 - CA Astyanax, 2000 tons used, 1000 tons added.
Class 3 Slip #2 - CA Sarpedon, 2000 tons used, 1000 tons added.
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - DD Goldfinch laid down, 400 tons used, 400 tons added
Class 0 Slip #1 - Idle
3x115 ton E class subchaser/patrol boats also being constructed.
At Phelleus
Class 3 Slip #1 - CA Menelaus 7000 tons used, 1000 tons added
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - AC Venezuela converting to training ship, 5800 tons needed, 2903 tons used, 1000 tons added in Q4/24
Class 3 Drydock #2 - Idle
Class 5 Drydock #1 - Idle
Class 1 Slip #1 - MS-16 building, 355 tons needed, 200 tons used, 200 tons added
Class 1 Slip #2 - MS-17 building, 355 tons needed, 200 tons used, 200 tons added
Class 1 Slip #3 - Idle
Class 0 Slip #1 - Idle
3x115 ton E class subchaser/patrol boats also being constructed.
At Lycabettus
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 2 Drydock #2 - Idle
Class 1 Slip #1 - MS-18 building, 355 tons needed, 200 tons used, 200 tons added
Class 1 Slip #2 - MS-19 building, 355 tons needed, 200 tons used, 200 tons added
Class 1 Slip #3 - Idle
Class 1 Drydock #1 - Idle
3x115 ton E class subchaser/patrol boats also being constructed.
At Maracaibo
Class 3 Drydock #1 - Idle
Class 1 Slip #1 - DD Gladiator laid down, 400 tons used, 400 tons added
Class 1 Slip #2 - DD Gambler laid down, 400 tons used, 400 tons added
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
At Safi
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - MPSS ship Patronus 4,000 tons needed, 3914 tons used, 1000 tons added in Q2/25
Class 1 Slip #2 - DD Gazelle laid down, 400 tons used, 400 tons added
Class 1 Drydock #1 - Idle
Launched ships being completed:
none
Ships completed and on trials
Repair ship Assistance
none
Summary of ship building/repairs/rebuilds and convertions.
BB Aggamemnon converting to gunnery training ship
AC's Cape Verde and Venezuela converting to training ships.
CA's Astyanax and Sarpedon building
CA's Menelaus and Peleus lauched, fitting out
MPSS Patronus building
8 G-class destroyers building
6 MS-9 class minelayers building
14 E class sub chasers building
D. Transactions
None.
E. Other Notes
BB Aggamemnon and AC's Cape Verde and Venezuela converting to gunnery training ships.
CVX Evamon scrapping
Brencis class scout cruisers scrapping
Nereus class CL's scrapping
F. Updated Order of Battle, 1/4/25
Note:
Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
BB: 9(1)0
BC: 2(0)0
CV: 3(0)0
CA: 10(0)4
CAE:0(0)0
CL: 49(0)0
DD: 130(0)8
Torpedo boats: N/A
Sloops: N/A
Frigates: N/A
Moniters:2(0)0
Torpedo gunboats: 32(0)0
Gunboats 12(0)0
Patrol vessels 50(0)0
Mine sweepers 12 (0) 6
Sub chasers 214(0)14
Fleet Submarine: 20(0)0
Coastal Submarine: 60(0)0
Floatplane carrier/tenders 4(0)0
destroyer depot ships 2(0)0
Submarine depot ships 1(0)1
Auxillary's N/A