You are not logged in.

1

Thursday, November 4th 2004, 10:05am

Italy Q2/25

Its been nearly a month since I last posted, and I have my reports worked out in advance so....

------------------------------------------------

01/04/1925-30/06/1925 2nd quarter
[SIZE=1]17 Factories [/SIZE]

Genoa, Ansaldo yard -
1 Type 3 Slipway – RM Francesco Ferrucio – 8.7 months left – 2000t – 2761t to complete
1 Type 3 Slipway -
1 Type 3 Drydock -
1 Type 3 Drydock -

RM Pisa – complete – 839t
RM Amalfi – complete – 839t

La Spezia Naval yard -
1 Type 1 slipway -
1 Type 1 Drydock -

Taranto Naval Headquarters -
1 Type 4 Slipway -
1 Type 4 Drydock -
1 Type 3 Slipway – RM Alberico da Barbiano – 8.7months left – 2000t – 761t to complete
1 Type 3 Drydock – RM Bartolomeo Colleoni – 8.7months left - 2000t– 3761t to complete
1 Type 3 Drydock -
1 Type 1 Slipway -
1 Type 1 Drydock –

PRS Bambu Oiler building for the Philipines

Napoli di Castellammare -
1 Type 3 Slipway – RM Giovanni delle Bande Nere – 8.7 months left - 1000t – 4761t to complete
1 Type 3 Drydock -
1 Type 1 Slipway -
1 Type 1 Drydock -

RM Marco Polo – complete – 839t

Venezia, Naval yard -
1 Type 3 Slipway - Veinticinco de Mayo Class cruiser for Argentina - completes Q4/27
1 Type 3 Slipway - Veinticinco de Mayo Class cruiser for Argentina - completes Q4/27
1 Type 3 Drydock -
1 Type 1 Slipway -
1 Type 1 Drydock -

RM Generale Pueyrredon – complete – 839t
RM Generale San Martin – complete – 839t

Trieste, Ansaldo yard -
1 Type 4 slipway -
1 Type 4 slipway –

RM Lepanto – complete

Messina, Naval yard -
1 Type 4 Drydock -
1 Type 3 Slipway – RM Alberto da Giussano – 8.7 months left – 1000t - 4761t to complete
1 Type 3 Slipway -
1 Type 3 Drydock -
1 Type 1 Slipway -

RM Vettor Pisani – complete – 839t
RM Carlo Alberto – complete – 839t

Cagliari, Naval yard -
1 Type 3 Drydock -
1 Type 1 Drydock -

Massawa, Eritrea -
1 Type 1 Slipway -
1 Type 1 Drydock –

Mogadishu, Italian Somaliland -

13873tons materials needed.
320tons used from last quarter stockpile. 14 factories produce 14,000t of materials. 447tons stockpiled.

3 fixed factories produce 0.3pts
0 unfixed factories produces 0.0pts

0.0pts spent on Factory No. 18
Factory No. 18 needs 5.4pts to complete

0.3pts spent on Type 1 Drydock at Mogadishu
Type 1 Drydock needs 0.4pts to complete


Fleet Strength
BB. 9(0)+0
CV. 2(0)+0
CA. 1(0)+0
CL. 22(0)+5
CDA. 4(0)+0
DD. 42(0)+0
Submarines. a) 1(0)+0
b) 20(0)+0
Escorts. 20(0)+0
MAS. 87(0)+0

2

Thursday, November 4th 2004, 1:39pm

PRS Bambú is complete!

The Philippines sends 1,818 tons of materials to Italy this quarter for construction of PRS Bambú. The ship is completed on 20 June, and will spend the next three months working up in the Mediterranian before heading for home.

----------------------------------------------------------------------

Maybe we can hit the desired quarter-every-two-weeks pace now? :)

I'm not going to post my Q2 until the 15th or so (have a bit of a...prickly Treaty issue to work out first, so watch the Meeting Place board).