German Naval Developments - Q1/25
A. Industrial Allocation
4/11 factories produce 4000 t of warship materials, with a stockpile of 1,467 t for a total of 5,467 t. Of this, 3,635 t are used for construction programs. A stockpile of 2,146 t are carried over.
7/11 factories are committed to manufacturing naval infrastructure materials, producing 0.7 pts.
B. Infrastructure Development
Factory 12 receives 0.7 pts, for a total of 8.9 pts.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: AM
R-9 receives 319 t
At Bremerhaven
1 Type 2 slip: DD
Z-207 laid down 1/1/25, receives 426 t
1 Type 1 slip:
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
Free-floating: DD
Z-205 receives 426 t
Free-floating: AM
R-10 receives 319 t
At Cuxhaven
1 Type 3 slip: CL
Ersatz Arcona laid down 1/1/25, receives 1400 t
1 Type 3 drydock: Idle
1 Type 2 slip:
1 Type 1 slip:
1 Type 0 slip: Idle
Free-floating: AM
R-8 receives 105 t, completes 31/1/25
At Kiel
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slips: DD
Z-206 receives 426 t, launched 14/2/25
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
Free-floating: DD
Z-204 receives 214 t, completed 14/2/25
D. Transactions
DD
V-2 deleted from service 1/1/25, to be scrapped starting Q2 in Bremerhaven
E. Other Notes
CL
Konigsberg , minesweepers
R-5 and
R-6 complete shake-down cruises
DD
Z-203 , minesweeper
R-7 continue shake-down cruise.
DD
Z-204 , minesweeper
R-8 commence shake-down cruises
New Orders: 1 light cruiser, 1 destroyer.
F. Updated Order of Battle, 31/3/25
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 12(0)+1
DD: 24(0)+3, 1 other deleted for scrapping
SL: 6(0)+0
AM: 8(0)+2
Note: PD = pre-dreadnought