You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Wednesday, October 9th 2019, 3:40pm

Quarterly Report #99 for the SAE

SAE Quarterly Reports

No. 99 – July to September 1945


Transfers/Notes:


None


Factories:

27 factories total can be used.

Fixed factories

1 factory fixed to produce infrastructure points in 1945.

Flexible factories

24,999ts of material produced this quarter (25 factories).

1 factories will produce infrastructure points this quarter.

Material handling

170ts of material transferred from Q2/45.

0ts of material recovered from scrap yard.

25,169ts of material used this quarter.

1ts of material transferred to Q4/45.

Infrastructure points used this quarter

0,2pts put into an upgrade of the Type 4 dock in Montevideo to Type 4.5 for a total of 0,5pts/0,5pts at the end of Q3/45


Ships:

Minor vessels


Completed Units

24x UJ30-class ASW launch
24x UJ35-class ASW launch
16x UJ42-clas ASW launch
13x UJ44-class ASW launch

12x R31-class motor launch
8x R37-class motor launch
32x R42-class motor launch

20x S34-class motor torpedo boat
12x S36-class motor torpedo boat
12x S40-class motor torpedo boat

13x Bush-class minesweeper (Type 21)
10x Cactus-class minesweeper (Type 28)
8x Flower-class minesweeper (Type 35)
8x Seychelles-class minesweeper (Type 38)
8x Centaur-class minesweeper (Type 42)

12x Coastal-class minesweeper (Type 37)
12x Coastal-class minesweeper (Type 41)

2x Circe-class sloops
4x Polar II-class sloops
4x Pelican-class sloop

12x River-class frigate (Type 25)
4x Lake-class frigate (Type 35)
8x Mountain-class frigate (Type 40)

8x Bird-class light destroyer (Type 35)

5x Guard-class patrol crafts
1x Lorelei-class coast guard cutter

4x Garcia-class river gun boat (Type 35)
2x General-class river gun boat (Type 37)
2x General-class river gun boat (Type 42)
2x Drudge-class river gun boat (Type 43)

2x Argonaut-class river monitors (Type 36)
3x Kastor-class river monitors (Type 44)

On Trials

3x UJ44-class ASW launch
- UJ118-UJ120 running trials until July 45

3x S45-class motor torpedo boat
- S56-S58 running trials until September 45

1x Circe-class sloop
- Euryale running trials until November 45

1x Pelican-class sloop
- Albatross running trials until October 45

1x RM44-class river monitor
- Zetes running trials until July 45

Ordered Units

3x Pelican-class sloop (11 month and 97ts material required per unit)
- Shoebill laid down in St. Helena on a Type 1 slip in September 44, completed in July 45
- Loon laid down in Montevideo on a Type 1 slip in May 45, completed in March 46
- Petrel laid down in Port Louis on a Type 1 slip in July 45, completed in May 46

9x S45-class motor torpedo boat (1 month and 100ts material required per unit)
- S59-S61 laid down in Rio Grande in July 45, completed in July 45
- S62-S64 laid down in Rio Grande in August 45, completed in August 45
- S65-S67 laid down in Rio Grande in September 45, completed in September 45

2x Ostara-class Fishery Protection Sloop (11 month and 141ts material required per unit)
- Ostara laid down in Port Elizabeth on a Type 1 slip in July 45, completed in May 46
- Gefjon laid down in Daressalam on a Type 1 slip in August 45, completed in June 46

Rebuilds/Refits/Repairs

1x Circe-class sloop (4 month and 38ts of material required)
- Harpy enters a Type 1 dock in St. Helena in April 45. The sloop will stay in the yard until July 45

Scrapping

4x R28-class motor launch (1 month total)
- R45-R48 scrapping in March 45 – 26ts received from hulls for Q4/1945

7x UJ30-class ASW launch (1 month total)
- UJ49 - UJ50 & UJ52 - UJ54 & UJ57 & UJ60 scrapping in February 45 – 96ts received from hulls for Q4/1945

6x S34-class motor torpedo boat (1 month total)
- S2 - S5 & S7 - S8 scrapping in June 45 – 25ts received from hulls for Q1/1946

11x R31-class motor launch (1 month total)
- R49-R59 scrapping in September 45 – 75ts received from hulls for Q2/1946


Destroyers

Completed Units

8x Reptile-class torpedoboat (Type 35)

8x Nymph-class destroyer (Type 21)
8x Nymph-class destroyer (Type 23)
13x Nymph-class destroyer (Type 27)
16x Nymph-class destroyer (Type 30)
8x Snake-class destroyer (Type 32)
8x Fish-class destroyer (Type 38)

7x Weapon-class large destroyer (Type 28)
7x Weapon-class large destroyer (Type 32)
4x Weapon-class large destroyer (Type 36)

On Trials

1x Weapon-class large destroyer Type 28
- Scythe running trials until September 45

2x Nymph-class destroyer Type 27
- Pherusa running trials until August 45
- Ploto running trials until December 45

1x Weapon-class large destroyer Type 44
- Trident running trials until September 45
- Partisan running trials until October 45

Ordered Units

6x Weapon-class large destroyer (Type 44) (11 month and 241ts material required per unit)
- DD44-3 Glee laid down in Cape Town on a Type 3 slip in August 44, completed in July 45
- DD44-4 Bayonet laid down in Port Elizabeth on a Type 4 slip in January 45, completed in December 45
- DD44-5 Dagger laid down in Daressalam on a Type 2 slip in January 45, completed in December 45
- DD44-6 Stiletto laid down in Port Louis on a Type 2 slip in January 45, completed in December 45
- DD44-7 Mace laid down in Montevideo on a Type 2 slip in April 45, completed in March 46
- DD44-8 Flail laid down in Buenos Aires on a Type 3 slip in July 45, completed in June 46

Rebuilds/Refits/Repairs

1x Nymph-class destroyer Type 27 (6 month a 67ts of material required)
- Polynoe enters a Type 2 dock in Port Elizabeth in March 45. The destroyer will stay in the yard until August 45

Scrapping

None


Fleet Cruisers

Completed Units

4x Yaounde-class fleet cruiser (Type 19)
4x Libreville-class fleet cruiser (Type 21)
4x Rosario-class fleet cruiser (Type 22)
4x Aurora-class fleet cruiser (Type 24)
2x Arion-class fleet cruiser (Type 27)
0x Douala II-class fleet cruiser (Type 29)
2x Ajax-class fleet cruiser (Type 31)
1x Antenor-class fleet cruiser (Type 33)
2x Nampula II- fleet light cruiser (Type 36)
2x Charybdis-class fleet cruiser (Type 38)
1x Soweto-class fleet cruiser (Type 43)

2x Daphne-class anti aircraft cruiser (Type 34)
2x Danae-class anti aircraft cruiser (Type 36)

4x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)
2x Diana-class destroyer leader (Type 34)

1x Lightning-class mine cruiser
1x Hedgehog-class mine cruiser

1x Archer-class experimental fleet cruiser

On Trials

None

Ordered Units

3x CL43C-class fleet cruiser (18 month á 470ts material required per unit)
- Bhisho laid down in Buenos Aires on a Type 4 slip in February 44, completed in July 45
- Harare laid down in Douala on a Type 3 dock in July 44, completed in December 45
- Dodoma laid down in Buenos Aires on a Type 3 dock in October 44, completed in March 46

Repair/Refits/Rebuilds

2x CL29-class fleet cruiser (5 month and 1935ts of material required)
- Douala II entering a Type 3 dock in Durban in July. Leaving the dock in August, the cruiser will stay in the yard until November 45
- Beira II entering a Type 2 dock in Daressalam in July. Leaving the dock in August, the cruiser will stay in the yard until November 45
- Blantyre II entering a Type 2 dock in Port Elizabeth in September. Leaving the dock in October, the cruiser will stay in the yard until January 46

Scrapping

3x CL16 Town-class fleet cruiser (5 month total)
- Santana scrapping from November 44 to March 45 in a Type 4 dock in Port Louis – 690ts received from hulls for Q4/1945
- Santa Fe scrapping from November 44 to March 45 in a Type 4 dock in Port Louis – 690ts received from hulls for Q4/1945
- Parana scrapping from January 45 to May 45 in a Type 2 dock in Daressalam – 690ts received from hulls for Q1/1946


Heavy Cruisers

Completed Units

4x Cape-class (Type 23)
2x Cape-class (Type 26)
0x Dragon-class (Type 29)
2x Hero-class (Type 33)
2x Vengeance-class

On Trials

1x CA29-class heavy cruiser
- Fafnir running trials until December 45

Ordered Units

1x CCA45-I-class heavy cruiser (28 month á 678ts material required per unit)
- Magnificent laid down in Cape Town on a Type 3 slip in July 45, completed in October 47

Repair/Refits

None

Scrapping

None


Capital Units

Completed Units

2x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class
2x Triumph-class
2x Imperator-class
2x Radiance-class
2x Monarch-class
2x Thunderer-class
2x Leviathan-class

On Trials

None

Ordered Units

None

Rebuilds/Refits

None

Scrapping

None


Coastal Defense Units

Completed Units

1x Nagelring-class coastal defence ship
1x Tyrfing-class coastal defence ship
1x Gungnir-class coastal defence ship
1x Excalibur-class coastal defence ship

On Trials

None

Ordered Units

None

Rebuilds/Refits

None


Carriers

Completed Units

1x Forge-class fleet carrier (Type 26)
2x TvD-class fleet carrier (Type 34)
1x Asgard-class fleet carrier (Type 37)
1x Helspanth-class fleet carrier (Type 40)

2x Anvil-class light fleet carrier (Type 30)
1x Endress-class light fleet carrier (Type 36)
1x Westerhold-class light fleet carrier (Type 43)

1x Thjazi-class escort carrier

1x Bölthorn-class floatplane carrier
3x Unicorn-class floatplane carrier
2x Wyvern-class floatplane carrier

On Trials

1x Lagonoy-class escort carrier (for India)
- Lagonoy running trials until November 45

1x Thjazi-class escort carrier
- Ymir running trials until October 45

1x Bahamuth-class fleet carrier
- Bahamuth running trials until December 45

Ordered Units

3x CV42C-class fleet carrier (40 month á 771ts material required per unit)
- Marduk laid down in Montevideo on a Type 4 slip in July 42, completed in October 45
- Tiamat laid down in Durban on a Type 4 slip in January 43, completed in April 46
- Lilith laid down in Montevideo on a Type 4 slip in April 43, completed in July 46

1x CVL43B-class light fleet carrier (23 month á 608ts material required per unit)
- Paul Verhoeven laid down in Cape Town on a Type 3 slip in October 43, completed in August 45

Rebuilds/Refits

None


Class A Submarines

Completed Units

3x J-class submarine
2x L-class submarine
8x M-class submarine
8x O-class submarine
2x Q-class submarine
8x T-class submarine

On Trials

None

Ordered Units

None

Repairs/Rebuilds/Refits

None

Scrapping

None


Class B (Coastal) Submarines

Completed Units

13x K-class submarine
8x N-class submarine
8x P-class mine submarine
8x R-class mine submarine

On Trials

None

Ordered Units

None

Repairs/Rebuilds/Refits

None

Scrapping

None


Landing Vehicles

Completed Units

1x LSC38-class landing ship (ex-AV22)
2x LSC39-class landing ship (ex-TD19)

2x LSA38-class landing ship

4x LST38-class landing craft
1x LST45-class landing craft

8x LSI38-class landing ship

18x LCP45-class landing craft

On Trials

3x LST45-class landing craft
- LST6-LST8 running trials until August 45

2x LCFS45-class landing craft fire support
- LCFS1 running trials until November 45
- LCFS2 running trials until November 45

Ordered Units

1x LCFS45-class landing craft fire support (5 month á 50ts material required per unit)
- LCFS3 laid down in Libreville on a Type 0 slip in March 45, completed in July 45

2x Mountain-class landing ship dock (19 month á 488ts material required per unit)
- LSD45A-1 Mafadi laid down in Durban on a Type 2 slip in July 45, completed in January 47
- LSD45A-2 Ubutsane laid down in Cape Town on a Type 2 slip in July 45, completed in January 47

Repairs/Rebuilds/Refits

None

Scrapping

None


Non-combatants

Completed Units

1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
3x Bay-class tender (Type 22)
2x Bay-class tender (Type 25)
2x Bay-class tender (Type 29)
2x Bay-class tender (Type 35)
2x Bay-class tender (Type 42)

1x FV32-class fleet support ship
2x FV36-class fleet support ship
2x FV43-class fleet support ship

On Trials

None

Ordered Units

1x APD45A-class fast transport (21 month á 552ts material required per unit)
- APD45A-1 Sloth laid down in Durban on a Type 1 slip in January 45, completed in November 45

Repairs/Rebuilds/Refits

None

Scrapping

None

--------------------------------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only, units undergoing refits are not listed):

73 ASW launches
52 motor launches
44 motor torpedo boats
71 minesweepers
48 small patrol crafts
10 river gunboat
5 river monitors
86 TB/DD/DLs
41 fleet cruisers
10 heavy cruisers
20 capital units
4 costal defense ships
10 aircraft carrier
6 floatplane carrier
31 submarines category a
36 submarines category b
36 landing vehicles
19 armed tenders
5 fleet support ship

plus numerous auxiliary vessels of all kind.