You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, March 4th 2019, 3:05am

Oz, Mate? 1945-8

The Great Australian Catch-up begins here....

1945-Q3/1948

Industrial report summaries have placeholder names for the renamed Wombat and Wallaby. Rather than edit them all;
Invincible ----/> Australia
Inflexible ----/> New Zealand

2

Monday, March 4th 2019, 3:07am

Australian Industrial Report – Q1/ 1945
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 440t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 10440t

__________________________________

Infrastructure Development
__________________________________

Naval Construction
HMAS Invincible receives 2000t
HMAS Inflexible receives 2000t
HMAS Pegasus receives 2000t
HMAS OFF-17 receives 500t
HMAS OFF-18 receives 500t
HMAS OFF-19 receives 500t
HMAS OFF-20 receives 500t
HMAS Alacrity receives 400t
HMAS Audacity receives 400t
HMAS Adventure receives 400t
HMAS Advantage receives 400t
HMAS Ambush receives 400t
440t surplus

__________________________________

Sydney, NSW (Cockatoo Island)
Type 3 Drydock: HMAS Australia 8000/24000 (Q4/46)
Type 2 Drydock: Idle
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 0 Slip: Idle
Dockside: HMAS Murri Q3/45
HMAS OFF-16 receives 500t, completed (Q2/45)

Sydney, NSW (Cook Dock, Garden Island)
Type 3 Drydock: HMAS New Zealand 10000/24000 (Q3/46)
Type 2 Drydock: HMAS Adventure 400/400 3/3 months remaining
HMAS Advantage 400/400 3/3 months remaining
HMAS Ambush 400/400 3/3 months remaining
Type 1 Drydock: HMAS Alacrity 400/400 3/3 months remaining
HMAS Audacity 400/400 3/3 months remaining
Dockside: HMAS Murrawarrii Q3/45
HMAS OFF-17 receives 500t, completed (Q2/45)

Devonport, NZ (Calliope Dock)
Type 2 Drydock: Idle
Dockside: HMAS Pegasus 5910/7410 1/10 months remaining

Perth, WA (Garden Island)
Type 1 Drydock: Idle
Dockside: HMAS OFF-18 receives 500t, completed (Q2/45)


Port Moresby, NG
Type 1 Drydock: Idle
Dockside: HMAS OFF-19 receives 500t, completed (Q2/45)

Darwin, NT
Type 1 Drydock:
Dockside: HMAS OFF-20 receives 500t, completed (Q2/45)


__________________________________

Transactions

None
__________________________________

Other Notes
__________________________________

3

Monday, March 4th 2019, 3:08am

Australian Industrial Report – Q2/ 1945
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 440t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 10440t

__________________________________

Infrastructure Development
__________________________________

Naval Construction
HMAS Invincible receives 3000t
HMAS Inflexible receives 3000t
HMAS Pegasus receives 1500t
HMAS Dauntless receives 400t
HMAS Devastator receives 400t
HMAS Defence receives 400t
HMAS Defiance receives 400t
HMAS Desperate receives 400t
940t surplus

__________________________________

Sydney, NSW (Cockatoo Island)
Type 3 Drydock: HMAS Australia 11000/24000 (Q4/46)
Type 2 Drydock: Idle
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 0 Slip: Idle
Dockside: HMAS Murri Q3/45

Sydney, NSW (Cook Dock, Garden Island)
Type 3 Drydock: HMAS New Zealand 13000/24000 (Q3/46)
Type 2 Drydock: HMAS Defence 400/400 3/3 months remaining
HMAS Defiance 400/400 3/3 months remaining
HMAS Desperate 400/400 3/3 months remaining
Type 1 Drydock: HMAS Dauntless 400/400 3/3 months remaining
HMAS Devastator 400/400 3/3 months remaining
Dockside: HMAS Murrawarrii Q3/45
HMAS Alacrity Completed
HMAS Audacity Completed
HMAS Adventure Completed
HMAS Advantage Completed
HMAS Ambush Completed

Devonport, NZ (Calliope Dock)
Type 2 Drydock: Idle
Dockside: HMAS Pegasus Completed

Perth, WA (Garden Island)
Type 1 Drydock: Idle
Dockside: Idle


Port Moresby, NG
Type 1 Drydock: Idle
Dockside: Idle

Darwin, NT
Type 1 Drydock:
Dockside: Idle


__________________________________

Transactions

None
__________________________________

Other Notes

4

Monday, March 4th 2019, 3:09am

Australian Industrial Report – Q3/ 1945
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 440t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 10440t

__________________________________

Infrastructure Development
__________________________________

Naval Construction
HMAS Invincible receives 3000t
HMAS Inflexible receives 3000t
HMAS Firefly receives 400t
HMAS Falcon receives 400t
HMAS Flanker receives 400t
HMAS Firefox receives 400t
HMAS Flamingo receives 400t
2440t surplus

__________________________________

Sydney, NSW (Cockatoo Island)
Type 3 Drydock: Idle
Type 2 Drydock: Idle
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 0 Slip: Idle
Dockside: HMAS Australia 14000/24000 (Q4/46)
HMAS Murri Completed

Sydney, NSW (Cook Dock, Garden Island)
Type 3 Drydock: Idle
Type 2 Drydock: HMAS Flanker 400/400 3/3 months remaining
HMAS Firefox 400/400 3/3 months remaining
HMAS Flamingo 400/400 3/3 months remaining
Type 1 Drydock: HMAS Firefly 400/400 3/3 months remaining
HMAS Falcon 400/400 3/3 months remaining
Dockside: HMAS New Zealand 16000/24000 (Q3/46)
HMAS Murrawarrii Completed
HMAS Dauntless Completed
HMAS Devastator Completed
HMAS Defence Completed
HMAS Defiance Completed
HMAS Desperate Completed

Devonport, NZ (Calliope Dock)
Type 2 Drydock: Idle
Dockside: Idle

Perth, WA (Garden Island)
Type 1 Drydock: Idle
Dockside: Idle


Port Moresby, NG
Type 1 Drydock: Idle
Dockside: Idle

Darwin, NT
Type 1 Drydock:
Dockside: Idle


__________________________________

Transactions

None
__________________________________

Other Notes

5

Monday, March 4th 2019, 3:10am

Australian Industrial Report – Q4/ 1945
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 2440t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 12440t

__________________________________

Infrastructure Development
__________________________________

Naval Construction
HMAS Invincible receives 3000t
HMAS Inflexible receives 3000t
HMNZS Aukland receives 2000t
HMAS Newcastle receives 1000t
HMAS Rockhampton receives 1000t
HMAS Townsville receives 1000t
HMAS Freemantle receives 1000t
440t surplus

__________________________________

Sydney, NSW (Cockatoo Island)
Type 3 Drydock: HMAS Newcastle 1000/2900 4/4 months remaining
Type 2 Drydock: HMAS Rockhampton 1000/2900 4/4 months remaining
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 0 Slip: Idle
Dockside: HMAS Australia 17000/24000 (Q4/46)

Sydney, NSW (Cook Dock, Garden Island)
Type 3 Drydock: HMAS Townsville 1000/2900 4/4 months remaining
Type 2 Drydock: HMAS Freemantle 1000/2900 4/4 months remaining
Type 1 Drydock: Idle
Dockside: HMAS New Zealand 19000/24000 (Q3/46)
HMAS Firefly Completed
HMAS Falcon Completed
HMAS Flanker Completed
HMAS Firefox Completed
HMAS Flamingo Completed

Devonport, NZ (Calliope Dock)
Type 2 Drydock: HMNZS Aukland 2000/2900 4/4 months remaining
Dockside: Idle

Perth, WA (Garden Island)
Type 1 Drydock: Idle
Dockside: Idle


Port Moresby, NG
Type 1 Drydock: Idle
Dockside: Idle

Darwin, NT
Type 1 Drydock:
Dockside: Idle


__________________________________

Transactions

None
__________________________________

Other Notes

6

Monday, March 4th 2019, 3:11am

Australian Industrial Report – Q1/ 1946
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 440t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 10440t

__________________________________

Infrastructure Development
__________________________________

Naval Construction
HMAS Invincible receives 3000t
HMAS Inflexible receives 3000t
HMAS Newcastle receives 1000t
HMAS Rockhampton receives 1000t
HMAS Townsville receives 1000t
HMAS Freemantle receives 1000t
440t surplus

__________________________________

Sydney, NSW (Cockatoo Island)
Type 3 Drydock: Idle
Type 2 Drydock: Idle
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 0 Slip: Idle
Dockside: HMAS Australia 20000/24000 (Q4/46)
HMAS Newcastle 2000/2900 1/4 months remaining
HMAS Rockhampton 2000/2900 1/4 months remaining


Sydney, NSW (Cook Dock, Garden Island)
Type 3 Drydock: Idle
Type 2 Drydock: Idle
Type 1 Drydock: Idle
Dockside: HMAS New Zealand 22000/24000 (Q3/46)
HMAS Townsville 2000/2900 1/4 months remaining
HMAS Freemantle 2000/2900 1/4 months remaining


Devonport, NZ (Calliope Dock)
Type 2 Drydock: Idle
Dockside: HMNZS Aukland 2000/2900 1/4 months remaining

Perth, WA (Garden Island)
Type 1 Drydock: Idle
Dockside: Idle


Port Moresby, NG
Type 1 Drydock: Idle
Dockside: Idle

Darwin, NT
Type 1 Drydock:
Dockside: Idle


__________________________________

Transactions

None
__________________________________

Other Notes

7

Monday, March 4th 2019, 3:11am

Australian Industrial Report – Q2/ 1946
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 440t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 10440t

__________________________________

Infrastructure Development
__________________________________

Naval Construction
HMAS Invincible receives 3000t
HMAS Inflexible receives 2000t
HMNZS Aukland receives 900t
HMAS Newcastle receives 900t
HMAS Rockhampton receives 900t
HMAS Townsville receives 900t
HMAS Freemantle receives 900t
HMNZS Wellington receives 900t
40t surplus

__________________________________

Sydney, NSW (Cockatoo Island)
Type 3 Drydock: Idle
Type 2 Drydock: Idle
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 0 Slip: Idle
Dockside: HMAS Australia 23000/24000 (Q4/46)
HMAS Newcastle Completed
HMAS Rockhampton Completed


Sydney, NSW (Cook Dock, Garden Island)
Type 3 Drydock: Idle
Type 2 Drydock: Idle
Type 1 Drydock: Idle
Dockside: HMAS New Zealand 24000/24000 (Q3/46)
HMAS Townsville Completed
HMAS Freemantle Completed


Devonport, NZ (Calliope Dock)
Type 2 Drydock: HMNZS Wellington 900/2900 4/4 months remaining
Dockside: HMNZS Aukland Completed

Perth, WA (Garden Island)
Type 1 Drydock: Idle
Dockside: Idle


Port Moresby, NG
Type 1 Drydock: Idle
Dockside: Idle

Darwin, NT
Type 1 Drydock:
Dockside: Idle


__________________________________

Transactions

None

8

Monday, March 4th 2019, 3:12am

Australian Industrial Report – Q3/ 1946
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 40t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 10040t

__________________________________

Infrastructure Development
__________________________________

Naval Construction
HMAS Invincible receives 1000t
HMNZS Wellington receives 2000t
RAFA Ayer's Rock receives 3000t
RAFA Kokerbin Rock receives 3000t
1040t surplus

__________________________________

Sydney, NSW (Cockatoo Island)
Type 3 Drydock: RAFA Ayer's Rock 3000/3500 6/6 months remaining
Type 2 Drydock: Idle
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 0 Slip: Idle
Dockside: HMAS Australia 24000/24000 (Q4/46)

Sydney, NSW (Cook Dock, Garden Island)
Type 3 Drydock: RAFA Kokerbin Rock 3000/3500 6/6 months remaining
Type 2 Drydock: Idle
Type 1 Drydock: Idle
Dockside: HMAS New Zealand Completed

Devonport, NZ (Calliope Dock)
Type 2 Drydock: Idle
Dockside: HMNZS Wellington 2900/2900 1/4 months remaining

Perth, WA (Garden Island)
Type 1 Drydock: Idle
Dockside: Idle


Port Moresby, NG
Type 1 Drydock: Idle
Dockside: Idle

Darwin, NT
Type 1 Drydock:
Dockside: Idle


__________________________________

Transactions

None

9

Monday, March 4th 2019, 3:13am

Australian Industrial Report – Q4/ 1946
__________________________________

Industrial Allocation

10/10 factories are dedicated to producing infrastructure materials = 1 pts

0/10 factories are producing infrastructure materials = 0 pts

0/10 factories producing warship material = 0t.

Stockpiled warship material available = 1040t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 1040t

__________________________________

Infrastructure Development
__________________________________

Naval Construction
RAFA Ayer's Rock receives 500t
RAFA Kokerbin Rock receives 500t
40t surplus

__________________________________

Sydney, NSW (Cockatoo Island)
Type 3 Drydock: Idle
Type 2 Drydock: Idle
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 0 Slip: Idle
Dockside: HMAS Australia Completed
RAFA Ayer's Rock 3500/3500 3/6 months remaining

Sydney, NSW (Cook Dock, Garden Island)
Type 3 Drydock: Idle
Type 2 Drydock: Idle
Type 1 Drydock: Idle
Dockside: RAFA Kokerbin Rock 3500/3500 3/6 months remaining

Devonport, NZ (Calliope Dock)
Type 2 Drydock: Idle
Dockside: HMNZS Wellington Completed

Perth, WA (Garden Island)
Type 1 Drydock: Idle
Dockside: Idle


Port Moresby, NG
Type 1 Drydock: Upgrade to Type 2 Drydock (1 IP)
Dockside: Idle

Darwin, NT
Type 1 Drydock:
Dockside: Idle


__________________________________

Transactions

None

10

Monday, March 4th 2019, 3:14am

Australian Industrial Report – Q1/ 1947 -Q3/ 1948
__________________________________

10/10 factories are dedicated to producing infrastructure materials x 8 quarters (Q4/46-Q3/48 ) = 10 IP

Q4/46 (See Above)
Port Moresby, NG
Type 1 Drydock: Type 2 Drydock (1 IP)

Q1/47-Q3/48
Sydney, NSW (Cockatoo Island)
Type 3 Drydock: Type 4 Drydock (1 IP)
Type 2 Drydock: Type 4 Drydock (2 IP)

Sydney, NSW (Garden Island)
Type 3 Drydock: Type 4 Drydock (1 IP)
Type 2 Drydock: Type 4 Drydock (2 IP)

Devonport, NZ (Calliope Dock)
Type 2 Drydock: Type 3 Drydock (1 IP)

Perth, WA (Garden Island)
Type 1 Drydock: Type 2 Drydock (1 IP)

Darwin, NT
Type 1 Drydock: Type 2 Drydock (1 IP)

11

Monday, March 4th 2019, 3:32am

Australian Industrial Report – Q4/ 1948
__________________________________

[pending]