You are not logged in.

1

Monday, January 15th 2018, 5:56pm

Chinese Naval Developments – Q1/1948



A. Industiral Allocation

9/11 factories (non-fixed) to naval materials: 9000 tons created for Q1/1948
2/11 factories (fixed) to infrastructure materials: 0.2 pts created for Q1/1948

Stockpile after Q4/1947: 2133 tons

used for Transaction: 0 tons
received from others: 0 tons

warmaterial recycling: 0 tons (first quarter)
warmaterial recycling: 0 tons (second quarter)


Summary:
9000 tons (manufactured) + 2133 tons (stockpiled) + 0 tons (recycled) - 0 tons (transaction) + 0tons (received) = 11133 tons

used at Tianjin: 3024 tons
used at Shanghai: 700 tons
used at Zhanjiang: 600 tons
used at Kao-hsiung: 900 tons
used at Taipei: 200 tons
used at Mako: 706 tons
used at Dairen: 0 tons
used for small vessels: 0 tons

Stockpile after Q1/1948: 79 tons


B. Infrastructure Development

C. Naval Construction
Built Type 0 Slip at Mako 0.2 pts needed; 0.2 pts. Received; finished


Bohai Shipbuilding at Tianjin:
S2 - #1: not in use
S1 - #1: U-107 ; Guiyu-Class; 1004tons needed; 500tons received; launched
S1 - #2: U-108 ; Guiyu-Class; 1004tons needed; 500tons received; launched
S0 - #1: HICMS Hai Ou-7; 256tons needed; 256tons received; finished; start trials
S0 - #2: HICMS Hai Ou-8; 256tons needed; 256tons received; finished; start trials
S0 - #3: HICMS Hai Ou-9; 256tons needed; 256tons received; finished; start trials
S0 - #4: HICMS Hai Ou-10; 256tons needed; 256tons received; finished; start trials
D2 - #1: U-109 ; Guiyu-Class; 1004tons needed; 500tons received; launched
D1 - #1: U-110 ; Guiyu-Class; 1004tons needed; 500tons received; launched
D0 - #2: not in use


Freefloating / in completation:


Kiangnan Dock & Engineering Works at Shanghai:
S2 - #1: not in use
S1 - #1: HICMS Houbei-1; 858tons needed; 300tons received; launched
S0 - #1: HICMS Linchong-2; 200tons needed; 200tons received; finished; start trials
S0 - #2: HICMS Linchong-3; 200tons needed; 200tons received; finished; start trials
D4 - #1: not in use
D2 - #1: not in use


Freefloating / in completation:



Hudong-Zhonghua Shipbuilding at Zhanjiang:
S1 - #1: HICMS Houbei-2; 858tons needed; 300tons received; launched
S0 - #1: not in use
S0 - #2: not in use
D1 - #1: HICMS Houbei-3; 858tons needed; 300tons received; launched


Freefloating / in completation:



Waigaoqiao Shipbuilding at Kaoshiung:
D0 - #1: HICMS China – 2; 200tons needed; 200tons received; finished; start trials
D0 - #2: HICMS China – 3; 200tons needed; 200tons received; finished; start trials
D1 - #1: HICMS Cuiniao – 1 4560tons needed; 500tons received

Freefloating / in completation:



Quindao Beihai Shipbuilding at Taipei:
S0 - #1: HICMS Shen Neng – 1; 584tons needed; 200tons received
S0 - #2: not in use
D2 - #1: not in use
D3 - #1: not in use


Freefloating / in completation:


Sun Yat Sen Shipbuilding at Mako:
S0 - #1: HICMS Lauting; 823tons needed; 250tons received
S0 - #2: HICMS Hai Ou-6; 256tons needed; 256tons received; finished; start trials
S0 - #3; building
D0 - #1: HICMS Pengwu; 696tons needed; 200tons received

Freefloating / in completation:


Zjiangjin Shipbuilding at Dairen:
D0 - #1: not in use
D1 - #1: not in use
D2 - #1: not in use


Freefloating / in completation:



D. Transactions
Export: 0 tons


Import: 0 tons


Conversion:
HS-03 ex “Pearl of the Orient” requires 2740tons; 1000tons received
HS-04 ex “Pearl of the Pacific” requires 2480tons; 1000tons received
HICMS Haibing requires 924tons; 924tons received; finished; start trials
HICMS Houxin requires 2525tons; 1000tons reiceived

E. Other Notes
stored guns:


F. Small vessels
Small vessels built by factories:


Small vessels built in drydocks:


G. Shakedown cruises
small trials = 3 month:
HICMS Linchong-2
HICMS Linchong-3
HICMS China – 2
HICMS China – 3


great trials (ships over 500tons) = 6 month:
start trials:
HICMS Hai Ou-6
HICMS Hai Ou-7
HICMS Hai Ou-8
HICMS Hai Ou-9
HICMS Hai Ou-10
HICMS Haibing

in trials:
CL Suhitou
CL Yaofeng
HICMS Luhai-6
HICMS Luhai-7
HICMS Luhai-8
HICMS Luhai-9
HICMS Luhai-10
BC Liu Xing

finished trials:
BC Tai-Pei

taken in service:
HICMS Huangfen 622
HICMS Huangfen 623
HICMS Huangfen 624
HICMS Huangfen 625

##################################
Hope there is no fault ... OOB is in work
##################################

2

Tuesday, February 6th 2018, 2:41pm

OOB - Q1/1948


3

Tuesday, February 6th 2018, 2:42pm

OOB Q4/1947 (Textform)

Imperial Chinese Navy - Summary of Ship Type and Status, December 1947


Type : In Service + "Reserve (or Museum)" + Trials + Building + Refitting + "Purchased(not delivered)" = Total

Capital Ships
Battlecruiser (BC) : 2 + 0 + 2 + 0 + 0 + 0 = 4


Aviation Ships
Carrier (CV) : 8 + 0 + 0 + 0 + 0 + 0 = 8
Seaplane Carrier (CVS) : 8 + 0 + 0 + 0 + 0 + 0 = 8


Heavy Cruiser
Heavy Cruiser (CA) : 6 + 0 + 0 + 0 + 0 + 0 = 6
Armoured Cruiser (CA) : 0 + 1 + 0 + 0 + 0 + 0 = 1


Convoy Cruiser
Light Cruiser (CL) : 15 + 3 + 0 + 0 + 0 + 0 = 18
Escort Cruiser (CE) : 10 + 2 + 2 + 0 + 0 + 0 = 14
Protected Cruiser (PC) : 0 + 0 + 0 + 0 + 0 + 0 = 0


Coast-Defence Armourclad
Coastal Defense Ship (CDS) : 4 + 0 + 0 + 0 + 0 + 0 = 4


Escorts
Destroyer Leader (DDL) : 10 + 0 + 0 + 0 + 0 + 0 = 10
Destroyer (DD) : 35 + 0 + 0 + 0 + 0 + 0 = 35
Frigates (FR) : 19 + 0 + 0 + 0 + 0 + 0 = 19
Destroyer Escort (DE) : 35 + 0 + 5 + 0 + 0 + 0 = 40


Mine Warfare
Mine Warfare Ship (MWS) : 24 + 0 + 0 + 1 + 0 + 0 = 25


Amphibious Warfare
Amphibious Vessel (AV) : 21 + 0 + 0 + 0 + 0 + 0 = 21
Landing Craft Personal (LCVP) : 64 + 0 + 0 + 0 + 0 + 0 = 64


Submarine Forces
Training Submarine : 5 + 1 + 0 + 0 + 0 + 0 = 6
Coastal Submarine (SSC) : 38 + 0 + 0 + 0 + 0 + 0 = 38
Fleet Submarine (SSF) : 12 + 0 + 0 + 0 + 0 + 0 = 12
Ocean Submarine (SSO) : 18 + 0 + 0 + 4 + 0 + 0 = 22
Haili vessel (manned Torp) 20 0 0 0 0 0 20
Yuan vessel (manned Torp) 20 0 0 0 0 0 20


Patrol Forces
Patrol Boat (PB) : 15 + 0 + 0 + 0 + 0 + 0 = 15
Torpedoboat (TB) : 35 + 0 + 0 + 0 + 0 + 0 = 35
E-Boat (EB) : 46 + 0 + 0 + 0 + 0 + 0 = 46
Patrol Torpedo Boat (PT) : 21 + 0 + 0 + 0 + 0 + 0 = 21
River Patrol Boat (RPB) : 53 + 0 + 0 + 0 + 0 + 0 = 53
Fisherman Protection Vessel (FPV) : 10 + 0 + 5 + 3 + 0 + 0 = 18


Harbour Forces
Harbour Defense Vessel (HDV) : 20 + 0 + 0 + 0 + 0 + 0 = 20
Armoured Fleet Tug (AFT) : 6 + 0 + 0 + 0 + 0 + 0 = 6
Armoured Harbour Tug (AHT) : 20 + 0 + 0 + 0 + 0 + 0 = 20
Net Layer (NL) 0 0 0 1 0 0 1


Fleet Train:
Fleet Tender (FT) : 7 + 0 + 1 + 0 + 0 + 0 = 8
Fleet Supply Ship (FS) : 7 + 0 + 0 + 0 + 0 + 0 = 7
Fleet Oiler (FO) : 3 + 0 + 0 + 0 + 0 + 0 = 3
Auxiliary Ship (AS) : 8 + 0 + 0 + 0 + 1 + 0 = 9
Hospital Ship (HS) : 2 + 0 + 0 + 0 + 2 + 0 = 4
Light Ship (LS) : 1 + 0 + 2 + 0 + 0 + 0 = 3
Armoured Buoy Tender (ABT) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Repair Ship (RS) : 1 + 0 + 0 + 0 + 0 + 0 = 1
Crane Ship (CS) : 1 + 0 + 0 + 0 + 0 + 0 = 1
Air Salvage Ship (ASS) : 1 + 0 + 2 + 0 + 0 + 0 = 3
Salvage Lighter (SL) : 6 + 0 + 0 + 0 + 0 + 0 = 6
Research Vessel (RV) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Training Ship (TS) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Submarine Rescue Vessel (SRV) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Armed Merchantman (AM) : 12 + 0 + 0 + 0 + 0 + 0 = 12
Icebreaker (IB) 0 0 0 2 0 0 2
Royal Yacht (CY) : 1 + 0 + 0 + 0 + 0 + 0 = 1