You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, September 15th 2017, 1:51pm

Chinese Naval Developments – Q4/1947



A. Industiral Allocation

9/11 factories (non-fixed) to naval materials: 9000 tons created for Q4/1947
2/11 factories (fixed) to infrastructure materials: 0.2 pts created for Q4/1947

Stockpile after Q3/1947: 1472 tons

used for Transaction: 0 tons
received from others: 0 tons

warmaterial recycling: 0 tons (first quarter)
warmaterial recycling: 0 tons (second quarter)


Summary:
9000 tons (manufactured) + 1472 tons (stockpiled) + 0 tons (recycled) - 0 tons (transaction) + 0tons (received) = 10472 tons

used at Tianjin: 3334 tons
used at Shanghai: 802 tons
used at Zhanjiang: 1004 tons
used at Kao-hsiung: 524 tons
used at Taipei: 1904 tons
used at Mako: 457 tons
used at Dairen: 314 tons
used for small vessels: 0 tons

Stockpile after Q4/1947: 2133 tons


B. Infrastructure Development

C. Naval Construction
Built Type 0 Slip at Mako 0.4 pts needed; 0.2 pts. Received


Bohai Shipbuilding at Tianjin:
S2 - #1: not in use
S1 - #1: U-107 ; Guiyu-Class; 1504tons needed; 500tons received
S1 - #2: U-108 ; Guiyu-Class; 1504tons needed; 500tons received
S0 - #1: HICMS Hai Ou-7; 511tons needed; 255tons received
S0 - #2: HICMS Hai Ou-8; 511tons needed; 255tons received
S0 - #3: HICMS Hai Ou-9; 511tons needed; 255tons received
S0 - #4: HICMS Hai Ou-10; 511tons needed; 255tons received
D2 - #1: U-109 ; Guiyu-Class; 1504tons needed; 500tons received
D1 - #1: U-110 ; Guiyu-Class; 1504tons needed; 500tons received
D0 - #2: not in use


Freefloating / in completation:
Xia-Class (reserved name "Yaofeng"); 314tons needed; 314tons received; finished start trials


Kiangnan Dock & Engineering Works at Shanghai:
S2 - #1: not in use
S1 - #1: HICMS Houbei-1; 1158tons needed; 300tons received
S0 - #1: HICMS Linchong-2; 451tons needed; 251tons received
S0 - #2: HICMS Linchong-3; 451tons needed; 251tons received
D4 - #1: not in use
D2 - #1: not in use


Freefloating / in completation:



Hudong-Zhonghua Shipbuilding at Zhanjiang:
S1 - #1: HICMS Houbei-2; 1158tons needed; 300tons received
S0 - #1: HICMS Luhai-9; 202tons needed; 202tons received; finished start trials
S0 - #2: HICMS Luhai-10; 202tons needed; 202tons received; finished start trials
D1 - #1: HICMS Houbei-3; 1158tons needed; 300tons received


Freefloating / in completation:



Waigaoqiao Shipbuilding at Kaoshiung:
D0 - #1: HICMS China – 2; 462tons needed; 262tons received
D0 - #2: HICMS China – 3; 462tons needed; 262tons received
D1 - #1: not in use

Freefloating / in completation:



Quindao Beihai Shipbuilding at Taipei:
S0 - #1: HICMS Luhai-7; 202tons needed; 202tons received; finished start trials
S0 - #2: HICMS Luhai-8; 202tons needed; 202tons received; finished start trials
D2 - #1: not in use
D3 - #1: Refit BC Liu Xing; 1500tons needed; 1500tons received; finished start trials


Freefloating / in completation:


Sun Yat Sen Shipbuilding at Mako:
S0 - #1: HICMS Luhai-6; 202tons needed; 202tons received; finished start trials
S0 - #2: HICMS Hai Ou-6; 511tons needed; 255tons received
S0 - #3; building
D0 - #1: not in use

Freefloating / in completation:


Zjiangjin Shipbuilding at Dairen:
D0 - #1: not in use
D1 - #1: not in use
D2 - #1: not in use


Freefloating / in completation:
Xia-Class (reserved name "Suhitou"); 314tons needed; 314tons received; finished start trials


D. Transactions
Export: 0 tons


Import: 0 tons


Conversion:


E. Other Notes
stored guns:


F. Small vessels
Small vessels built by factories:


Small vessels built in drydocks:


G. Shakedown cruises
small trials = 3 month:

great trials (ships over 500tons) = 6 month:
start trials:
CL Suhitou
CL Yaofeng
HICMS Luhai-6
HICMS Luhai-7
HICMS Luhai-8
HICMS Luhai-9
HICMS Luhai-10
BC Liu Xing

in trials:
BC Tai-Pei

finished trials:
HICMS Huangfen 622
HICMS Huangfen 623
HICMS Huangfen 624
HICMS Huangfen 625

taken in service:
HICMRV Nanjizhou

##################################
Hope there is no fault ... OOB is in work
##################################

2

Friday, September 15th 2017, 2:00pm

OOB Q4/1947


3

Friday, September 15th 2017, 2:01pm

OOB Q4/1947 (Textform)

Imperial Chinese Navy - Summary of Ship Type and Status, December 1947


Type : In Service + Reserve + Trials + Building + Refitting + "Purchased (not delivered)" = Total

Capital Ships
Battlecruiser (BC) : 2 + 0 + 2 + 0 + 0 + 0 = 4


Aviation Ships
Carrier (CV) : 8 + 0 + 0 + 0 + 0 + 0 = 8
Seaplane Carrier (CVS) : 8 + 0 + 0 + 0 + 0 + 0 = 8


Heavy Cruiser
Heavy Cruiser (CA) : 6 + 0 + 0 + 0 + 0 + 0 = 6
Armoured Cruiser (CA) : 0 + 1 + 0 + 0 + 0 + 0 = 1


Convoy Cruiser
Light Cruiser (CL) : 15 + 3 + 0 + 0 + 0 + 0 = 18
Escort Cruiser (CE) : 10 + 2 + 2 + 0 + 0 + 0 = 14
Protected Cruiser (PC) : 0 + 0 + 0 + 0 + 0 + 0 = 0


Coast-Defence Armourclad
Coastal Defense Ship (CDS) : 4 + 0 + 0 + 0 + 0 + 0 = 4


Escorts
Destroyer Leader (DDL) : 10 + 0 + 0 + 0 + 0 + 0 = 10
Destroyer (DD) : 35 + 0 + 0 + 0 + 0 + 0 = 35
Frigates (FR) : 19 + 0 + 0 + 0 + 0 + 0 = 19
Destroyer Escort (DE) : 35 + 0 + 0 + 5 + 0 + 0 = 40


Mine Warfare
Mine Warfare Ship (MWS) : 24 + 0 + 0 + 0 + 0 + 0 = 24


Amphibious Warfare
Amphibious Vessel (AV) : 21 + 0 + 0 + 0 + 0 + 0 = 21
Landing Craft Personal (LCVP) : 64 + 0 + 0 + 0 + 0 + 0 = 64


Submarine Forces
Training Submarine : 5 + 1 + 0 + 0 + 0 + 0 = 6
Coastal Submarine (SSC) : 38 + 0 + 0 + 0 + 0 + 0 = 38
Fleet Submarine (SSF) : 12 + 0 + 0 + 0 + 0 + 0 = 12
Ocean Submarine (SSO) : 18 + 0 + 0 + 4 + 0 + 0 = 22
Haili vessel (manned Torp) : 20 + 0 + 0 + 0 + 0 + 0 = 20
Yuan vessel (manned Torp) : 20 + 0 + 0 + 0 + 0 + 0 = 20


Patrol Forces
Patrol Boat (PB) : 15 + 0 + 0 + 0 + 0 + 0 = 15
Torpedoboat (TB) : 31 + 0 + 4 + 0 + 0 + 0 = 35
E-Boat (EB) : 46 + 0 + 0 + 0 + 0 + 0 = 46
Patrol Torpedo Boat (PT) : 21 + 0 + 0 + 0 + 0 + 0 = 21
River Patrol Boat (RPB) : 53 + 0 + 0 + 0 + 0 + 0 = 53
Fisherman Protection Vessel (FPV) : 10 + 0 + 5 + 3 + 0 + 0 = 18


Harbour Forces
Harbour Defense Vessel (HDV) : 20 + 0 + 0 + 0 + 0 + 0 = 20
Armoured Fleet Tug (AFT) : 6 + 0 + 0 + 0 + 0 + 0 = 6
Armoured Harbour Tug (AHT) : 20 + 0 + 0 + 0 + 0 + 0 = 20



Fleet Train:
Fleet Tender (FT) : 7 + 0 + 0 + 0 + 0 + 0 = 7
Fleet Supply Ship (FS) : 7 + 0 + 0 + 0 + 0 + 0 = 7
Fleet Oiler (FO) : 3 + 0 + 0 + 0 + 0 + 0 = 3
Auxiliary Ship (AS) : 8 + 0 + 0 + 0 + 0 + 0 = 8
Hospital Ship (HS) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Light Ship (LS) : 1 + 0 + 0 + 2 + 0 + 0 = 3
Armoured Buoy Tender (ABT) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Repair Ship (RS) : 1 + 0 + 0 + 0 + 0 + 0 = 1
Crane Ship (CS) : 1 + 0 + 0 + 0 + 0 + 0 = 1
Air Salvage Ship (ASS) : 1 + 0 + 0 + 2 + 0 + 0 = 3
Salvage Lighter (SL) : 6 + 0 + 0 + 0 + 0 + 0 = 6
Research Vessel (RV) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Training Ship (TS) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Submarine Rescue Vessel (SRV) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Armed Merchantman (AM) : 12 + 0 + 0 + 0 + 0 + 0 = 12
Royal Yacht (CY) : 1 + 0 + 0 + 0 + 0 + 0 = 1