You are not logged in.

1

Wednesday, August 23rd 2017, 4:16pm

Chinese Naval Developments – Q3/1947



A. Industiral Allocation

9/11 factories (non-fixed) to naval materials: 9000 tons created for Q3/1947
2/11 factories (fixed) to infrastructure materials: 0.2 pts created for Q3/1947

Stockpile after Q2/1947: 1074 tons

used for Transaction: 0 tons
received from others: 0 tons

warmaterial recycling: 0 tons (first quarter)
warmaterial recycling: 0 tons (second quarter)


Summary:
9000 tons (manufactured) + 1074 tons (stockpiled) + 0 tons (recycled) - 0 tons (transaction) + 0tons (received) = 10074 tons

used at Tianjin: 3500 tons
used at Shanghai: 1000 tons
used at Zhanjiang: 404 tons
used at Kao-hsiung: 0 tons
used at Taipei: 1996 tons
used at Mako: 202 tons
used at Dairen: 1500 tons
used for small vessels: 0 tons

Stockpile after Q3/1947: 1472 tons


B. Infrastructure Development

C. Naval Construction
Built Type 0 Slip at Mako 0.1 pts needed; 0.1 pts. Received; finished
Built Type 0 Slip at Mako 0.5 pts needed; 0.1 pts. Received


Bohai Shipbuilding at Tianjin:
S2 - #1: not in use
S1 - #1: U-107 ; Guiyu-Class; 2004tons needed; 500tons received
S1 - #2: U-108 ; Guiyu-Class; 2004tons needed; 500tons received
S0 - #1: not in use
S0 - #2: not in use
S0 - #3: not in use
S0 - #4: not in use
D2 - #1: U-109 ; Guiyu-Class; 2004tons needed; 500tons received
D1 - #1: U-110 ; Guiyu-Class; 2004tons needed; 500tons received
D0 - #2: not in use


Freefloating / in completation:
Xia-Class (reserved name "Yaofeng"); 1814tons needed; 1500tons received


Kiangnan Dock & Engineering Works at Shanghai:
S2 - #1: not in use
S1 - #1: not in use
S0 - #1: not in use
S0 - #2: not in use
D4 - #1: Refit BC Tai-Pei; 1000tons needed; 1000tons received; finished start trials
D2 - #1: not in use


Freefloating / in completation:



Hudong-Zhonghua Shipbuilding at Zhanjiang:
S1 - #1: not in use
S0 - #1: HICMS Luhai-9; 404tons needed; 202tons received
S0 - #2: HICMS Luhai-10; 404tons needed; 202tons received
D1 - #1: not in use


Freefloating / in completation:



Waigaoqiao Shipbuilding at Kaoshiung:
D0 - #1: not in use
D0 - #2: not in use
D1 - #1: not in use

Freefloating / in completation:



Quindao Beihai Shipbuilding at Taipei:
S0 - #1: HICMS Luhai-7; 404tons needed; 202tons received
S0 - #2: HICMS Luhai-8; 404tons needed; 202tons received
D2 - #1: not in use
D3 - #1: Refit BC Liu Xing; 3092tons needed; 1592tons received


Freefloating / in completation:


Sun Yat Sen Shipbuilding at Mako:
S0 - #1: HICMS Luhai-6; 404tons needed; 202tons received
S0 - #2: finished
S0 - #3; building
D0 - #1: not in use

Freefloating / in completation:


Zjiangjin Shipbuilding at Dairen:
D0 - #1: not in use
D1 - #1: not in use
D2 - #1: not in use


Freefloating / in completation:
Xia-Class (reserved name "Suhitou"); 1814tons needed; 1500tons received


D. Transactions
Export: 0 tons


Import: 0 tons


Conversion:


E. Other Notes
stored guns:


F. Small vessels
Small vessels built by factories:


Small vessels built in drydocks:


G. Shakedown cruises
small trials = 3 month:

great trials (ships over 500tons) = 6 month:
start trials:
HICMS Tai-Pei

in trials:
HICMS Huangfen 622
HICMS Huangfen 623
HICMS Huangfen 624
HICMS Huangfen 625

finished trials:
HICMRV Nanjizhou

taken in service:
U-118
U-119
U-120
HICMS Huangfen 620
HICMS Huangfen 621
HICMS Kuang Hua-01
HICMS Kuang Hua-02

##################################
Hope there is no fault ... OOB is in work
##################################

2

Wednesday, August 23rd 2017, 4:36pm

OOB Q3/1947


3

Wednesday, August 23rd 2017, 5:34pm

RE: OOB Q3/1947


Uh... I hate to say this, since the chart looks so nice and neat (which I approve of highly)...

But in light of the recent disasters of image-hosting, can you please post that list in text form, just in case the image host disappears or changes their terms of service? You can keep the image itself (I like it and it's much more readable than the text) but I just want to make sure there's a backup in case the image disappears.

4

Wednesday, August 23rd 2017, 6:04pm

Imperial Chinese Navy - Summary of Ship Type and Status, September 1947

Imperial Chinese Navy - Summary of Ship Type and Status, September 1947


Type : In Service + Reserve + Trials + Building + Refitting + Purchased (not delivered) = Total

Capital Ships
Battlecruiser (BC) : 2 + 0 + 1 + 0 + 1 + 0 = 4


Aviation Ships
Carrier (CV) : 7 + 0 + 0 + 0 + 0 + 1 = 8
Seaplane Carrier (CVS) : 8 + 0 + 0 + 0 + 0 + 0 = 8


Heavy Cruiser
Heavy Cruiser (CA) : 6 + 0 + 0 + 0 + 0 + 0 = 6
Armoured Cruiser (CA) : 0 + 1 + 0 + 0 + 0 + 0 = 1


Convoy Cruiser
Light Cruiser (CL) : 15 + 3 + 0 + 0 + 0 + 0 = 18
Escort Cruiser (CE) : 10 + 2 + 0 + 2 + 0 + 0 = 14
Protected Cruiser (PC) : 0 + 0 + 0 + 0 + 0 + 0 = 0


Coast-Defence Armourclad
Coastal Defense Ship (CDS) : 4 + 0 + 0 + 0 + 0 + 0 = 4


Escorts
Destroyer Leader (DDL) : 10 + 0 + 0 + 0 + 0 + 0 = 10
Destroyer (DD) : 35 + 0 + 0 + 0 + 0 + 0 = 35
Frigates (FR) : 19 + 0 + 0 + 0 + 0 + 0 = 19
Destroyer Escort (DE) : 35 + 0 + 0 + 0 + 0 + 0 = 35


Mine Warfare
Mine Warfare Ship (MWS) : 24 + 0 + 0 + 0 + 0 + 0 = 24


Amphibious Warfare
Amphibious Vessel (AV) : 21 + 0 + 0 + 0 + 0 + 0 = 21
Landing Craft Personal (LCVP) : 64 + 0 + 0 + 0 + 0 + 0 = 64


Submarine Forces
Training Submarine : 5 + 1 + 0 + 0 + 0 + 0 = 6
Coastal Submarine (SSC) : 38 + 0 + 0 + 0 + 0 + 0 = 38
Fleet Submarine (SSF) : 12 + 0 + 0 + 0 + 0 + 0 = 12
Ocean Submarine (SSO) : 18 + 0 + 0 + 4 + 0 + 0 = 22
Haili vessel (manned Torp) : 20 + 0 + 0 + 0 + 0 + 0 = 20
Yuan vessel (manned Torp) : 20 + 0 + 0 + 0 + 0 + 0 = 20


Patrol Forces
Patrol Boat (PB) : 15 + 0 + 0 + 0 + 0 + 0 = 15
Torpedoboat (TB) : 31 + 0 + 4 + 0 + 0 + 0 = 35
E-Boat (EB) : 46 + 0 + 0 + 0 + 0 + 0 = 46
Patrol Torpedo Boat (PT) : 21 + 0 + 0 + 0 + 0 + 0 = 21
River Patrol Boat (RPB) : 53 + 0 + 0 + 0 + 0 + 0 = 53
Fisherman Protection Vessel (FPV) : 10 + 0 + 0 + 5 + 0 + 0 = 15


Harbour Forces
Harbour Defense Vessel (HDV) : 20 + 0 + 0 + 0 + 0 + 0 = 20
Armoured Fleet Tug (AFT) : 6 + 0 + 0 + 0 + 0 + 0 = 6
Armoured Harbour Tug (AHT) : 20 + 0 + 0 + 0 + 0 + 0 = 20



Fleet Train
Fleet Tender (FT) : 7 + 0 + 0 + 0 + 0 + 0 = 7
Fleet Supply Ship (FS) : 7 + 0 + 0 + 0 + 0 + 0 = 7
Fleet Oiler (FO) : 3 + 0 + 0 + 0 + 0 + 0 = 3
Auxiliary Ship (AS) : 8 + 0 + 0 + 0 + 0 + 0 = 8
Hospital Ship (HS) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Light Ship (LS) : 1 + 0 + 0 + 0 + 0 + 0 = 1
Armoured Buoy Tender (ABT) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Repair Ship (RS) : 1 + 0 + 0 + 0 + 0 + 0 = 1
Crane Ship (CS) : 1 + 0 + 0 + 0 + 0 + 0 = 1
Air Salvage Ship (ASS) : 1 + 0 + 0 + 0 + 0 + 0 = 1
Salvage Lighter (SL) : 6 + 0 + 0 + 0 + 0 + 0 = 6
Research Vessel (RV) : 1 + 0 + 1 + 0 + 0 + 0 = 2
Training Ship (TS) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Submarine Rescue Vessel (SRV) : 2 + 0 + 0 + 0 + 0 + 0 = 2
Armed Merchantman (AM) : 12 + 0 + 0 + 0 + 0 + 0 = 12
Royal Yacht (CY) : 1 + 0 + 0 + 0 + 0 + 0 = 1



Your wish is my command ;)

5

Wednesday, August 23rd 2017, 6:51pm

Vielen Dank! / Merci beaucoup! / Fēicháng gǎnxiè!

:)