Report for Q1/1947
Industrial Allocation
- 23.5 / 27.5 factories producing 23,500t materials.
- 4/27.5 factories producing infrastructure (dedicated)
- 14,336t from stockpile.
- 0t from transactions.
- 0t from scrapping.
- 37,836t materials total.
- 27,619t used.
- 10,217t stored for Q2/47.
Infrastructure Development
Four factories dedicated to producing infrastructure; 0.4 IP created. All 0.4 IP used to begin lengthening Type 4.5 slip in La Rochelle to Type 5 slip. 0.1 IP remaining until project completion.
Naval Construction
DCNS / Arsenal de La Rochelle (Cl 5)
Class 4.5 Slip #1 - Expanding to Type 5 slip. 0.5 IP required. 0.4 IP added Q1/1947. 0.1 IP remaining until completion.
Class 4 Slip #1 - Idle.
Class 3 Slip #1 - Light cruiser
Latouche-Tréville laid down January 1st, 1947. 8600 tons required. 2000 tons added in Q1/1947 for a total of 2000 / 8600 tons. 6600 / 8600 tons remaining. Launched November 1947. Completed June 8th, 1948.
Class 3 Slip #2 - Light cruiser
Lafayette laid down January 1st, 1947. 8600 tons required. 2000 tons added in Q1/1947 for a total of 2000 / 8600 tons. 6600 / 8600 tons remaining. Launched November 1947. Completed June 8th, 1948.
Class 3 Slip #3 - Contre-Torpillieur
La Grandière (
Forbin class) laid down September 1st, 1946. 2,500 tons required. 625 tons added in Q1/1947 for a total of 1460 / 2500 tons. 1040 / 2500 tons remaining. Launched July 28th, 1947. Completed August 15th, 1947.
Class 3 Slip #4 - Contre-Torpillieur
Savorgnan de Brazza (
Forbin class) laid down March 1st, 1947. 2,500 tons required. 210 tons added in Q1/1947 for a total of 210 / 2500 tons. 2290 / 2500 tons remaining. Launched July 19th, 1947. Completed February 15th, 1948.
Class 2 Slip #1 - Contre-Torpillieur
D'Iberville (
Forbin class) laid down November 1st, 1946. 2,500 tons required. 625 tons added in Q1/1947 for a total of 1250 / 2500 tons. 1250 / 2500 tons remaining. Launched March 19th, 1947. Completed October 15th, 1947.
Class 2 Slip #2 - Contre-Torpillieur
Rigault de Genouilly (
Forbin class) laid down January 1st, 1947. 2,500 tons required. 625 tons added in Q1/1947 for a total of 625 / 2500 tons. 1875 / 2500 tons remaining. Launched May 19th, 1947. Completed December 15th, 1947.
Class 1 Slip #1 - Idle.
Class 1 Slip #2 - Idle.
Class 1 Slip #3 - Idle.
Class 1 Slip #4 - Idle.
Class 0 Slip #1 - Water tender
Drosse laid down January 1st, 1947. 151 tons required (built to civilian standards). 100 tons added in Q1/1947 for a total of 100 / 151 tons. 51 / 151 tons remaining. Launched April 26th, 1947. Completed October 18th, 1947.
Class 0 Slip #2 - Idle.
Class 0 Slip #3 - Idle.
Class 0 Slip #4 - Idle.
Dockside:
- Aircraft carrier
Foudroyant laid down January 1st, 1945. 38,800 tons required. 3000 tons added in Q1/1947 for a total of 23000 / 38800 tons. 15800 / 38800 tons remaining. Launched September 18th, 1946. Completed December 25th, 1948.
- Contre-Torpillieur
La Gravière (
Forbin class) laid down March 1st, 1946. 2,500 tons required. 415 tons added in Q1/1947 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched July 19th, 1946. Completed February 15th, 1947.
- Contre-Torpillieur
Dumont d'Urville (
Forbin class) laid down May 1st, 1946. 2,500 tons required. 625 tons added in Q1/1947 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched September 19th, 1946. Completed April 15th, 1947.
- Contre-Torpillieur
D'Entrecasteaux (
Forbin class) laid down July 1st, 1946. 2,500 tons required. 625 tons added in Q1/1947 for a total of 1875 / 2500 tons. 625 / 2500 tons remaining. Launched November 19th, 1946. Completed June 15th, 1947.
- Escorteur rapide
L'Agenais laid down July 1st, 1946. 1,185 tons required. 350 tons added in Q1/1947 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched November 3rd, 1946. Completed May 6th, 1947.
- Escorteur rapide
L'Costalorien laid down July 1st, 1946. 1,185 tons required. 350 tons added in Q1/1947 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched November 3rd, 1946. Completed May 6th, 1947.
- Escorteur rapide
Le Avignonnais laid down July 1st, 1946. 1,185 tons required. 350 tons added in Q1/1947 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched November 3rd, 1946. Completed May 6th, 1947.
- Escorteur rapide
Le Yvelinois laid down July 1st, 1946. 1,185 tons required. 350 tons added in Q1/1947 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched November 3rd, 1946. Completed May 6th, 1947.
DCNS Brest (Cl 5)
Class 3 Drydock #1 - Idle.
Class 2 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Torpedo boat
La Combattante undergoes partial reconstruction. 39 tons required. 39 tons added in Q1/1947 for a total of 39 / 39 tons. 0 / 39 tons remaining. Refit completes March 1st, 1947.
Dockside:
N/A
Société Nouvelle des Forges et Chantiers de la Méditerranée, Marseilles (Cl 5)
Class 4.5 Drydock #1 - Aircraft carrier
Formidable laid down October 1st, 1945. 38,800 tons required. 3000 tons added in Q1/1947 for a total of 18000 / 38800 tons. 20800 / 38800 tons remaining. Launched June 18th, 1947. Completed September 25th, 1949.
Class 3 Slip #1 - Heavy cruiser
Amiral Charner laid down January 1st, 1947. 16584 tons required. 2500 tons added in Q1/1947 for a total of 2500 / 16584 tons. 14084 / 16584 tons remaining. Launched November 1947. Completed February 30th, 1949.
Class 3 Slip #2 - Heavy cruiser
Duguay-Trouin laid down January 1st, 1947. 16584 tons required. 2500 tons added in Q1/1947 for a total of 2500 / 16584 tons. 14084 / 16584 tons remaining. Launched November 1947. Completed February 30th, 1949.
Class 2 Drydock #1 - Idle.
Class 1 Slip #1 - Idle.
Class 1 Slip #2 - Idle.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Dockside:
- Heavy cruiser
Marseillaise laid down January 1st, 1946. 16584 tons required. 2500 tons added in Q1/1947 for a total of 12500 / 16584 tons. 4084 / 16584 tons remaining. Launched November 1946. Completed February 30th, 1948.
- Heavy cruiser
Suffren laid down January 1st, 1946. 16584 tons required. 2500 tons added in Q1/1947 for a total of 12500 / 16584 tons. 4084 / 16584 tons remaining. Launched November 1946. Completed February 30th, 1948.
Arsenal de Cayenne (Cl 5)
Class 3 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Arsenal de Abidjan (Cl 5)
Class 3 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Arsenal de Oran (Cl 5)
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Arsenal de Tunis (Cl 5)
Class 4 Drydock #1 - Idle.
Class 3 Slip #1 - Replenishment ship
Le Vestale laid down January 1st, 1947. 2418 tons required (built to civilian standards). 750 tons added in Q1/1947 for a total of 750 / 2418 tons. 1668 / 2418 tons remaining. Launched August 15th, 1947. Completed October 21st, 1948.
Class 1 drydock #1 - Idle.
Société Nouvelle des Forges et Chantiers de la Méditerranée, Beiruit (Cl 5)
Class 3 Drydock #1 - Idle.
Arsenal de Djibouti (Cl 2)
Class 2 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 1 Drydock #2 - Idle.
Base Navale, Dakar
Class 1 Floating Drydock #1 - Idle.
Forges et Chantiers de Indochine, Saigon (Cl 5)
Class 4 Drydock #1 - Idle.
Class 1 Drydock #1 - Replenishment ship
Than Tien laid down January 1st, 1947. 625 tons required (built to civilian standards). 250 tons added in Q1/1947 for a total of 250 / 625 tons. 375 / 625 tons remaining. Launched August 15th, 1947. Completed October 21st, 1948.
Class 0 Drydock #1 - Idle.
Class 0 Slip #1 - Aviso
Ngoc Hoi (
Arabe class) laid down for Indochinese Naval Patrol on January 1st, 1947. 634 tons required. 190 tons added in Q1/1947 for a total of 190 / 634 tons. 444 / 634 tons remaining. Launched May 19th, 1947. Completed December 15th, 1947.
Class 0 Slip #2 - Aviso
Bach Dang (
Arabe class) laid down for Indochinese Naval Patrol on January 1st, 1947. 634 tons required. 190 tons added in Q1/1947 for a total of 190 / 634 tons. 444 / 634 tons remaining. Launched April 27th, 1947. Completed September 19th, 1947.
Dockside:
- Naval Base Ship
Long Dao laid down for Indochinese Naval Patrol on July 1st, 1946. 765 tons required. 250 tons added Q1/1947 for a total of 750 / 765. 15 / 765 tons remaining until completion. Launched Q4/1946. Completed early Q2/1947.
Forges et Chantiers de Indochine, Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Idle.
Forges et Chantiers de Nouvelle-Calédonie (Cl 5)
Class 4 Drydock #1 - Idle.
Class 2 Drydock #1 - Idle.
Class 1.5 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Class 1 Slip #1 - Idle.
Class 0 Slip #1 - Idle.
Class 0 Slip #2 - Idle.
Class 0 Slip #3 - Idle.
Dockside:
- Aviso
Tay Cay (
Arabe class) laid down for Indochinese Naval Patrol on July 1st, 1946. 634 tons required. 190 tons added in Q1/1947 for a total of 570 / 634 tons. 64 / 634 tons remaining. Launched November 27th, 1946. Completed April 19th, 1947.
- Aviso
Can Don (
Arabe class) laid down for Indochinese Naval Patrol on July 1st, 1946. 634 tons required. 190 tons added in Q1/1947 for a total of 570 / 634 tons. 64 / 634 tons remaining. Launched November 27th, 1946. Completed April 19th, 1947.
At Papeete (Cl 3)
Class 3.5 Drydock - Idle.
Dockside:
- None
On Trials:
- Heavy cruiser
Saint Louis (until Q2/1947)
- Destroyer
de Sercey (until Q1/1947)
- Destroyer
Allemand (until Q2/1947)
- Destroyer
Cosmao (until Q2/1947)
- Destroyer
La Gravière (until Q3/1947)
- Escortier rapide
Le Dieppois (until Q2/1947)
- Escortier rapide
Le Champenois (until Q2/1947)
- Escortier rapide
Le Indrien (until Q2/1947)
- Escortier rapide
L'Calvadosien (until Q2/1947)
- Aviso
Tonkinois (until Q2/1947)
- Aviso
Touareg (until Q2/1947)
- Frigate
Trieu Thi Trinh (until Q2/1947)
- Torpedo boat
La Combattante (until Q1/1947)
From Factories
La Combattante IIb type motor torpedo boats
Ypres and
Toul laid down January 1st, 1947; launched complete on February 1st, 1947. 160 tons added to each (320t total).
Transactions
None.
Other Notes
Experimental torpedo boat
La Combattante is refitted with gas turbine engines as a test concept.
Ships being scrapped
None, at present.
- Total tonnage in recycling until Q3/1947: (1x715) = 715
- Total tonnage in recycling until Q4/1947: (1x715) = 715
Updated Order of Battle, End of Q1/1947
Note: X(Y)+Z = completed (under repair/refit) + under construction - scrapping
The Fleet
Battleships: 7(0)+0
Battlecruisers: 4(0)+0
Aircraft Carriers: 12(0)+2
Heavy Cruisers: 10(0)+4
Light Cruisers: 26(0)+2
Coast Defense Ships: 1(0)+0
Destroyers: 97(0)+6
Frigates: 4(0)+0
Corvettes: 10(0)+0
Escorteurs Rapides: 20(0)+4
Avisos: 16(0)+0
Fleet Submarines: 38(0)+0
Coastal Submarines: 55(0)+0
Motor Torpedo Boats: 38(0)+0
Motor Torpedo Boat Experimental: 1(0)+0
Patrouilleurs: 16(0)+0
Submarine Chasers: 100(0)+0
Light Patrol Boats: 8(0)+0
Vedettes: 8(0)+0
Minesweepers: 26(0)+0
Fleet Train
Replenishment Ships: 20(0)+1
Light Oiler Tankers: 7(0)+0
Gasoline Tankers: 3(0)+0
Oil Transport Tankers: 12(0)+0
Fleet Tenders: 4(0)+0
Submarine Tenders: 1(0)+0
Heavy Repair Ships: 2(0)+0
Light Repair Ships: 4(0)+0
Ammunition Ships: 2(0)+0
Transports: 8(0)+0
Aircraft Transports: 2(0)+0
Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Fleet Tugs: 12(0)+0
Light Harbour Tugs: 4(0)+0
Water Tenders: 0(0)+1
Netlayers: 0(0)+0
Research Ship: 5(0)+0
Research Submarine: 1(0)+0
Amphibious Forces:
Dock Landing Ship: 2(0)+0
Vehicle Landing Ship: 4(0)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 10(0)+0
Infantry Landing Craft Large (EDA-L): 8(0)+0
Tank Landing Craft (EDA): 17(0)+0
Infantry Assault Craft Small (EA): 33(0)+0
Minor Craft:
Bateau de Service: 72(0)+0
Patrouilleur de Port: 54(0)+0
Hydroglisseurs: 32(0)+0
Patrouille Navale Indochinoise:
Frigates: 2(0)+0
Avisos: 4(0)+4
Minesweepers: 16(0)+0
Survey Craft: 1(0)+0
Civil Support Ships: 1(0)+0
River Gunboats: 34(0)+0
Tank Landing Craft (EDA): 8(0)+0
Infantry Assault Craft (EA): 8(0)+0
Submarine Chasers: 55(0)+0
Motor Torpedo Boats: 8(0)+0
Vedettes: 24(0)+0
Replenishment Ships: 0(0)+1
Base Ships: 0(0)+1
Light Patrol Boats: 4(0)+0
Bateau de Service: 12(0)+0
Patrouilleur de Port: 4(0)+0
Royal Cambodian Navy:
Motor Torpedo Boats: 4(0)+0
Patrol Craft: 2(0)+0
Sea Trucks: 4(0)+0
River Patrol Boats: 16(0)+0
Harbor Minesweepers: 4(0)+0
Tugboats: 1(0)+0