You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, May 30th 2016, 5:51pm

Yugoslavia 3Q47 Sim Report

A. Factories

Factories : 2
Producing Warship Material : 1
Tonnage Produced : 1,000
Producing Infrastructure (Committed) : 1
Producing Infrastructure (Non - Committed) : 0
Infrastructure Points Produced : 0.10
Bonus IP for Committed Factories : 0.00
Total IP Available : 0.10

Tonnage Produced : 1,000
Tonnage Transferred In : 0
Tonnage Received in Payment : 0
Tonnage Reclaimed From Scrap : 0
Tonnage Previously Stockpiled : 1,521
Total Tonnage Available : 2,521
Tonnage Paid : 0
Tonnage Used in Construction : 1,166
Tonnage Remaining for Stockpile : 1,355


B. Infrastructure Development

At Bar: Construction of a Type 1.0 Floating Dry Dock for eventual deployment to Durres: 1.0 IP required, 0.1 IP provided this quarter, total 0.8 IP committed; 0.2 IP remaining

At Belgrade: None


C. Naval Development and Construction

At Bar:

Dock No.1 (Type 2.0): Idle

Dock No.2 (Type 0.0): Idle

Slip No.1 (Type 1.5): Project 1947 Beta - Minelayer B – Laid down 15 July 1947: Requires 1,535 tons, 0 tons previously committed; receives 385 tons, 1,150 tons remaining

Slip No.2 (Type 0): Construction of one Project 1946 Delta MTB – 99 tons; complete

Slip No.3 (Type 0): Construction of one Project 1946 Delta MTB – 99 tons; complete


Dockside:

Project 1947 Beta - Minelayer A – Launched 9 June 1947: Requires 1,535 tons, 770 tons previously committed; receives 385 tons, 380 tons remaining

At Belgrade:

Dock No.1 (Type 0): Idle

Slip No.1 (Type 0): Idle


At Durres:

None


Small Craft Construction

Two Project 1946 Delta MTB from Factories – total 198 tons


D. Transactions

None


E. Refits

None


Ships Laid Down This Quarter

At Bar:

Project 1947 Beta - Minelayer B
Two Project 1946 Delta MTB

At Belgrade:

None


Ships Launched This Quarter

At Bar:

None


At Belgrade:

None


Ships Completed This Quarter

At Bar:

Two Project 1946 Delta MTB plus two Project 1946 Delta MTB from factories – total four this quarter


At Belgrade:

None


Ships Undergoing Trials

None

Ships Completing Trials

Fleet Tender Ivan Visin


F. Scrappage Report

None this quarter


Order of Battle of the Royal Yugoslav Navy, September 1947

Type : In Service + Trials + Building + Refitting = Total
Light Cruisers : 4 + 0 + 0 + 0 = 4
Destroyer Leaders : 3 + 0 + 0 + 0 = 3
Destroyers : 8 + 0 + 0 + 0 = 8
Light Destroyers : 4 + 0 + 0 + 0 = 4
Escort Sloops : 8 + 0 + 0 + 0 = 8
Corvettes : 8 + 0 + 0 + 0 = 8
Submarines : 3 + 0 + 0 + 0 = 3
Armoured Gunboats : 8 + 0 + 0 + 0 = 8
Minelayers : 0 + 0 + 2 + 0 = 2
Minecraft : 12 + 0 + 0 + 0 = 12
Motor Torpedo Boats : 46 + 0 + 0 + 0 = 46
Fleet Tender : 2 + 0 + 0 + 0 = 2
Seaplane Tender : 1 + 0 + 0 + 0 = 1
Netlayers : 4 + 0 + 0 + 0 = 4
Riverine Monitors : 8 + 0 + 0 + 0 = 8