You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, October 14th 2015, 5:44pm

Bulgaria, Q1/1946

Industrial Allocation
- 2/3 factories producing 2000t materials.
- 1/3 factories dedicated to infrastructure.
- 6767 from stockpile.
- 0 tons from transactions.
- 0 tons from scrapping
- 9117t materials total.
- 2350t used.
- 6282t stored for Q2/46.

Infrastructure Development
1 factory dedicated to production of IP. 0.1 IP produced.

Naval Construction

KRZ Flotski Arsenal (Varna):
- Type 2 drydock - Submarines Kheringa, Chiga, and Mryana scrapping end to end. 45 tons recovered from each. Scrapping completed Q1/1946.
- Type 1.5 slip - Destroyer Sileni laid down October 1st, 1945. 2,350 tons required. 700 tons added in Q1/46 for a total of 1400 / 2350. 950 / 2350 tons remaining until completion in Q3/46.
- Type 1.5 slip - Idle.
- Type 1 drydock - Submarine Svoboda laid down October 1st, 1945. 950 tons required. 300 tons added in Q1/46 for a total of 600 / 950. 350 / 950 tons remaining until completion in Q3/46.
- Type 0 slip - Patrol craft KL-01 laid down January 1st, 1946. 250 tons required. 250 tons added in Q1/46 for a total of 250 / 250 tons. 0 / 250 tons remaining until completion. Launched February 27th, 1946. Completed May 8th, 1946.
- Type 2 floating drydock - Leased to Yugoslavia: moved to a Yugoslavian port. Returning 1946.

Dockside:
- Destroyer Svirepni laid down April 1st, 1945. 2,350 tons required. 250 tons added in Q1/46 for a total of 2350 / 2350. 0 / 2350 tons remaining until completion in Q1/46. Launched.
- Submarine Pobeda laid down April 1st, 1945. 950 tons required. 50 tons added in Q1/46 for a total of 950 / 950. 0 / 950 tons remaining until completion in Q1/46. Completed.
- Submarine Revansh laid down July 1st, 1945. 950 tons required. 300 tons added in Q1/46 for a total of 900 / 950. 50 / 950 tons remaining until completion in Q2/46.

Burgas Shipyards Ltd (Burgas):
- Type 0 slip - Patrol craft KL-02 laid down January 1st, 1946. 250 tons required. 250 tons added in Q1/46 for a total of 250 / 250 tons. 0 / 250 tons remaining until completion. Launched February 27th, 1946. Completed May 8th, 1946.
- Type 0 slip - Patrol craft KL-03 laid down January 1st, 1946. 250 tons required. 250 tons added in Q1/46 for a total of 250 / 250 tons. 0 / 250 tons remaining until completion. Launched February 27th, 1946. Completed May 8th, 1946.
- Type 0 slip - Under construction. 0.1 IP added of 0.5 IP required. 0.4 IP remaining until completion.
- Type 0 drydock - Submarine Caiman scrapping. 45 tons recovered. Scrapping completed Q1/1946.

Dockside:
- N/A

Other Expenditures:
- 45 tons for three Type-46 torpedo boats, 45 tons each, for a total of 135 tons.

On Trials
- Destroyer Reshitelni continues builders trials.
- Submarine Slava begins builders trials.

Scrapping
- 4 Uzhilvane-class submarines scrapping. 45 tons recovered from each.

- Total tonnage in recycling until Q4/1946: (4x45) = 180

Other Notes
None

Order of Battle (Royal Bulgarian Navy) end of Q1 1946
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Combatants
Battleships: 1(0)+0
Cruisers: 2(0)+0
Contradestroyers: 4(0)+0
Destroyers: 11(0)+1
Minelayers: 4(0)+0
Patrol Craft: 0(0)+3
River Monitors: 5(0)+0
River Patrol Craft: 5(0)+0
Subchasers: 3(0)+0
Submarines: 9(0)+2-4
Midget Submarines: 2(0)+0
Motor Torpedo Boats: 34(0)+0
Motor Launches: 6(0)+0
Riverine gun/torpedo boats: 80(0)+0
Assault Boats: 16(0)+0

Auxiliaries
Mine sweepers: 6(0)+0
Auxiliaries: 3(0)+0
Netlayers: 3(0)+0
Tugboats: 3(0)+0
Experimental Craft: 1(0)+0
Museum Ships: 1(0)+0