Industrial Allocation
- 0/2 factories producing 0t materials.
- 2/2 factories producing IP.
- 3207 tons from stockpile.
- 0 tons from transactions.
- 0 tons from scrapping.
- 3207 tons materials total.
- 0 tons used.
- 3207 tons stockpiled for Q4/46.
Infrastructure Development
Two factories dedicated to infrastructure. 0.2 IP produced in Q3/1946. 0.2 IP added to Type 1 slip at Rushbrooke (Cobh).
Naval Construction
Gallagher, Burke & Sons, Galway:
Type 1 drydock #1 - Idle.
Type 0 drydock #1 - Idle.
Irish Shipbuilding Company, Rushbrooke Shipyard (Cobh):
Type 1.5 slip #1 - Idle.
Type 1 slip #1: under construction, 0.6 IP of 1.0 IP added.
Haulbowline Naval Yard (Cobh):
1 Type 2.5 drydock #1 - Idle
1 Type 1 drydock #1 - Idle
On Trials:
- Destroyer Niamh running trials until Q4/46.
Notes:
The older Connacht-class destroyers have been placed in reserve.
Order of Battle (Irish Naval Service) as of September 30th, 1946
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction - scrapping.
Cruisers: 1(0)+0
Destroyers: 8(0)+0
Frigates: 7(0)+0
Fishery Patrol Sloops: 4(0)+0
Submarines: 10(0)+0
MGB's: 16(0)+0
MTB's: 16(0)+0
Mine Sweepers: 0(0)+0
Submarine Chasers: 16(0)+0
Motor Lifeboat: 1(0)+0
Landing Craft: 1(0)+0
Auxiliaries: 4(0)+0
Armed Naval Tugs: 2(0)+0
Inter-Commonwealth Lending Program
Totals loaned to date:
- To UK: 4,508 tons
- To Canada: 747 tons + 1,000 tons non-sim purchases.
- To Australia: 680 tons