Report for Q2/1946
Industrial Allocation
- 27.5 / 27.5 factories producing 27,500t materials.
- 0/27.5 factories producing infrastructure
- 2,319t from stockpile.
- 2,379t from transactions.
- 0t from scrapping.
- 32,198t materials total.
- 26,947t used.
- 5,501t stored for Q3/46.
Infrastructure Development
N/A
Naval Construction
DCNS / Arsenal de La Rochelle (Cl 5)
Class 4.5 Slip #1 - Aircraft carrier
Foudroyant laid down January 1st, 1945. 38,800 tons required. 3000 tons added in Q2/1946 for a total of 14000 / 38800 tons. 24800 / 38800 tons remaining. Launched September 18th, 1946. Completed December 25th, 1948.
Class 4 Slip #1 - Idle.
Class 3 Slip #1 - Idle.
Class 3 Slip #2 - Idle.
Class 3 Slip #3 - Idle.
Class 3 Slip #4 - Contre-Torpillieur
Cosmao (
Forbin class) laid down January 1st, 1946. 2,500 tons required. 625 tons added in Q2/1946 for a total of 1250 / 2500 tons. 1250 / 2500 tons remaining. Launched May 19th, 1946. Completed December 15th, 1946.
Class 2 Slip #1 - Contre-Torpillieur
La Gravière (
Forbin class) laid down March 1st, 1946. 2,500 tons required. 625 tons added in Q2/1946 for a total of 835 / 2500 tons. 1665 / 2500 tons remaining. Launched July 19th, 1946. Completed February 15th, 1947.
Class 2 Slip #2 - Contre-Torpillieur
Dumont d'Urville (
Forbin class) laid down May 1st, 1946. 2,500 tons required. 625 tons added in Q2/1946 for a total of 625 / 2500 tons. 1875 / 2500 tons remaining. Launched September 19th, 1946. Completed April 15th, 1947.
Class 1 Slip #1 - Escorteur rapide
Le Dieppois laid down January 1st, 1946. 1,185 tons required. 350 tons added in Q2/1946 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1946. Completed November 6th, 1946.
Class 1 Slip #2 - Escorteur rapide
Le Champenois laid down January 1st, 1946. 1,185 tons required. 350 tons added in Q2/1946 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1946. Completed November 6th, 1946.
Class 1 Slip #3 - Escorteur rapide
Le Indrien laid down January 1st, 1946. 1,185 tons required. 350 tons added in Q2/1946 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1946. Completed November 6th, 1946.
Class 1 Slip #4 - Escorteur rapide
L'Calvadosien laid down January 1st, 1946. 1,185 tons required. 350 tons added in Q2/1946 for a total of 700 / 1185 tons. 485 / 1185 tons remaining. Launched May 3rd, 1946. Completed November 6th, 1946.
Class 0 Slip #1 - Idle.
Class 0 Slip #2 - Idle.
Class 0 Slip #3 - Idle.
Class 0 Slip #4 - Idle.
Dockside:
- Export Battleship
Tapae laid down for Romania January 1st, 1943. 34,448 tons required. 2,379 tons added in Q2/1946 for a total of 33306 / 34448 tons. 1142 / 34448 tons remaining. Launched June, 1944. Completion planned for September 9th, 1946.
- Heavy cruiser
Saint Louis laid down January 1st, 1945. 13,850 tons required. 2000 tons added in Q2/1946 for a total of 9575 / 13850 tons. 4275 / 13850 tons remaining. Launched December, 1945. Completed November 30th, 1946.
- Contre-Torpillieur
Jurien (
Forbin class) laid down May 1st, 1945. 2,500 tons required. 0 tons added in Q2/1946 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched September 19th, 1945. Completed April 15th, 1946.
- Contre-Torpillieur
Tartu (
Forbin class) laid down July 1st, 1945. 2,500 tons required. 625 tons added in Q2/1946 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched November 19th, 1945. Completed June 15th, 1946.
- Contre-Torpillieur
de Sercey (
Forbin class) laid down September 1st, 1945. 2,500 tons required. 625 tons added in Q2/1946 for a total of 2085 / 2500 tons. 415 / 2500 tons remaining. Launched January 19th, 1946. Completed August 15th, 1946.
- Contre-Torpillieur
Allemand (
Forbin class) laid down November 1st, 1945. 2,500 tons required. 625 tons added in Q1/1946 for a total of 1250 / 2500 tons. 1250 / 2500 tons remaining. Launched March 19th, 1946. Completed March 15th, 1946.
- Escorteur rapide
Le Corse laid down July 1st, 1945. 1,185 tons required. 135 tons added in Q2/1946 for a total of 1185 / 1185 tons. 0 / 1185 tons remaining. Launched November 3rd, 1945. Completed May 6th, 1945.
- Escorteur rapide
Le Calaisien laid down July 1st, 1945. 1,185 tons required. 135 tons added in Q2/1946 for a total of 1185 / 1185 tons. 0 / 1185 tons remaining. Launched November 3rd, 1945. Completed May 6th, 1945.
- Escorteur rapide
Le Basque laid down July 1st, 1945. 1,185 tons required. 135 tons added in Q2/1946 for a total of 1185 / 1185 tons. 0 / 1185 tons remaining. Launched November 3rd, 1945. Completed May 6th, 1945.
- Escorteur rapide
Le Dijonnais laid down July 1st, 1945. 1,185 tons required. 135 tons added in Q2/1946 for a total of 1185 / 1185 tons. 0 / 1185 tons remaining. Launched November 3rd, 1945. Completed May 6th, 1945.
- Infantry landing craft
Cavalier laid down January 1st, 1946. 179 tons required. 74 tons added Q2/1946 for a total of 179 / 179 tons. Completed April 1946.
- Infantry landing craft
Janassaire laid down January 1st, 1946. 179 tons required. 74 tons added Q2/1946 for a total of 179 / 179 tons. Completed April 1946.
DCNS Brest (Cl 5)
Class 3 Drydock #1 - Idle.
Class 2 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Dockside:
- Submarine
Grenat (
Emeraude class) laid down July 1st, 1945. 1750 tons required. 0 tons added in Q2/1946 for a total of 1750 / 1750 tons. 0 / 1750 tons remaining. Launched November 9th, 1945. Completed May 23rd, 1946.
- Submarine
Agate (
Emeraude class) laid down July 1st, 1945. 1750 tons required. 0 tons added in Q2/1946 for a total of 1750 / 1750 tons. 0 / 1750 tons remaining. Launched November 9th, 1945. Completed May 23rd, 1946.
- Merchant tanker
Fructidor converting to naval auxiliary. 260 tons added Q2/1946. 260 / 260 tons added. Conversion complete.
Société Nouvelle des Forges et Chantiers de la Méditerranée, Marseilles (Cl 5)
Class 4.5 Drydock #1 - Aircraft carrier
Formidable laid down October 1st, 1945. 38,800 tons required. 3000 tons added in Q1/1946 for a total of 9000 / 38800 tons. 39800 / 38800 tons remaining. Launched June 18th, 1947. Completed September 25th, 1949.
Class 3 Slip #1 - Heavy cruiser
Marseillaise laid down January 1st, 1946. 16584 tons required. 2500 tons added in Q2/1946 for a total of 5000 / 16584 tons. 11584 / 16584 tons remaining. Launched November 1946. Completed February 30th, 1948.
Class 3 Slip #2 - Heavy cruiser
Suffren laid down January 1st, 1946. 16584 tons required. 2500 tons added in Q2/1946 for a total of 5000 / 16584 tons. 11584 / 16584 tons remaining. Launched November 1946. Completed February 30th, 1948.
Class 2 Drydock #1 - Idle.
Class 1 Slip #1 - Idle.
Class 1 Slip #2 - Idle.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Dockside:
- Battleship
Richelieu undergoing major refit beginning July 1st 1945. 8577 tons required. 1137 tons added Q2/1946 for a total of 7200 / 8577 tons. 1377 / 8577 tons remaining until completion. Refit finishes June 1st 1946. No drydock time required.
- Battleship
Courbet undergoing major refit beginning January 1st 1946. 8577 tons required. 2400 tons added Q2/1946 for a total of 4800 / 8577 tons. 3777 / 8577 tons remaining until completion. Refit finishes December 1st 1946. No drydock time required.
- Submarine
Améthyste (
Emeraude class) laid down July 1st, 1945. 1750 tons required. 0 tons added in Q2/1946 for a total of 1750 / 1750 tons. 0 / 1750 tons remaining. Launched November 9th, 1945. Completed May 23rd, 1946.
- Submarine
Obsidienne (
Emeraude class) laid down July 1st, 1945. 1750 tons required. 0 tons added in Q2/1946 for a total of 1750 / 1750 tons. 0 / 1750 tons remaining. Launched November 9th, 1945. Completed May 23rd, 1946.
- Submarine
Perle (
Emeraude class) laid down July 1st, 1945. 1750 tons required. 0 tons added in Q2/1946 for a total of 1750 / 1750 tons. 0 / 1750 tons remaining. Launched November 9th, 1945. Completed May 23rd, 1946.
- Submarine
Jaspe (
Emeraude class) laid down July 1st, 1945. 1750 tons required. 0 tons added in Q2/1946 for a total of 1750 / 1750 tons. 0 / 1750 tons remaining. Launched November 9th, 1945. Completed May 23rd, 1946.
Arsenal de Cayenne (Cl 5)
Class 3 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Dockside:
N/A
Arsenal de Abidjan (Cl 5)
Class 3 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Arsenal de Oran (Cl 5)
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Arsenal de Tunis (Cl 5)
Class 4 Drydock #1 - Idle.
Class 3 Slip #1 - Idle.
Class 1 drydock #1 - Idle.
Dockside:
N/A
Société Nouvelle des Forges et Chantiers de la Méditerranée, Beiruit (Cl 5)
Class 3 Drydock #1 - Idle.
Dockside:
N/A
Arsenal de Djibouti (Cl 2)
Class 2 Drydock #1 - Idle.
Class 1 Drydock - Idle.
Class 1 Drydock #1 - Idle.
Base Navale, Dakar
Class 1 Floating Drydock #1 - Idle.
Forges et Chantiers de Indochine, Saigon (Cl 5)
Class 4 Drydock #1 - Four river patrol craft (
105,
106,
107, and
108) laid down for Royal Cambodian Navy on April 1st, 1946. 10 tons required for each. 10 tons added to each. Completed on April 30th, 1946.
Class 1 Drydock #1 - Frigate
Trieu Thi Trinh laid down January 1st, 1946. 1,400 tons required. 400 tons added in Q2/1946 for a total of 800 / 1400 tons. 600 / 1400 tons remaining. Launched May 5th, 1946. Completed November 12th, 1946.
Class 0 Drydock #1 -
Drageur de mines 17.4m built for the Royal Cambodian Navy. 30 tons required. 30 tons added Q2/1946.
Class 0 Slip #1 - Subchaser
My Tho (
Cam Ranh class) laid down April 1st, 1946. 125 tons required. 125 tons added in Q2/1946 for a total of 125 / 125 tons. 0 / 0 tons remaining. Launched complete April 30th, 1946.
Class 0 Slip #2 - Idle.
Dockside:
- N/A
Forges et Chantiers de Indochine, Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Sea Truck
Ratanakiri laid down April 1st for Cambodian Royal Navy. 160t required. 160 tons added Q2/1946. 0 / 160 tons remaining until completion.
Forges et Chantiers de Nouvelle-Calédonie (Cl 5)
Class 4 Drydock #1 - Idle.
Class 2 Drydock #1 - Idle.
Class 1.5 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Class 1 Slip #1 - Idle.
Class 0 Slip #1 - Aviso
Tonkinois (
Arabe class) laid down January 1st, 1946. 634 tons required. 190 tons added in Q2/1946 for a total of 380 / 634 tons. 254 / 634 tons remaining. Launched May 27th, 1946. Completed October 19th, 1946.
Class 0 Slip #2 - Aviso
Touareg (
Arabe class) laid down January 1st, 1946. 634 tons required. 190 tons added in Q2/1946 for a total of 380 / 634 tons. 254 / 634 tons remaining. Launched May 27th, 1946. Completed October 19th, 1946.
Class 0 Slip #3 - Idle.
Dockside:
- Aviso
Kabyle (
Arabe class) laid down July 1st, 1945. 634 tons required. 64 tons added in Q2/1946 for a total of 634 / 634 tons. 0 / 634 tons remaining. Launched November 27th, 1945. Completed April 19th, 1945.
- Aviso
Marocain (
Arabe class) laid down July 1st, 1945. 634 tons required. 64 tons added in Q2/1946 for a total of 634 / 634 tons. 0 / 634 tons remaining. Launched November 27th, 1945. Completed April 19th, 1945.
At Papeete (Cl 3)
Class 3.5 Drydock - Idle.
Dockside:
- None
On Trials:
Many, many things.
From Factories
- 4x
Vedette Rapide 23m type MTBs built for 45t each (180t total), assigned to Indochinese Naval Patrol.
Transactions
- 2,379 tons from Romania for Export Battleship (construction costs).
Other Notes
All thirty-four of the armoured river patrol boats are transferred from the French Navy to the Indochinese Naval Patrol.
Ships being scrapped
No ships being scrapped this quarter.
Updated Order of Battle, End of Q2/1946
Note: X(Y)+Z = completed (under repair/refit) + under construction - scrapping
The Fleet
Battleships: 6(1)+1
Battlecruisers: 4(0)+0
Aircraft Carriers: 13(0)+2
Heavy Cruisers: 9(0)+3
Light Cruisers: 26(0)+0
Coast Defense Ships: 1(0)+0
Destroyers: 89(0)+6
Frigates: 4(0)+0
Corvettes: 10(0)+0
Escorteurs Rapides: 12(0)+8
Avisos: 15(0)+4
Fleet Submarines: 32(0)+6
Coastal Submarines: 55(0)+0
Motor Torpedo Boats: 38(0)+0
Motor Torpedo Boat Experimental: 1(0)+0
Patrouilleurs: 16(0)+0
Submarine Chasers: 100(0)+0
Light Patrol Boats: 8(0)+0
Vedettes: 8(0)+0
Minesweepers: 28(0)+0
Fleet Train
Replenishment Ships: 16(0)+0
Light Oiler Tankers: 7(0)+0
Gasoline Tankers: 3(0)+0
Oil Transport Tankers: 9(0)+0
Fleet Tenders: 4(0)+0
Submarine Tenders: 1(0)+0
Heavy Repair Ships: 2(0)+0
Light Repair Ships: 4(0)+0
Ammunition Ships: 2(0)+0
Transports: 8(0)+0
Aircraft Transports: 2(0)+0
Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Fleet Tugs: 12(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 0(0)+0
Research Ship: 5(0)+0
Research Submarine: 1(0)+0
Amphibious Forces:
Dock Landing Ship: 2(0)+0
Vehicle Landing Ship: 4(0)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 10(0)+0
Infantry Landing Craft Large (EDA-L): 6(0)+2
Tank Landing Craft (EDA): 17(0)+0
Infantry Assault Craft Small (EA): 33(0)+0
Minor Craft:
Bateau de Service: 72(0)+0
Patrouilleur de Port: 54(0)+0
Hydroglisseurs: 32(0)+0
Patrouille Navale Indochinoise:
Frigates: 1(0)+1
Avisos: 4(0)+0
Minesweepers: 16(0)+0
Survey Craft: 1(0)+0
Civil Support Ships: 1(0)+0
River Gunboats: 34(0)+0
Tank Landing Craft (EDA): 8(0)+0
Infantry Assault Craft (EA): 8(0)+0
Submarine Chasers: 55(0)+0
Motor Torpedo Boats: 8(0)+0
Vedettes: 24(0)+0
Light Patrol Boats: 4(0)+0
Bateau de Service: 12(0)+0
Patrouilleur de Port: 4(0)+0
Royal Cambodian Navy:
Motor Torpedo Boats: 0(0)+0
Sea Trucks: 2(0)+0
River Patrol Boats: 4(0)+0
Harbor Minesweepers: 1(0)+0
Tugboats: 1(0)+0
Reserve the right to edit for typos or other mistakes.