You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, May 5th 2015, 9:13pm

Yugoslavia 2Q 46 Sim Report

A. Factories

Factories : 2
Producing Warship Material : 1
Tonnage Produced : 1,000
Producing Infrastructure (Committed) : 1
Producing Infrastructure (Non - Committed) : 0
Infrastructure Points Produced : 0.10
Bonus IP for Committed Factories : 0.00
Total IP Available : 0.10

Tonnage Produced : 1,000
Tonnage Transferred In : 0
Tonnage Received in Payment : 680
Tonnage Reclaimed From Scrap : 0
Tonnage Previously Stockpiled : 69
Total Tonnage Available : 1,749
Tonnage Paid : 0
Tonnage Used in Construction : 1,554
Tonnage Remaining for Stockpile : 195


B. Infrastructure Development

At Bar: Construction of a Type 1.0 Floating Dry Dock for eventual deployment to Durres: 1.0 IP required, 0.1 IP provided this quarter, total 0.2 IP committed; 0.8 IP remaining

At Belgrade: None


C. Naval Development and Construction

At Bar:

Dock No.1 (Type 2.0): Refit of Destroyer Kakanj – Refit commenced 18 February 1946: Requires 252 tons; prior construction 150 tons, receives 102 tons, 0 tons remaining; commences post-refit trials

Dock No.1 (Type 2.0): Refit of Destroyer Konijc – Refit commenced 29 April 1946: Requires 252 tons; prior construction 0 tons, receives 252 tons, 0 tons remaining; commences post-refit trials

Dock No.2 (Type 0.0): Idle

Slip No.1 (Type 1.5): Project 1946 Theta - Fleet Tender B – Laid down 1 April 1946: Requires 1,790 tons; prior construction 0 tons, receives 324 tons, 1,340 tons remaining

Slip No.2 (Type 0): Construction of one Project 1946 Delta MTB – 99 tons; complete

Slip No.3 (Type 0): Construction of one Project 1946 Delta MTB – 99 tons; complete


Dockside:

Idle

At Belgrade:

Dock No.1 (Type 0): Idle

Slip No.1 (Type 0): Idle


At Durres:

Bulgarian Floating Dock (Type 2.0) (On Loan): Refit of Destroyer Karlovac – Requires 252 tons; prior construction 150 tons, receives 102 tons, 0 tons remaining; commences post-refit trials

Bulgarian Floating Dock (Type 2.0) (On Loan): Refit of Destroyer Koprivnica – Refit commenced 29 April 1946: Requires 252 tons; prior construction 0 tons, receives 252 tons, 0 tons remaining; commences post-refit trials


Small Craft Construction

Two Project 1946 Delta MTB from Factories – total 198 tons


D. Transactions

Four Skopje class torpedo boats sold to Pacifica for 1,700 tons; initial installment of 680 tons received.


E. Refits

See above: refit of Pristina class destroyers complete


Ships Laid Down This Quarter

At Bar:

Project 1946 Theta - Fleet Tender B
Two Project 1946 Delta MTB


At Belgrade:

None


Ships Launched This Quarter

At Bar:

None

At Belgrade:

None


Ships Completed This Quarter

At Bar:

Two Project 1946 Delta MTB plus two Project 1946 Delta MTB from factories – total four this quarter


At Belgrade:

None


Ships Undergoing Trials

Destroyer Konijc
Destroyer Koprivnica

Ships Completing Trials

Corvette Usora
Corvette Brka

Destroyer Kakanj (post refit)
Destroyer Karklovac (post refit)


F. Scrappage Report

None this quarter




Order of Battle of the Royal Yugoslav Navy, June 1946

Type : In Service + Trials + Building + Refitting = Total
Light Cruisers : 4 + 0 + 0 + 0 = 4
Destroyer Leaders : 3 + 0 + 0 + 0 = 3
Destroyers : 6 + 2 + 0 + 0 = 8
Light Destroyers : 4 + 0 + 0 + 0 = 4
Torpedo Boats : 4 + 0 + 0 + 0 = 4
Escort Sloops : 8 + 0 + 0 + 0 = 8
Corvettes : 8 + 0 + 0 + 0 = 8
Submarines : 3 + 0 + 0 + 0 = 3
Armoured Gunboats : 8 + 0 + 0 + 0 = 8
Minecraft : 12 + 0 + 0 + 0 = 12
Motor Torpedo Boats : 28 + 0 + 0 + 0 = 24
Fleet Tender : 1 + 0 + 1 + 0 = 2
Seaplane Tender : 1 + 0 + 0 + 0 = 1
Netlayers : 4 + 0 + 0 + 0 = 4
Riverine Monitors : 8 + 0 + 0 + 0 = 8