You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, February 18th 2015, 2:34am

Bharat, 1946

EMPIRE OF BHARAT, Q1/1946


May the Lord of the Oceans be Auspicious unto Us


TL;DR:

New Construction: 1 CL, 3 SS, 1 AD, 1 AKA, 1 x LCT, 1 ATO, 1 barge, 1 x RH, 2 x LCM, 1 x PB, 2 x MTB
Completions: 3 x PC, 1 x AST, 1 x LCT, 1 x RH, 2 x LCM, 1 x PB, 2 x MTB
Scrapping:


A. Factories

9/11 factories = 9,000 t of material + 15,140 t stockpiled + 389 t scrap + 77 t from Persia = 24,606 t available.

11,553 t are used, leaving a stockpile of 13,053 t.

2/11 factories (committed) = 0.2 + 0.0 bonus infrastructure pts available.

0/11 factories (flexible) = 0.0 infrastructure pts available.


B. Infrastructure Development

Commence FD1.5 at Karachi: 0.2 IP for 0.2 IP of 1.25 IP required, ongoing


C. Naval Development and Construction

At Kolachi Naval Yard [Karachi]
FD1.5: *Under construction*

At Kanhoji Angre Shipworks (Mumbai):
S3: CL Karachi laid down, receives 1,690 t, to complete 8/47
S2.5: Idle
S1.5: AKA Havildar Hiren Barua, laid down to civilian standards, receives 250 t, to complete 3/47
S1: SS Bhayankara laid down, receives 386 t, to complete 11/46
D3.5: AD Commodore Laloo Sen receives 115 t in repairs, completed 3/46
Free Floating:
CL Bangalore receives 1,690 t, to complete 8/46
AOR (unnamed Persian unit) receives 227 t, to complete 5/46
SS Adarniya receives 386 t, to complete 5/46

At Maldives Steel Works (Male):
D3: Idle
D1: SS I-15 undergoes 15% refit, receives 68 t, completed.
Free Floating:

At Diego Garcia Naval Base:
S1: ATO Mahim, laid down to civilian standards, receives 50 t, to complete 10/46
D1: PC Korba receives 15% Major Refit, receives 69 t, completed.
Free Floating:
ATO Jatindra receives 50 t, to complete 4/46

At Sri Lanka Iron Works (Trincomalee):
S1: SS Daravana laid down, receives 386 t, to complete 11/46
S1: Water Distillation Barge #2 laid down to civilian standards, receives 100 t, to complete 10/46
S0: Idle
D2: Idle
Free Floating:
SS Sammanita receives 386 t, to complete 5/46
PC Ishwardi receives 0 t, completed 2/46
Water Distillation Barge #1 receives 100 t, to complete 4/46
3 x LCV (LCV1-3) receive mid-life refits totalling 53 t, completed.

At Imperial Ship Yard (Chennai):
S3: AD Lieutenant Abul Majumdar laid down to civilian standards, receives 298 t, to complete 3/47
S2: Idle
S1: SS Sahasika laid down, receives 386 t, to complete 11/46
D4: CV Trishula receives 2,382 t, to complete 7/48
D3: Idle
Free-floating:
LSD Colonel Asaf Kripalani receives 1,062 t, to complete 5/46
SS Bhayanaka receives 386 t, to complete 5/46
AST-P Ghaghra receives 553 t, completed 3/46

At Royal Sittwe Naval Yard (Sittwe):
S1: Idle
S0: Idle
D1: Idle
FD0: Idle
Free Floating:
PC Satkhira receives 0 t, completed 2/46
PC Basirhat receives 0 t, completed 2/46

Miscellaneous Small Craft Work

1 x 25 t Harbour Inspection Boat built
2 x 50 t MTB built
2 x 35 t LCM (LCM-17/18) built
1 x 196 t River Hospitalboat built (RH-8) built
1 x 199 t Landing Craft, Tank (LCT-14) built


D. Transactions:

Nothing new.


E. Other notes:

The Balochi earthquake of November 1945 generated a tsunami that was eight to ten metres high when it struck Porbandar. One motor gunboat, seven motor torpedo-boats, and two patrol boats were destroyed in the disaster, and the depot ship Commodore Laloo Sen suffered some damage. These items are not reflected in the Q4/45 sim report, but do show up here.

F. Disposal Report:

Scrapping of the remaning Bassein-class destroyers is cancelled; these ships are now placed in reserve status.


G. Updated Order of Battle, End of Quarter

Note: X(Y) +Z = completed (under repair/refit) + under construction

Major Warships

Battleships (BB): 2(0) + 0
Aircraft Carriers (CV): 5(0) + 1
Armored Cruisers (AC): 2(0) + 0
Cruisers (CL): 18(0) + 2
Daakuui (DA): 8(0) + 0
Destroyers (DD): 49(0) + 0
Submarines (SS): 35(0) + 6

Patrol and Escort Ships

Frigates (PF): 4(0) + 0
Paratraatii (PP): 24(0) + 0
Charavaahii (PC): 16(0) + 0
Survey Ships (PS): 2(0) + 0
ASW Launches (ASL): 66(0) + 0
Harbour Patrol Craft (PH): 41(0) + 0

Coastal Forces

Monitors (BM): 1(0) + 0
Motor Gun Boats (MGB): 11(0) + 0
Motor Torpedo Boats (MTB/MGB): 65(0) + 0

Mine Warfare

Minelayers (CM): 7(0) + 0
Minesweepers (AM): 22(0) + 0

Training Units

Aircraft Carrier, Training (AVT): 1(0) + 0
Heavy Cruiser, Training (CAT): 1(0) + 0
Paritraataa, Training (PPT): 4(0) + 0
Submarine, Training (SST): 1(0) + 0

Auxiliaries and Fleet Train

Boom Defense Vessels (ABD): 13(0) + 0
Depot Ship (AD): 12(0) + 1
Disaster Relief Ships (ADR): 2(0) + 0
Hospital Ships (AHO): 1(0) + 0
Oilers (AOL): 2(0) + 0
Oilers, Replenishment (AOR): 4(0) + 0
Meteorological Observation Ship (AOM): 4(0) + 0
Repair Ships (AR): 2(0) + 0
Strategic Sealift Transport (AST): 4(0) + 0
Harbour Tugs (ATH): 12(0) + 0
Ocean-going Tugs (ATO): 6(0) + 2
Salvage Ship (ATS): 2(0) + 0
River Hospitalboats (RH): 8(0) + 0
Generator Barge: 2(0) + 0
Distillation Barge: 0(0) + 2

Amphibious Assault Ships

Armed Transport (APD): 4(0) + 0
Landing Ship, Dock (LSD): 0(0) + 1
Landing Ship, Command (LSC): 1(0) + 0
Landing Ship, Infantry (LSI): 4(0) + 0
Landing Ship, Tank (LST): 5(0) + 0
Landing Craft, Tank (LCT): 5(0) + 0
Landing Craft, Tank (LCV): 9(0) + 0
Landing Craft, Medium (LCM): 18(0) + 0
Landing Craft, Vehicle/Personnel (LCVP): 104(0) + 0

2

Wednesday, November 11th 2015, 3:53pm

EMPIRE OF BHARAT, Q2/1946


May the Lord of the Oceans be Auspicious unto Us


TL;DR:

New Construction: 3 x PC, 1 x LCT, 1 x RH, 2 x LCM, 2 x PB, 4 x MTB; 1 x AP refitted to service
Completions: 1 x LSD, 3 x SS, 1 x LCT, 1 x RH, 2 x LCM, 2 x PB, 4 x MTB, 1 x ATO, 1 x barge
Scrapping: None


A. Factories

9/11 factories = 9,000 t of material + 13,053 t stockpiled + 186 t scrap + 85 t from Persia = 22,324 t available.

12,803 t are used, leaving a stockpile of 9,521 t.

2/11 factories (committed) = 0.2 + 0.0 bonus infrastructure pts available.

0/11 factories (flexible) = 0.0 infrastructure pts available.


B. Infrastructure Development

Commence FD1.5 at Karachi: 0.2 IP for 0.4 IP of 1.25 IP required, ongoing


C. Naval Development and Construction

At Kolachi Naval Yard [Karachi]
FD1.5: *Under construction*

At Kanhoji Angre Shipworks (Mumbai):
S3: CL Karachi receives 1,690 t, to complete 8/47
S2.5: Idle
S1.5: AKA Havildar Hiren Barua receives 250 t, launched, to complete 3/47
S1: SS Bhayankara receives 386 t, launched, to complete 11/46
D3.5: Idle
Free Floating:
CL Bangalore receives 1,690 t, to complete 8/46
AOR (unnamed Persian unit) receives 85 t, completed 5/46
SS Adarniya receives 386 t, completed 5/46

At Maldives Steel Works (Male):
D3: Idle
D1: SS Upadravi undergoes 15% refit, receives 68 t, completed.
Free Floating:
Packet Nimrat Anand refitted to service, receives 513 t, completed 6/46

At Diego Garcia Naval Base:
S1: ATO Mahim receives 50 t, launched, to complete 10/46
D1: PC Belgaum receives 15% Major Refit, receives 69 t, completed.
Free Floating:
ATO Jatindra receives 49 t, completed 4/46

At Sri Lanka Iron Works (Trincomalee):
S1: SS Daravana receives 386 t, launched, to complete 11/46
S1: Water Distillation Barge #2, receives 100 t, launched, to complete 10/46
S0: PC Dhemaji laid down, receives 499 t, to complete 8/46
D2: Idle
Free Floating:
SS Sammanita receives 386 t, completed 5/46
Water Distillation Barge #1 receives 29 t, completed 4/46
3 x LCV (LCV4-6) receive mid-life refits totalling 53 t, completed.

At Imperial Ship Yard (Chennai):
S3: AD Lieutenant Abul Majumdar receives 298 t, launched, to complete 3/47
S2: Idle
S1: SS Sahasika receives 386 t, launched, to complete 11/46
D4: CV Trishula receives 2,382 t, to complete 7/48
D3: Idle
Free-floating:
LSD Colonel Asaf Kripalani receives 1,059 t, completed 5/46
SS Bhayanaka receives 386 t, completed 5/46

At Royal Sittwe Naval Yard (Sittwe):
S1: PC Mangaldai laid down, receives 499 t, to complete 8/46
S0: PC Morigaon laid down, recevies 499 t, to complete 8/46
D1: LCT-15 laid down, receives 199 t, to completed 8/46
FD0: Idle
Free Floating:


Miscellaneous Small Craft Work

2 x 25 t Harbour Inspection Boat built
4 x 50 t MTB built
2 x 35 t LCM (LCM-17/18) built
1 x 196 t River Hospitalboat built (RH-8) built


D. Transactions:

Nothing new.


E. Other notes:

The LCT program has been bumped from Small Craft Work to a regular drydock, so that MTB/patrol boat losses from the 1945 earthquake can be replaced faster.

F. Disposal Report:

Nothing exciting goind on now.


G. Updated Order of Battle, End of Quarter

Note: X(Y) +Z = completed (under repair/refit) + under construction

Major Warships

Battleships (BB): 2(0) + 0
Aircraft Carriers (CV): 5(0) + 1
Armored Cruisers (AC): 2(0) + 0
Cruisers (CL): 18(0) + 2
Daakuui (DA): 8(0) + 0
Destroyers (DD): 49(0) + 0
Submarines (SS): 38(0) + 3

Patrol and Escort Ships

Frigates (PF): 4(0) + 0
Paratraatii (PP): 24(0) + 0
Charavaahii (PC): 16(0) + 3
Survey Ships (PS): 2(0) + 0
ASW Launches (ASL): 66(0) + 0
Harbour Patrol Craft (PH): 43(0) + 0

Coastal Forces

Monitors (BM): 1(0) + 0
Motor Gun Boats (MGB): 11(0) + 0
Motor Torpedo Boats (MTB/MGB): 69(0) + 0

Mine Warfare

Minelayers (CM): 7(0) + 0
Minesweepers (AM): 22(0) + 0

Training Units

Aircraft Carrier, Training (AVT): 1(0) + 0
Heavy Cruiser, Training (CAT): 1(0) + 0
Paritraataa, Training (PPT): 4(0) + 0
Submarine, Training (SST): 1(0) + 0

Auxiliaries and Fleet Train

Boom Defense Vessels (ABD): 13(0) + 0
Depot Ship (AD): 12(0) + 1
Disaster Relief Ships (ADR): 2(0) + 0
Hospital Ships (AHO): 1(0) + 0
Oilers (AOL): 2(0) + 0
Oilers, Replenishment (AOR): 4(0) + 0
Meteorological Observation Ship (AOM): 4(0) + 0
Packet (AP): 1(0) + 0
Repair Ships (AR): 2(0) + 0
Strategic Sealift Transport (AST): 4(0) + 0
Harbour Tugs (ATH): 12(0) + 0
Ocean-going Tugs (ATO): 7(0) + 1
Salvage Ship (ATS): 2(0) + 0
River Hospitalboats (RH): 9(0) + 0
Generator Barge: 2(0) + 0
Distillation Barge: 1(0) + 1

Amphibious Assault Ships

Armed Transport (APD): 4(0) + 0
Landing Ship, Dock (LSD): 0(0) + 1
Landing Ship, Command (LSC): 1(0) + 0
Landing Ship, Infantry (LSI): 4(0) + 0
Landing Ship, Tank (LST): 5(0) + 0
Landing Craft, Tank (LCT): 5(0) + 1
Landing Craft, Tank (LCV): 9(0) + 0
Landing Craft, Medium (LCM): 20(0) + 0
Landing Craft, Vehicle/Personnel (LCVP): 104(0) + 0[/quote]

3

Wednesday, November 11th 2015, 4:21pm

EMPIRE OF BHARAT, Q3/1946


May the Lord of the Oceans be Auspicious unto Us


TL;DR:

Laid Down: 3 SS, 1 Packet, 1 AD, 1 AKA, 2 PB, 4 MTB, 1 LCT, 2 LCM, 1 RH
Completed: 1 CL, 3 PC, 1 Packet, 2 PB, 4 MTB, 1 LCT, 2 LCM, 1 RH
Scrapped: None


A. Factories

9/11 factories = 9,000 t of material + 9,521 t stockpiled + 186 t scrap + 227 t from Persia = 18,934 t available.

10,018 t are used, leaving a stockpile of 8,916 t.

2/11 factories (committed) = 0.2 + 0.0 bonus infrastructure pts available.

0/11 factories (flexible) = 0.0 infrastructure pts available.


B. Infrastructure Development

Commence FD1.5 at Karachi: 0.2 IP for 0.6 IP of 1.25 IP required, ongoing


C. Naval Development and Construction

At Kolachi Naval Yard [Karachi]
FD1.5: *Under construction*

At Kanhoji Angre Shipworks (Mumbai):
S3: CL Karachi receives 1,690 t, launched, to complete 8/47
S2.5: Persian AOR#2 laid down to civilian standards, receives 227 t, to complete 8/47
S1.5: AKA Havildar Alok Mehra laid down to civilian standards, receives 250 t, to complete 9/47
S1: SS Nidara laid down, receives 386 t, to complete 5/47
D3.5: Idle
Free Floating:
CL Bangalore receives 1,092 t, completed 8/46
SS Bhayankara receives 386 t, to complete 11/46
AKA Havildar Hiren Barua receives 250 t, to complete 3/47

At Maldives Steel Works (Male):
D3: Idle
D1: SS Imanadara undergoes 15% refit, receives 68 t, completed.
Free Floating:
Packet Parul Kanwal refitted to service, receives 513 t, completed 9/46

At Diego Garcia Naval Base:
S1: Idle
D1: SS Pakka undergoes 15% life extension refit, receives 69 t, completed 9/46
Free Floating:
ATO Mahim receives 50 t, to complete 10/46

At Sri Lanka Iron Works (Trincomalee):
S1: SS Sahasi laid down, receives 386 t, to complete 5/47
S1: Idle
S0: Idle
D2: Idle
Free Floating:
SS Daravana receives 386 t, to complete 11/46
3 x LCV (LCV7-9) receive mid-life refits totalling 53 t, completed.
PC Dhemaji receives 0 t, completed 8/46
Water Distillation Barge #2 receives 100 t, to complete 10/46

At Imperial Ship Yard (Chennai):
S3: AD Petty Officer Sharang Nath laid down to civilian standards, receives 298 t, to complete 9/47
S2: Idle
S1: SS Dabanga laid down, receives 386 t, to complete 5/47
D4: CV Trishula receives 2,382 t, launched, to complete 7/48
D3: Idle
Free-floating:
SS Sahasika receives 386 t, to complete 11/46
AD Lieutenant Abul Majumbar receives 298 t, to complete 3/47

At Royal Sittwe Naval Yard (Sittwe):
S1: Idle
S0: Idle
D1: LCT-16 laid down, receives 199 t, to complete 11/46
FD0: Idle
Free Floating:
PC Mangaldai receives 0 t, completed 8/46
PC Morigoan receives 0 t, completed 8/46
LCT-15 receives 0 t, completed 8/46


Miscellaneous Small Craft Work

2 x 25 t Harbour Inspection Boat built
4 x 50 t MTB built
2 x 35 t LCM (LCM-17/18) built
1 x 196 t River Hospitalboat built (RH-8) built


D. Transactions:

Nothing new.


E. Other notes:

The LCT program has been bumped from Small Craft Work to a regular drydock, so that MTB/patrol boat losses from the 1945 earthquake can be replaced faster.

F. Disposal Report:

Nothing exciting goind on now.


G. Updated Order of Battle, End of Quarter

Note: X(Y) +Z = completed (under repair/refit) + under construction

Major Warships

Battleships (BB): 2(0) + 0
Aircraft Carriers (CV): 5(0) + 1
Armored Cruisers (AC): 2(0) + 0
Cruisers (CL): 19(0) + 1
Daakuui (DA): 8(0) + 0
Destroyers (DD): 49(0) + 0
Submarines (SS): 38(0) + 6

Patrol and Escort Ships

Frigates (PF): 4(0) + 0
Paratraatii (PP): 24(0) + 0
Charavaahii (PC): 19(0) + 0
Survey Ships (PS): 2(0) + 0
ASW Launches (ASL): 66(0) + 0
Harbour Patrol Craft (PH): 45(0) + 0

Coastal Forces

Monitors (BM): 1(0) + 0
Motor Gun Boats (MGB): 11(0) + 0
Motor Torpedo Boats (MTB/MGB): 73(0) + 0

Mine Warfare

Minelayers (CM): 7(0) + 0
Minesweepers (AM): 22(0) + 0

Training Units

Aircraft Carrier, Training (AVT): 1(0) + 0
Heavy Cruiser, Training (CAT): 1(0) + 0
Paritraataa, Training (PPT): 4(0) + 0
Submarine, Training (SST): 1(0) + 0

Auxiliaries and Fleet Train

Boom Defense Vessels (ABD): 13(0) + 0
Depot Ship (AD): 12(0) + 2
Disaster Relief Ships (ADR): 2(0) + 0
Hospital Ships (AHO): 1(0) + 0
Oilers (AOL): 2(0) + 0
Oilers, Replenishment (AOR): 4(0) + 0
Meteorological Observation Ship (AOM): 4(0) + 0
Packet (AP): 2(0) + 0
Repair Ships (AR): 2(0) + 0
Strategic Sealift Transport (AST): 4(0) + 0
Harbour Tugs (ATH): 12(0) + 0
Ocean-going Tugs (ATO): 8(0) + 0
Salvage Ship (ATS): 2(0) + 0
River Hospitalboats (RH): 11(0) + 0
Generator Barge: 2(0) + 0
Distillation Barge: 1(0) + 1

Amphibious Assault Ships

Armed Transport (APD): 4(0) + 0
Landing Ship, Dock (LSD): 1(0) + 0
Landing Ship, Command (LSC): 1(0) + 0
Landing Ship, Infantry (LSI): 4(0) + 0
Landing Ship, Tank (LST): 5(0) + 0
Landing Craft, Tank (LCT): 6(0) + 1
Landing Craft, Tank (LCV): 9(0) + 0
Landing Craft, Medium (LCM): 22(0) + 0
Landing Craft, Vehicle/Personnel (LCVP): 104(0) + 0[/quote]

4

Wednesday, November 11th 2015, 5:09pm

EMPIRE OF BHARAT, Q4/1946


May the Lord of the Oceans be Auspicious unto Us


TL;DR:

Laid Down: 3 PC, 2 PB, 4 MTB, 1 LCT, 2 LCM, 1 RH
Completed: 3 SS, 2 PB, 4 MTB, 1 LCT, 2 LCM, 1 RH, 1 barge, 1 ATO
Scrapped: None


A. Factories

9/11 factories = 9,000 t of material + 8,916 t stockpiled + 24 t scrap + 227 t from Persia = 18,167 t available.

10,083 t are used, leaving a stockpile of 8,084 t.

2/11 factories (committed) = 0.2 + 0.2 bonus infrastructure pts available.

0/11 factories (flexible) = 0.0 infrastructure pts available.


B. Infrastructure Development

Commence FD1.5 at Karachi: 0.4 IP for 1.0 IP of 1.25 IP required, ongoing


C. Naval Development and Construction

At Kolachi Naval Yard [Karachi]
FD1.5: *Under construction*

At Kanhoji Angre Shipworks (Mumbai):
S3: Idle
S2.5: Persian AOR#2 receives 227 t, launched, to complete 8/47
S1.5: AKA Havildar Alok Mehra receives 250 t, launched, to complete 9/47
S1: SS Nidara receives 386 t, launched, to complete 5/47
D3.5: Idle
Free Floating:
CL Karachi receives 1,635 t, to complete 8/47
SS Bhayankara receives 386 t, completed 11/46
AKA Havildar Hiren Barua receives 250 t, to complete 3/47

At Maldives Steel Works (Male):
D3: Idle
D1: SS Jiddi undergoes 15% refit, receives 68 t, completed.
Free Floating:
None

At Diego Garcia Naval Base:
S1: Idle
D1: SS Rocaka undergoes 15% life extension refit, receives 69 t, completed 9/46
Free Floating:
ATO Mahim receives 49 t, completed 10/46

At Sri Lanka Iron Works (Trincomalee):
S1: SS Sahasi receives 386 t, launched, to complete 5/47
S1: Idle
S0: PC Haflong laid down, receives 499 t, launched, to complete 2/47
D2: Idle
Free Floating:
SS Daravana receives 386 t, completed 11/46
Water Distillation Barge #2 receives 29 t, completed 10/46

At Imperial Ship Yard (Chennai):
S3: AD Petty Officer Sharang Nath receives 298 t, launched, to complete 9/47
S2: Idle
S1: SS Dabanga receives 386 t, launched, to complete 5/47
D4: CV Trishula receives 2,382 t, launched, to complete 7/48
D3: Idle
Free-floating:
SS Sahasika receives 386 t, completed 11/46
AD Lieutenant Abul Majumbar receives 298 t, to complete 3/47

At Royal Sittwe Naval Yard (Sittwe):
S1: PC Tezpur laid down, receives 499 t, launched, to complete 2/47
S0: PC Tinsukla laid down, receives 499 t, launched, to complete 2/47
D1: LCT-17 laid down, receives 199 t, to complete 2/47
FD0: Idle
Free Floating:
LCT-16 receives 0 t, completed 11/46


Miscellaneous Small Craft Work

2 x 25 t Harbour Inspection Boat built
4 x 50 t MTB built
2 x 35 t LCM built
1 x 196 t River Hospitalboat built


D. Transactions:

Nothing new.


E. Other notes:

The LCT program has been bumped from Small Craft Work to a regular drydock, so that MTB/patrol boat losses from the 1945 earthquake can be replaced faster.

F. Disposal Report:

Nothing exciting going on now.


G. Updated Order of Battle, End of Quarter

Note: X(Y) +Z = completed (under repair/refit) + under construction

Major Warships

Battleships (BB): 2(0) + 0
Aircraft Carriers (CV): 5(0) + 1
Armored Cruisers (AC): 2(0) + 0
Cruisers (CL): 19(0) + 1
Daakuui (DA): 8(0) + 0
Destroyers (DD): 49(0) + 0
Submarines (SS): 41(0) + 3

Patrol and Escort Ships

Frigates (PF): 4(0) + 0
Paratraatii (PP): 24(0) + 0
Charavaahii (PC): 19(0) + 3
Survey Ships (PS): 2(0) + 0
ASW Launches (ASL): 66(0) + 0
Harbour Patrol Craft (PH): 49(0) + 0

Coastal Forces

Monitors (BM): 1(0) + 0
Motor Gun Boats (MGB): 11(0) + 0
Motor Torpedo Boats (MTB/MGB): 77(0) + 0

Mine Warfare

Minelayers (CM): 7(0) + 0
Minesweepers (AM): 22(0) + 0

Training Units

Aircraft Carrier, Training (AVT): 1(0) + 0
Heavy Cruiser, Training (CAT): 1(0) + 0
Paritraataa, Training (PPT): 4(0) + 0
Submarine, Training (SST): 1(0) + 0

Auxiliaries and Fleet Train

Boom Defense Vessels (ABD): 13(0) + 0
Depot Ship (AD): 12(0) + 2
Disaster Relief Ships (ADR): 2(0) + 0
Hospital Ships (AHO): 1(0) + 0
Oilers (AOL): 2(0) + 0
Oilers, Replenishment (AOR): 4(0) + 0
Meteorological Observation Ship (AOM): 4(0) + 0
Packet (AP): 2(0) + 0
Repair Ships (AR): 2(0) + 0
Strategic Sealift Transport (AST): 4(0) + 0
Harbour Tugs (ATH): 12(0) + 0
Ocean-going Tugs (ATO): 8(0) + 0
Salvage Ship (ATS): 2(0) + 0
River Hospitalboats (RH): 12(0) + 0
Generator Barge: 2(0) + 0
Distillation Barge: 2(0) + 0

Amphibious Assault Ships

Armed Transport (APD): 4(0) + 0
Landing Ship, Dock (LSD): 1(0) + 0
Landing Ship, Command (LSC): 1(0) + 0
Landing Ship, Infantry (LSI): 4(0) + 0
Landing Ship, Tank (LST): 5(0) + 0
Landing Craft, Tank (LCT): 7(0) + 1
Landing Craft, Tank (LCV): 9(0) + 0
Landing Craft, Medium (LCM): 24(0) + 0
Landing Craft, Vehicle/Personnel (LCVP): 104(0) + 0[/quote]