You are not logged in.

1

Wednesday, February 4th 2015, 5:00pm

Persia, 1946

Persia, Q1 1946

Industrial Allocation

2 factories allocated to building warship material
1 factories allocated to production of infrastructure materials

2,000 t produced + 1,385 t stockpiled - 77 t to Bharat = 3,308 t available
1,486 t used
1,822 t stockpiled
0.1 + 0.0 bonus IP produced.

Infrastructure Development

Commence FD0 at Bushehr: 0.1 IP for 0.1 IP or 0.5 IP required; ongoing.

Construction

At Bushehr (Persian Gulf)
D1: Idle
Free-floating:
Nada

At Bandar-e Abbas (Strait of Hormuz)
S1-A: Idle
S1-B: Idle
S0-A: SL Paloon Gardan laid down, receives 499 t, launched, to complete 5/46
S0-B: LCT-5 laid down, receives 199 t, launched, to complete 5/46
S0-C: Idle
D2.5: Idle
D1: DD Hormoz undergoes 15% life-extension refit, receives 222 t, completed 3/46
D0: Idle
Free-floating:
SL Varavast receives 300 t, completed 1/46
LCT-4 receives 0 t, completed 2/46

At Bandar-e Anzali (Caspian Sea)
S1: Idle
D1: SL Arak undergoes 15% mid-life refit, receives 180 t, completed 3/46

Built in factories

2 x 8 t LCVP built
2 x 35 t LCM built


Transactions:

A Kalpeni class replenishment oiler has been ordered from Bharat. This unit will be completed in Q2/1946. A second oiler is to be laid down 3/46. Upon further discussion, Bharat and Persia have agreed that a slip fee will not be charged after all; rather, the two have agree that Persia will contribute to Bharati infrastructure development in 1947, in return for full access to all Bharati infrastructure as required.

Other points of interest

Absolutely not one.


Updated Order of Battle, End of Quarter

Completed (Under Repair or Refit) + Under Construction

Heavy Cruisers (CA): 1(0) + 0
Light Cruisers (CL): 2(0) + 0
Destroyers (DD): 12(0) + 0
Torpedo Boats (TB): 9(0) + 0
Motor Torpedo Boats (MTB): 68(0) + 0
Submarines (SS): 9(0) + 0

Gunboats and Gunships (GB/GS): 2(0) + 0
Sloops and Escorts (SL/DE): 10(0) + 0
Coastal Sloops: 0(0) + 1
Submarine Chasers (SC): 18(0) + 0
Patrol Boats (PB): 21(0) + 0
Minesweepers (AM): 10(0) + 0
Harbour Tug (AT): 4(0) + 0

Fast Transports (APD): 2(0) + 0
Tenders (AD): 4(0) + 0
Replenishment Oiler (AOR): 0(0) + 1
LCT: 4(0) + 1
LCM: 13(0) + 0
LCVP: 16(0) + 0[/quote]

2

Tuesday, November 10th 2015, 2:16pm

Persia, Q2 1946

Industrial Allocation

2 factories allocated to building warship material
1 factories allocated to production of infrastructure materials

2,000 t produced + 1,822 t stockpiled - 85 t to Bharat = 3,737 t available
1,151 t used
2,586 t stockpiled
0.1 + 0.0 bonus IP produced.

Infrastructure Development

Continue FD0 at Bushehr: 0.1 IP for 0.2 IP or 0.5 IP required; ongoing.

Construction

At Bushehr (Persian Gulf)
D1: Idle
Free-floating:
Nada

At Bandar-e Abbas (Strait of Hormuz)
S1-A: Idle
S1-B: Idle
S0-A: SL Koloon Bastak laid down, receives 499 t, launched, to complete 8/46
S0-B: LCT-6 laid down, receives 199 t, launched, to complete 8/46
S0-C: Idle
D2.5: Idle
D1: DD Khalij-e Fars undergoes 15% life-extension refit, receives 222 t, completed 6/46
D0: Idle
Free-floating:
SL Paloon Gardan receives 0 t, completed 5/46
LCT-5 receives 0 t, completed 5/46

At Bandar-e Anzali (Caspian Sea)
S1: Idle
D1: SL Zobol undergoes 15% mid-life refit, receives 180 t, completed 6/46

Built in factories

2 x 8 t LCVP built
2 x 35 t LCM built


Transactions:

The Kalpeni-class replenishment oiler Reza Abbasi has been completed in Bharat.

Other points of interest

Absolutely not one.


Updated Order of Battle, End of Quarter

Completed (Under Repair or Refit) + Under Construction

Heavy Cruisers (CA): 1(0) + 0
Light Cruisers (CL): 2(0) + 0
Destroyers (DD): 12(0) + 0
Torpedo Boats (TB): 9(0) + 0
Motor Torpedo Boats (MTB): 68(0) + 0
Submarines (SS): 9(0) + 0

Gunboats and Gunships (GB/GS): 2(0) + 0
Sloops and Escorts (SL/DE): 10(0) + 0
Coastal Sloops: 1(0) + 1
Submarine Chasers (SC): 18(0) + 0
Patrol Boats (PB): 21(0) + 0
Minesweepers (AM): 10(0) + 0
Harbour Tug (AT): 4(0) + 0

Fast Transports (APD): 2(0) + 0
Tenders (AD): 4(0) + 0
Replenishment Oiler (AOR): 0(0) + 1
LCT: 5(0) + 1
LCM: 15(0) + 0
LCVP: 18(0) + 0[/quote][/quote]

3

Tuesday, November 10th 2015, 2:29pm

Persia, Q3 1946

Industrial Allocation

2 factories allocated to building warship material
1 factories allocated to production of infrastructure materials

2,000 t produced + 2,586 t stockpiled - 227 t to Bharat = 4,359 t available
1,417 t used
2,942 t stockpiled
0.1 + 0.0 bonus IP produced.

Infrastructure Development

Continue FD0 at Bushehr: 0.1 IP for 0.3 IP or 0.5 IP required; ongoing.

Construction

At Bushehr (Persian Gulf)
D1: Idle
Free-floating:
Nada

At Bandar-e Abbas (Strait of Hormuz)
S1-A: SL Varevasht laid down, receives 350 t, to complete 5/47
S1-B: Idle
S0-A: SL Sarakchai laid down, receives 499 t, launched, to complete 11/46
S0-B: LCT-7 laid down, receives 199 t, launched, to complete 11/46
S0-C: Idle
D2.5: Idle
D1: DD Dariae Mazenderan undergoes 15% life-extension refit, receives 222 t, completed 9/46
D0: Idle
Free-floating:
SL Koloon Bastak receives 0 t, completed 8/46
LCT-6 receives 0 t, completed 8/46
3 x Kaivan II class sloops undergo 2.5% refits for electronics upgrades: total 66 t
2 x Qom class torpedoboats undergo 2.5% refits for electronics upgrades: total 36 t

At Bandar-e Anzali (Caspian Sea)
S1: Idle
D1: Idle

Built in factories

2 x 8 t LCVP built
2 x 35 t LCM built


Transactions:

A second Kalpeni-class oiler has been laid down in Bharat.

Other points of interest

Absolutely not one.


Updated Order of Battle, End of Quarter

Completed (Under Repair or Refit) + Under Construction

Heavy Cruisers (CA): 1(0) + 0
Light Cruisers (CL): 2(0) + 0
Destroyers (DD): 12(0) + 0
Torpedo Boats (TB): 9(0) + 0
Motor Torpedo Boats (MTB): 68(0) + 0
Submarines (SS): 9(0) + 0

Gunboats and Gunships (GB/GS): 2(0) + 0
Sloops and Escorts (SL/DE): 10(0) + 1
Coastal Sloops: 2(0) + 1
Submarine Chasers (SC): 18(0) + 0
Patrol Boats (PB): 21(0) + 0
Minesweepers (AM): 10(0) + 0
Harbour Tug (AT): 4(0) + 0

Fast Transports (APD): 2(0) + 0
Tenders (AD): 4(0) + 0
Replenishment Oiler (AOR): 1(0) + 0
LCT: 6(0) + 1
LCM: 17(0) + 0
LCVP: 20(0) + 0

4

Tuesday, November 10th 2015, 2:39pm

Persia, Q4 1946

Industrial Allocation

2 factories allocated to building warship material
1 factories allocated to production of infrastructure materials

2,000 t produced + 2,942 t stockpiled - 227 t to Bharat = 4,715 t available
1,589 t used
3,126 t stockpiled
0.1 + 0.1 bonus IP produced.

Infrastructure Development

Continue FD0 at Bushehr: 0.2 IP for 0.5 IP of 0.5 IP required; done.

Construction

At Bushehr (Persian Gulf)
D1: Idle
FD0: Completing construction
Free-floating:
The Mani class gunships undergo 2.5% refits for electronics upgrades, total 330 t

At Bandar-e Abbas (Strait of Hormuz)
S1-A: SL Varevasht receives 350 t, launched, to complete 5/47
S1-B: Idle
S0-A: SL Kharsang laid down, receives 499 t, launched, to complete 2/47
S0-B: LCT-8 laid down, receives 199 t, launched, to complete 2/47
S0-C: Idle
D2.5: Idle
D1: DD Dariae Mazenderan undergoes 15% life-extension refit, receives 222 t, completed 9/46
D0: SS I-5 undergoes 15% refit, receives 62 t, completed.
Free-floating:
SL Sarakchai receives 0 t, completed 11/46
LCT-7 receives 0 t, completed 11/46

At Bandar-e Anzali (Caspian Sea)
S1: Idle
D1: Idle

Built in factories

2 x 8 t LCVP built
2 x 35 t LCM built


Transactions:

A second Kalpeni-class oiler has been laid down in Bharat.

Other points of interest

The Bushehr class torpedoboats on both coasts undergo a 2.5% refit for electronics upgrades: Total 98 t

Updated Order of Battle, End of Quarter

Completed (Under Repair or Refit) + Under Construction

Heavy Cruisers (CA): 1(0) + 0
Light Cruisers (CL): 2(0) + 0
Destroyers (DD): 12(0) + 0
Torpedo Boats (TB): 9(0) + 0
Motor Torpedo Boats (MTB): 68(0) + 0
Submarines (SS): 9(0) + 0

Gunboats and Gunships (GB/GS): 2(0) + 0
Sloops and Escorts (SL/DE): 10(0) + 1
Coastal Sloops: 3(0) + 1
Submarine Chasers (SC): 18(0) + 0
Patrol Boats (PB): 21(0) + 0
Minesweepers (AM): 10(0) + 0
Harbour Tug (AT): 4(0) + 0

Fast Transports (APD): 2(0) + 0
Tenders (AD): 4(0) + 0
Replenishment Oiler (AOR): 1(0) + 1
LCT: 7(0) + 1
LCM: 19(0) + 0
LCVP: 22(0) + 0