You are not logged in.

1

Tuesday, December 16th 2014, 4:06pm

Chile, Q4/1945



Industrial Allocation
- 8/9 factories producing 8,000t materials.
- 1,973 tons from stockpile.
- 352 tons from scrapping
- 10,325 tons materials total.
- 9,048 tons used.
- 2,986 tons stored for Q1/46.
- 1/9 factories dedicated to infrastructure.

Infrastructure Development
1 factory dedicated to infrastructure; produces 0.1 IP + 0.1 bonus IP, which goes to upgrading the Talcahuano S2 into an S2.5.

Naval Construction
ASMAR - Astillero de Talcahuano (Talcahuano):
Class 3.5 Drydock: Light Cruiser Picunches refitting between October 1st 1945 and July 3rd, 1946. 4598 tons required to complete. 1500 tons added Q4/45 for a total of 1500 / 4598 tons. 3098 / 4598 tons remaining.
Class 3.5 Slip: Idle.
Class 2.5 Drydock: Destroyer Nevado Ojos del Salado refitting between October 1st 1945 and December 28th. 1945. 676 tons required to complete. 676 tons added Q4/45 for a total of 676 / 676 tons. 0 / 676 tons remaining. Refit completed.
Class 2 Drydock: Destroyer Nevado Sajama refitting between October 1st 1945 and December 28th. 1945. 676 tons required to complete. 676 tons added Q4/45 for a total of 676 / 676 tons. 0 / 676 tons remaining. Refit completed.
Class 2 Slip: Upgrading to S2.5. 0.3 of 0.5 IP added.
Class 1 Slip: Barcaza M-300 B2 laid down October 1st, 1945. 260 tons required to complete. 260 tons added Q4/45 for a total of 260 / 260 tons. 0 / 260 tons remaining. Launched November 21st, 1945. Completed February 7th, 1946.
Class 0 Drydock: Idle.

Dockside:
- PA-04 Patria laid down July 1st, 1944. 2,200 tons added Q3/45 for a total of 13200 / 20000 tons. 6800 / 20000 tons remaining. Ship launched June 18th, 1945 and completed on December 1st, 1946.
- CP-05 O'Higgins laid down April 1st, 1944. 125 tons added Q4/45 for a total of 14525 / 14525 tons. 0 / 14525 tons remaining. Ship launched on January 15th, 1945. Ship completed on February 6th, 1946.
- Dock landing ship Disembarkment of Pisagua laid down April 2nd, 1945. 5250 tons required. 1100 tons added Q3/1945 for a total of 3300 / 5250. 1950 / 5250 tons remaining until completion. Ship launched September 21st, 1945 and completed on June 8th, 1946.

ASMAR - Astillero de Valparaíso (Valparaiso):
Class 1 Slip: Idle.
Class 1 Slip: Idle.
Class 1 Drydock: Destroyer Serrano refitting between October 1st 1945 and December 19th. 1945. 362 tons required to complete. 362 tons added Q4/45 for a total of 362 / 362 tons. 0 / 362 tons remaining. Refit completed.

Dockside:
- Fleet submarine Marlin (SO-04) laid down January 1st, 1945. 0 tons added Q4/45 for a total of 1650 / 1650 tons. 0 tons remaining. Ship launched May 8th, 1945. Ship completed on November 20th, 1945.
- Fleet submarine Esturión (SO-05) laid down January 1st, 1945. 0 tons added Q4/45 for a total of 1650 / 1650 tons. 0 tons remaining. Ship launched May 8th, 1945. Ship completed on November 20th, 1945.
- Fleet submarine Bonito (SO-06) laid down January 1st, 1945. 0 tons added Q4/45 for a total of 1650 / 1650 tons. 0 tons remaining. Ship launched May 8th, 1945. Ship completed on November 20th, 1945.

ASENAV/Astillero de Alberto Daiber y Cia (Valdivia):
Class 0 Slip: Light minesweeper YDM-16 laid down October 1st, 1945. 190 tons added Q4/1945 for a total of 190 / 190. Completed and launched on October 31st, 1945.
Class 0 Slip: Submarine chaser Tinguiririca laid down October 1st, 1945. 250 tons added Q4/1945 for a total of 250 / 250. Ship launched November 20th, 1945. Ship will complete on February 8th, 1946.

Dockside:
- Submarine chaser Pascua laid down July 1st, 1945. 0 tons added Q4/1945 for a total of 250 / 250. Ship launched August 20th, 1945. Ship will complete on November 8th, 1945.

ASMAR - Astillerode Magallanes (Punta Arenas):
Class 0 Drydock: Idle.

Dockside:
None

from factories:
- N/A

On Trials
- DE-31 Litton completes six months of builders trials.
- DE-32 Salinas continues six months of builders trials.
- Submarine Marlin begins six months of builders trials.
- Submarine Esturión begins six months of builders trials.
- Submarine Bonito begins six months of builders trials.
- Subchaser Itata completes three months of builder's trials.
- Subchaser Pascua begins three months of builder's trials.

Scrapping
- Total tonnage in recycling until Q3/45: (2x152) + (2x179) = 662 tons
- Total tonnage in recycling until Q4/45: (2x179) = 352 tons
- Total tonnage in recycling until Q1/46: (2x179) = 352 tons
- Total tonnage in recycling until Q2/46: (4x179) = 716 tons

Transactions
None

Other Notes
Technology development and investigatory committees are working on the following projects:
- Proyecto-M: Light Antiaircraft Cruiser prepared for January 1946 keel-laying.

Six destroyers (Reserve Hull 011 through Reserve Hull 016) are disarmed and parked in Talcahuano awaiting free drydocks for scrapping.

Order of Battle (Armada de Chile) December 31st, 1945
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Primary Combatants:
Battlecruisers: 3(0)+0
Aircraft Carriers: 3(0)+1
Heavy Cruiser: 2(0)+1
Light Cruisers: 6(0)+0
Helicopter Cruisers: 1(0)+0
Large Destroyers: 8(0)+0 {3,000 tons std and up}
Medium Destroyers: 50(0)+0 {1,200-3,000 tons std}
Light Destroyers (Corvettes): 8(0)+0 {under 1,200 tons std}
Destroyer Escorts: 14(0)+0
Minelayer: 2(0)+0
Torpedo Boats: 25(0)+0
Submarines: 11(0)+0
Subchasers: 19(0)+1
Minesweepers: 27(0)+0
Arctic Patrol Vessel: 3(0)+0

Fleet Train:
Destroyer Tenders: 4(0)+0
Subchaser Tenders: 2(0)+0
Submarine Tenders: 1(0)+0
General Fleet Tenders: 4(0)+0
Fleet Oilers: 12(0)+0
Colliers: 1(0)+0

Auxiliaries:
Sail Training Sloop: 2(0)+0
Transports: 2(0)+0
Fleet Tugs: 4(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 2(0)+0
Oceanic Research Ship: 1(0)+0
Pilot Boats: 6(0)+0
Training Yawls: 6(0)+0

Amphibious Forces:
Landing Ship Vehicle: 1(0)+0
Landing Ship Dock: 0(0)+1
Beach Discharge Lighter: 1(0)+0
Attack Transports: 4(0)+0
Landing Ship Infantry (Med): 2(0)+0
Landing Ship Tank: 2(0)+0
Landing Ship Mechanized: 2(0)+0
Landing Craft Tank: 0(0)+0
Landing Craft Mechanized: 11(0)+0
Landing Craft Assault: 54(0)+0

Emergency Use:
Patrol Boats: 4(0)+0
Naval Trawlers: 16(0)+0
Transports: 12(0)+0
Museum Ships: 1(0)+0

Foreign Orders and Exports (Totals):
Fleet Tugs: 6(0)+0 (to China)
Light Harbour Tugs: 20(0)+0 (to China)

2

Tuesday, December 16th 2014, 4:30pm

The factory would also be producing a bonus 0.1 IP, right?

3

Tuesday, December 16th 2014, 4:56pm

The factory would also be producing a bonus 0.1 IP, right?

Derp! Fixed.

...and I was watching for that, too. :(