Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, October 19th 2014, 10:56pm

German Naval Construction Programme, Third Quarter, 1945

German Naval Construction Programme, Third Quarter, 1945

A. Factories

Factories: 31
Available: 31
Producing Warship Material: 29
Tonnage Produced: 29,000
Producing Infrastructure (Committed): 2
Producing Infrastructure (Non - Committed):
Infrastructure Points Produced: 0.2
Bonus IP for Committed Factories: 0.0
Total IP Available: 0.2

Tonnage Produced: 29,000
Tonnage Transferred In:
Tonnage Received in Payment: 1,800
Tonnage Reclaimed From Scrap: 620
Tonnage Previously Stockpiled: 9,268
Total Tonnage Available: 40,688
Tonnage Transferred Out:
Tonnage Paid:
Tonnage Used in Construction: 28,212
Tonnage Remaining for Stockpile: 12,476


B. Infrastructure Development

Infrastructure Project -:- IP Req -:- IP Added -:- IP To Date -:- IP Remain
Expand Kiel S3 from Type 1.0 to Type 2.0 -:- 1.00 -:- 0.20 -:- 0.60 -:- 0.40


C. Naval Development and Construction

Bremerhaven

Dock Nr.1 – Type 3.0 – Idle

Slip Nr.1 - Type 3.0 – Idle

Slip Nr.2 – Type 1.0 – Destroyer Burbach – Laid down 1 July 1945; requires 2,200 tons; 0 tons previously consumed; receives 550 tons; 1,650 tons remaining

Slip Nr.3 – Type 1.0 – Destroyer Freudenberg – Laid down 1 July 1945; requires 2,200 tons; 0 tons previously consumed; receives 550 tons; 1,650 tons remaining

Pierside:

Aircraft carrier Karl der Große – Launched 19 December 1944; requires 18,764 tons; 12,060 tons previously consumed; receives 2,010 tons; 4,694 tons remaining

Destroyer Allenstein – Launched 15 May 1945; requires 2,200 tons; 1,100 tons previously consumed; receives 550 tons; 550 tons remaining

Destroyer Hirschberg – Launched 15 May 1945; requires 2,200 tons; 1,100 tons previously consumed; receives 550 tons; 550 tons remaining


Cuxhaven

Dock Nr.1 - Type 4.0 – Idle

Dock Nr.2 - Type 2.0 – Idle

Slip Nr.1 – Type 4.0 – Idle

Slip Nr.2 – Type 2.0 – Idle

Slip Nr.3 – Type 1.0 – Destroyer Heubach – Laid down 1 July 1945; requires 2,200 tons; 0 tons previously consumed; receives 550 tons; 1,650 tons remaining

Slip Nr.4 – Type 1.0 – Destroyer Insterberg – Laid down 1 July 1945; requires 2,200 tons; 0 tons previously consumed; receives 550 tons; 1,650 tons remaining

Pierside:

Aircraft carrier Friedrich Barbarossa – Launched 19 December 1944; requires 18,764 tons; 12,060 tons previously consumed; receives 2,010 tons; 4,694 tons remaining

Destroyer Gumbinnen – Launched 15 May 1945; requires 2,200 tons; 1,100 tons previously consumed; receives 550 tons; 550 tons remaining

Destroyer Schweidnitz – Launched 15 May 1945; requires 2,200 tons; 1,100 tons previously consumed; receives 550 tons; 550 tons remaining


Hamburg

Slip Nr.1 – Type 2.0 – Submarine Walfisch – Laid down 1 July 1945; requires 1,720 tons, 0 tons previously consumed; receives 440 tons, 1,280 tons remaining

Slip Nr.2 – Type 2.0 – Submarine Neunaugen – Laid down 1 July 1945; requires 1,720 tons, 0 tons previously consumed; receives 440 tons, 1,280 tons remaining

Slip Nr.3 – Type 1.0 – Idle

Slip Nr.4 – Type 1.0 – Idle

Pierside

Submarine Store – Launched 11 May 1945; requires 1,720 tons, 880 tons previously consumed; receives 440 tons, 400 tons remaining

Submarine Tarpune – Launched 11 May 1945; requires 1,720 tons, 880 tons previously consumed; receives 440 tons, 400 tons remaining

Buoy Tender Dänholm – Launched 3 May 1945; requires 1,105 tons, 560 tons previously consumed; receives 280 tons, 265 tons remaining

Buoy Tender Mährens – Launched 3 May 1945; requires 1,105 tons, 560 tons previously consumed; receives 280 tons, 265 tons remaining


Kiel

Dock Nr.1 – Type 4.0 – Aircraft Carrier Tegetthoff; Laid down 1 January 1945; requires 28,194 tons, 4,680 tons previously consumed; receives 2,340 tons, 21,174 tons remaining

Dock Nr.2 – Type 2.5 – Light Cruiser Stettin; Laid down 1 January 1945; requires 10,500 tons, 3,020 tons previously consumed; receives 1,510 tons, 6,020 tons remaining; Launched 8 September 1945

Dock Nr.3 – Type 2.0 – Idle

Dock Nr.4 – Type 0.0 – Idle

Slip Nr.1 – Type 4.0 – Aircraft Carrier Zeiten; Laid down 1 January 1945; requires 28,194 tons, 4,680 tons previously consumed; receives 2,340 tons, 21,174 tons remaining

Slip Nr.2 - Type 3.0 – Light Cruiser Regensburg; Laid down 1 July 1945; requires 10,500 tons, 0 tons previously consumed; receives 1,510 tons, 9,040 tons remaining

Slip Nr.3 – Type 1.0 – Expanding to Type 2.0

Slip Nr.4 – Type 1.0 – Submarine Lotsenfisch – Laid down 1 July 1945; requires 1,720 tons, 0 tons previously consumed; receives 440 tons, 1,280 tons remaining

Slip Nr.5 – Type 1.0 – Submarine Makrele – Laid down 1 July 1945; requires 1,720 tons, 0 tons previously consumed; receives 440 tons, 1,280 tons remaining

Pierside

Light Cruiser Dresden – Launched 7 September 1944; requires 10,500 tons, 9,060 tons previously consumed; receives 1,490 tons, 0 tons remaining; Completed 8 August 1945 and commences trials

Light Cruiser Stuttgart – Launched 9 March 1945; requires 10,500 tons, 6,040 tons previously consumed; receives 1,510 tons, 3,000 tons remaining

Submarine Schwertfisch – Launched 11 May 1945; requires 1,720 tons, 880 tons previously consumed; receives 440 tons, 400 tons remaining

Submarine Forellen – Launched 11 May 1945; requires 1,720 tons, 880 tons previously consumed; receives 440 tons, 400 tons remaining


Wilhelmshaven

Dock Nr.1 - Type 3.0 – Idle

Dock Nr.2 – Type 0.0 – Idle

Slip Nr.1 – Type 1.0 – Idle

Slip Nr.2 – Type 0.5 – Submarine Brasche – Laid down 1 July 1945; requires 1,720 tons, 0 tons previously consumed; receives 440 tons, 1,280 tons remaining

Slip Nr.3 – Type 0.5 – Submarine Schellfisch – Laid down 1 July 1945; requires 1,720 tons, 0 tons previously consumed; receives 440 tons, 1,280 tons remaining


Pierside:

Submarine Haifisch – Launched 11 May 1945; requires 1,720 tons, 880 tons previously consumed; receives 440 tons, 400 tons remaining

Submarine Speerfisch – Launched 11 May 1945; requires 1,720 tons, 880 tons previously consumed; receives 440 tons, 400 tons remaining


Vienna:

Dock Nr.1 – Type 0.0 – Idle

Slip Nr.1 – Type 0.0 – Idle


Memel:

Dock Nr.1 – Type 1.0 – Corvette Drache – Laid down 1 July 1945; requires 1,000 tons, 0 tons previously consumed; receives 270 tons, 730 tons remaining

Slip Nr.1 – Type 1.0 – Corvette Kormoran – Laid down 1 July 1945; requires 1,000 tons, 0 tons previously consumed; receives 270 tons, 730 tons remaining

Slip Nr.2 – Type 0.0 – Idle

Slip Nr.3 – Type 0.0 – Idle

Pierside:

Corvette Albatros – Launched 3 May 1945; requires 1,000 tons, 540 tons previously consumed; receives 270 tons, 190 tons remaining

Corvette Mowe – Launched 3 May 1945; requires 1,000 tons, 540 tons previously consumed; receives 270 tons, 190 tons remaining


Flensburg:

Slip Nr.1 – Type 1.0 – Corvette Bussard – Laid down 1 April 1945; requires 1,000 tons, 270 tons previously consumed; receives 270 tons, 460 tons remaining; Launched 1 August 1945

Slip Nr.2 – Type 1.0 – Corvette Grief – Laid down 1 April 1945; requires 1,000 tons, 270 tons previously consumed; receives 270 tons, 460 tons remaining; Launched 1 August 1945

Floating Dock Nr.1 – Type 1.0 – Idle


Small Craft Construction Programme

None


Refits and Conversion Programme

Conversion of Fleet Oiler Burgenland – Conversion commenced 1 July 1945; requires 1,548 tons, 0 tons previously consumed; receives 774 tons, 774 tons remaining

Conversion of Fleet Tender Albrecht von Stosch– Conversion commenced 1 July 1945; requires 1,715 tons, 0 tons previously consumed; receives 858 tons, 857tons remaining


D. Transactions

Third and final payment of 1,800 tons from Turkey for six schwere zerstörer of the Lebrecht Maas class


E. Other Notes

Ships Laid Down This Quarter

At Bremerhaven – Destroyer Burbach, Destroyer Freudenberg
At Cuxhaven – Destroyer Heubach, Destroyer Insterberg
At Hamburg – Submarine Walfisch, Submarine Neunaugen
At Kiel – Light Cruiser Regensburg, Submarine Lotsenfisch, Submarine Makrele
At Wilhelmshaven – Submarine Brasche, Submarine Schellfisch
At Memel – Corvette Drache, Corvette Kormoran

Ships Launched This Quarter

At Kiel – Light Cruiser Stettin
At Memel – Corvette Bussard, Corvette Grief

Ships Completed This Quarter

At Kiel – Light Cruiser Dresden

Refits/Conversions Completed This Quarter

None

Ships Undergoing Trials This Quarter

(First three-months)

Aircraft Carrier Großer Kurfürst
Aircraft Carrier Friedrich der Große

Frigate Gromitz
Frigate Rangersdorf
Frigate Großpetersdorf
Frigate Sulzbach

Minesweeper Hallstättersee
Minesweeper Wörthersee

Ships Completing Trials This Quarter

None

F. Scrappage Report

None


G. Other Disposals

None


Updated Order of Battle

Type : In Service + Trials + Building + Converting + Refitting = Total
Schlachtschiff : 8 + 0 + 0 + 0 + 0 = 8
Schlachtkreuzer : 4 + 0 + 0 + 0 + 0 = 4
Flugzeugträger : 7 + 2 + 4 + 0 + 0 = 13
Schwere Kreuzer : 4 + 0 + 0 + 0 + 0 = 4
Leichte Kreuzer : 16 + 1 + 3 + 0 + 0 = 20
Schwere Zerstörer : 6 + 0 + 0 + 0 + 0 = 6
Zerstörer : 72 + 0 + 8 + 0 + 0 = 80
Mehrzweckfregatten : 12 + 4 + 0 + 0 + 0 = 16
Inspektionsschiffen : 2 + 0 + 0 + 0 + 0 = 2
Geleitkorvetten : 24 + 0 + 6 + 0 + 0 = 30
Underseeboote : 34 + 0 + 12 + 0 + 0 = 46
Leichte Minenschiffe : 12 + 0 + 0 + 0 + 0 = 12
Minensuchboote : 30 + 2 + 0 + 0 + 0 = 32
Minenräumboote : 16 + 0 + 0 + 0 + 0 = 16
Mehrzweckboot : 4 + 0 + 0 + 0 + 0 = 4
Schnelleboote : 50 + 0 + 0 + 0 + 0 = 50
Flusskanonenboote : 2 + 0 + 0 + 0 + 0 = 2
Fluss-Patrouillenboote : 6 + 0 + 0 + 0 + 0 = 6
Schnellboot-Begleitschiffe : 4 + 0 + 0 + 0 + 0 = 4
U-boot-Begleitschiffe : 4 + 0 + 0 + 0 + 0 = 4
Flotten-Begleitschiffe : 5 + 0 + 0 + 1 + 0 = 6
Einsatzgruppenversorgungsschiff : 6 + 0 + 0 + 0 + 0 = 6
Flottentanker : 19 + 0 + 0 + 1 + 0 = 20
Flottenversorgungsschiff : 4 + 0 + 0 + 0 + 0 = 4
Werkstattschiffe : 2 + 0 + 0 + 0 + 0 = 2
Vorratsschiffe : 2 + 0 + 0 + 0 + 0 = 2
Munitionstransportschiff : 2 + 0 + 0 + 0 + 0 = 2
Versorgnungstransportschiff : 2 + 0 + 0 + 0 + 0 = 2
Minentransporter : 1 + 0 + 0 + 0 + 0 = 1
Begleit und Werkstattschiff : 2 + 0 + 0 + 0 + 0 = 2
Reparaturschiff : 2 + 0 + 0 + 0 + 0 = 2
Vermessungsschiff : 2 + 0 + 0 + 0 + 0 = 2
Eisbrecher : 2 + 0 + 0 + 0 + 0 = 2
Tonnenleger : 0 + 0 + 2 + 0 + 0 = 2
Netzleger : 8 + 0 + 0 + 0 + 0 = 8
Hochseeschlepper : 4 + 0 + 0 + 0 + 0 = 4
Bergungsschlepper : 4 + 0 + 0 + 0 + 0 = 4
Hafenschlepper : 4 + 0 + 0 + 0 + 0 = 4
Amphibische Transportschiffe : 10 + 0 + 0 + 0 + 0 = 10
Landungstransportschiff : 8 + 0 + 0 + 0 + 0 = 8
Sturm Landungsboot : 148 + 0 + 0 + 0 + 0 = 148
Pionier Landungsboot : 46 + 0 + 0 + 0 + 0 = 46
Marine Fahrprahm Typ 1941 : 8 + 0 + 0 + 0 + 0 = 8
Hafensucheboote Typ 1941 : 24 + 0 + 0 + 0 + 0 = 24
Pionier Motor Launch Typ 1941 : 20 + 0 + 0 + 0 + 0 = 20
Flieger-schuleschiffe : 1 + 0 + 0 + 0 + 0 = 1
Artillerie-schuleschiffe : 2 + 0 + 0 + 0 + 0 = 2
Segel-schuleschiffe : 2 + 0 + 0 + 0 + 0 = 2
Zielschiffe : 1 + 0 + 0 + 0 + 0 = 1
Hafen-schuleschiffe : 1 + 0 + 0 + 0 + 0 = 1