You are not logged in.

1

Monday, September 22nd 2014, 3:07am

Russia, Q4/1944



Report for Q4/1944
Industrial Allocation
- 33 / 33 factories producing 33,000t materials.
- 0/33 factories producing infrastructure
- 10,425t from stockpile.
- 0t from transactions.
- 5,494t from scrapping.
- 48,919t materials total.
- 39,184t used.
- 9,735t stored for Q1/45.

Infrastructure Development
None

Naval Construction

Petrograd: Almaz Shipbuilding Company, Sudomekh Shipyard No. 196, Severnaya Verf No.190, and Baltic Shipyard No.189
Class 4 Slip #1 - Idle.
Class 4 Slip #2 - Idle.
Class 4 Slip #3 - Idle.
Class 4 Slip #4 - Idle.
Class 3 Slip #1 - Idle.
Class 3 Slip #2 - Idle.
Class 3 Slip #3 - Idle.
Class 3 Slip #4 - Idle.
Class 3 Slip #5 - Idle.
Class 3 Slip #6 - Idle.
Class 1 Slip #1 - Soobrazitelny-class (Project 69) destroyer Bystry laid down July 1st, 1944. 1,945 tons required. 500 tons added Q4/1944 for a total of 1000 / 1945. 945 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
Class 1 Slip #2 - Soobrazitelny-class (Project 69) destroyer Soznatelnyy laid down July 1st, 1944. 1,945 tons required. 500 tons added Q4/1944 for a total of 1000 / 1945. 945 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
Class 1 Slip #3 - Soobrazitelny-class (Project 69) destroyer Burlivyy laid down July 1st, 1944. 1,945 tons required. 500 tons added Q4/1944 for a total of 1000 / 1945. 945 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
Class 1 Slip #4 - Soobrazitelny-class (Project 69) destroyer Besstrashniy laid down July 1st, 1944. 1,945 tons required. 500 tons added Q4/1944 for a total of 1000 / 1945. 945 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
Class 0 Slip #1 - Idle.
Class 0 Slip #2 - Idle.
Class 0 Slip #3 - Idle.
Class 0 Slip #4 - Idle.

Dockside:
- Battlecruiser Rostislav (Project 65) laid down January 1st, 1942. 48,000 tons required. 3000 tons added in Q4/1944 for a total of 27000 / 48000 tons. 21000 / 48000 tons remaining. Launched February 15th, 1944. Completed July 21st, 1946.
- Battlecruiser Potemkin (Project 65) laid down January 1st, 1942. 48,000 tons required. 3000 tons added in Q4/1944 for a total of 27000 / 48000 tons. 21000 / 48000 tons remaining. Launched February 15th, 1944. Completed July 21st, 1946.
- Battlecruiser Georgii Pobedonosets (Project 65) laid down January 1st, 1942. 48,000 tons required. 0 tons added in Q4/1944 for a total of 21000 / 48000 tons. 21000 / 48000 tons remaining. Launched February 15th, 1944. Completed July 21st, 1946.
- Battlecruiser Retvizan (Project 65) laid down January 1st, 1942. 48,000 tons required. 3000 tons added in Q4/1944 for a total of 30000 / 48000 tons. 18000 / 48000 tons remaining. Launched February 15th, 1944. Completed July 21st, 1946.
- Aircraft carrier Afonskoye (Project 67) laid down January 1st, 1943. 22,791 tons required. 3000 tons added in Q4/1944 for a total of 15000 / 22791 tons. 7791 / 22791 tons remaining. Launched June 30th, 1944. Completed September 12th, 1945.
- Kola-class tanker Kola laid down January 1st, 1943. 9505 tons required. 1182 tons added in Q4/1944 for a total of 9505 / 9505 tons. 0 / 9505 tons remaining. Launched August 13th, 1943. Completed October 16th, 1944.
- Kola-class tanker Novaya Zemlya laid down January 1st, 1943. 9505 tons required. 1182 tons added in Q4/1944 for a total of 9505 / 9505 tons. 0 / 9505 tons remaining. Launched August 13th, 1943. Completed October 16th, 1944.
- Icebreaker Angara (Project 62) laid down January 1st, 1943. 13469 tons required. 1653 tons added in Q4/1944 for a total of 13469 / 13469 tons. 0 / 13469 tons remaining. Launched October 1st, 1943. Completed November 14th, 1944.
- Project 73 "Obsidian" type frigate SKR-01 laid down January 1st, 1944. 1,050 tons required. 150 tons added Q4/1944 for a total of 1050 / 1050. 0 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
- Project 73 "Obsidian" type frigate SKR-02 laid down January 1st, 1944. 1,050 tons required. 150 tons added Q4/1944 for a total of 1050 / 1050. 0 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
- Project 73 "Obsidian" type frigate SKR-03 laid down January 1st, 1944. 1,050 tons required. 150 tons added Q4/1944 for a total of 1050 / 1050. 0 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
- Project 73 "Obsidian" type frigate SKR-04 laid down January 1st, 1944. 1,050 tons required. 150 tons added Q4/1944 for a total of 1050 / 1050. 0 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
- Gostinitsa-class (Project 61) patrol boat #51 laid down July 1st, 1944. 222 tons required. 0 tons added in Q4/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.
- Gostinitsa-class (Project 61) patrol boat #52 laid down July 1st, 1944. 222 tons required. 0 tons added in Q4/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.
- Gostinitsa-class (Project 61) patrol boat #53 laid down July 1st, 1944. 222 tons required. 0 tons added in Q4/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.
- Gostinitsa-class (Project 61) patrol boat #54 laid down July 1st, 1944. 222 tons required. 0 tons added in Q4/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.

Kronshtadt: Admiralty Shipyard No.194
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.

Dockside:
- Harbor icebreaker Gavrila Derzhavin (Project 74) laid down April 1st, 1944. 1496 tons required. 400 tons added in Q4/1944 for a total of 1200 / 1496 tons. 296 / 1496 tons remaining. Laid down April 1st, 1944. Launched August 6th, 1944. Completed February 14th, 1945.

Tallinn: Admiralty Shipyard Tallinn
Class 3 Drydock #1 - Idle.
Class 3 Drydock #2 - Idle.
Class 3 Drydock #3 - Idle.
Class 3 Drydock #4 - Idle.
Class 1 Drydock #1 - Idle.

Dockside:
- Harbor icebreaker Alexander Bestuzhev (Project 74) laid down April 1st, 1944. 1496 tons required. 400 tons added in Q4/1944 for a total of 1200 / 1496 tons. 296 / 1496 tons remaining. Laid down April 1st, 1944. Launched August 6th, 1944. Completed February 14th, 1945.

Arkhangelsk: Severnoye Mashinostroitelnoye Predpriyatie (Sevmash No.402) and Zvezdochka Shipyard
Class 4.5 Slip #1 - Aircraft Carrier Reval (Project 65) laid down January 1st, 1944. 49,854 tons required. 2500 tons added in Q4/1944 for a total of 10000 / 49854 tons. 39854 / 49854 tons remaining. Launched December 17th, 1945. Completed November 27th, 1948.
Class 2 Slip #1 - Smolensk-class (Project 70) torpedo cruiser Volgograd laid down July 1st, 1944. 3,475 tons required. 1,000 tons added Q4/1944 for a total of 2000 / 3475. 1475 / 3475 tons remaining until completion. Launched November 30th, 1944. Completed July 15th, 1945.
Class 2 Slip #2 - Smolensk-class (Project 70) torpedo cruiser Pskov laid down July 1st, 1944. 3,475 tons required. 1,000 tons added Q4/1944 for a total of 2000 / 3475. 1475 / 3475 tons remaining until completion. Launched November 30th, 1944. Completed July 15th, 1945.
Class 2 Slip #3 - Smolensk-class (Project 70) torpedo cruiser Odessa laid down July 1st, 1944. 3,475 tons required. 1,000 tons added Q4/1944 for a total of 2000 / 3475. 1475 / 3475 tons remaining until completion. Launched November 30th, 1944. Completed July 15th, 1945.
Class 2 Slip #4 - Idle.
Class 2 Slip #5 - Idle.
Class 2 Slip #6 - Idle.
Class 1 Slip #1 - Project 73 "Obsidian" type frigate SKR-09 laid down July 1st, 1944. 1,050 tons required. 300 tons added Q4/1944 for a total of 600 / 1050. 450 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
Class 1 Slip #2 - Project 73 "Obsidian" type frigate SKR-10 laid down July 1st, 1944. 1,050 tons required. 300 tons added Q4/1944 for a total of 600 / 1050. 450 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
Class 1 Slip #3 - Project 73 "Obsidian" type frigate SKR-11 laid down July 1st, 1944. 1,050 tons required. 300 tons added Q4/1944 for a total of 600 / 1050. 450 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
Class 1 Slip #4 - Project 73 "Obsidian" type frigate SKR-12 laid down July 1st, 1944. 1,050 tons required. 300 tons added Q4/1944 for a total of 600 / 1050. 450 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
Class 0 Slip #1 - Idle.
Class 0 Slip #2 - Idle.

Dockside:
- Smolensk-class (Project 70) torpedo cruiser Smolensk laid down January 1st, 1944. 3,475 tons required. 475 tons added Q4/1944 for a total of 3475 / 3475. 0 / 3475 tons remaining until completion. Launched May 31st, 1944. Completed January 15th, 1945.
- Smolensk-class (Project 70) torpedo cruiser Mykolaiv laid down January 1st, 1944. 3,475 tons required. 475 tons added Q4/1944 for a total of 3475 / 3475. 0 / 3475 tons remaining until completion. Launched May 31st, 1944. Completed January 15th, 1945.
- Smolensk-class (Project 70) torpedo cruiser Kronstadt laid down January 1st, 1944. 3,475 tons required. 475 tons added Q4/1944 for a total of 3475 / 3475. 0 / 3475 tons remaining until completion. Launched May 31st, 1944. Completed January 15th, 1945.
- Soobrazitelny-class (Project 69) destroyer Soobrazitelny laid down January 1st, 1944. 1,945 tons required. 445 tons added Q4/1944 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched May 12th, 1944. Completed November 28th, 1944.
- Soobrazitelny-class (Project 69) destroyer Rezvy laid down January 1st, 1944. 1,945 tons required. 445 tons added Q4/1944 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched May 12th, 1944. Completed November 28th, 1944.
- Soobrazitelny-class (Project 69) destroyer Strashnyi laid down January 1st, 1944. 1,945 tons required. 445 tons added Q4/1944 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched May 12th, 1944. Completed November 28th, 1944.
- Soobrazitelny-class destroyer Smeliy laid down January 1st, 1944. 1,945 tons required. 445 tons added Q4/1944 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched May 12th, 1944. Completed November 28th, 1944.
- Gostinitsa-class (Project 61) patrol boat #55 laid down July 1st, 1944. 222 tons required. 0 tons added in Q4/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.
- Gostinitsa-class (Project 61) patrol boat #56 laid down July 1st, 1944. 222 tons required. 0 tons added in Q4/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down July 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.

Murmansk: Shipyard #10 Polyarny, "Shkval"
Class 4.5 Drydock #1 - Idle.
Class 3 Drydock #1 - Idle.
Class 3 Drydock #2 - Minsk-class torpedo cruiser Bryansk undergoing reconstruction. 626 tons required. 626 tons added Q4/1944 for a total of 626 / 626. 0 / 626 tons remaining until completion. Reconstruction requires 2.4 months.
Class 2 Drydock #1 - Minsk-class torpedo cruiser Irkutsk undergoing reconstruction. 626 tons required. 626 tons added Q4/1944 for a total of 626 / 626. 0 / 626 tons remaining until completion. Reconstruction requires 2.4 months.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.
Class 0 Drydock #2 - Idle.

Dockside:
None

Rostov-on-Don: Black Sea Shipyard, Rostov-on-Don
Class 3 Slip #1 - Idle.
Class 1 Slip #1 - Project 73 "Obsidian" type frigate SKR-07 laid down July 1st, 1944. 1,050 tons required. 300 tons added Q4/1944 for a total of 600 / 1050. 450 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
Class 1 Slip #2 - Project 73 "Obsidian" type frigate SKR-08 laid down July 1st, 1944. 1,050 tons required. 300 tons added Q4/1944 for a total of 600 / 1050. 450 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
Class 0 Slip #1 - Gostinitsa-class (Project 61) patrol boat #57 laid down July 1st, 1944. 222 tons required. 0 tons added in Q2/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down January 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.
Class 0 Slip #2 - Gostinitsa-class (Project 61) patrol boat #58 laid down July 1st, 1944. 222 tons required. 0 tons added in Q2/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down January 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.

Dockside:
- Project 73 "Obsidian" type frigate SKR-05 laid down January 1st, 1944. 1,050 tons required. 150 tons added Q4/1944 for a total of 1050 / 1050. 0 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.
- Project 73 "Obsidian" type frigate SKR-06 laid down January 1st, 1944. 1,050 tons required. 150 tons added Q4/1944 for a total of 1050 / 1050. 0 / 1050 tons remaining until completion. Launched May 1st, 1944. Completed November 2nd, 1944.

Sevastopol: Sevastopol Shipyard No.201, Sevastopol
Class 3 Drydock #1 - Moskva-class torpedo cruiser Orel undergoing reconstruction. 610 tons required. 610 tons added Q4/1944 for a total of 610 / 610. 0 / 610 tons remaining until completion. Reconstruction requires 2.4 months.
Class 2 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.

Dockside:
None

Astrakhan: Admiralty Shipyard No.39, Astrakhan
Class 1 Drydock #1 - Idle.

Dockside:
None

Vladivostok: Dalzavod Yard, Vladivostok, Zvezda Shipyard, Bolshoy Kamen, and Amur Shipbuilding Plant, Komsolosk-on-Amur
Class 4.5 Drydock #1 - Idle.
Class 1 Drydock #1 - Idle.
Class 1 Drydock #2 - Idle.
Class 0 Drydock #1 - Idle.
Class 4.5 Slip #1 - Aircraft Carrier Rymnik (Project 65) laid down January 1st, 1944. 49,854 tons required. 2500 tons added in Q4/1944 for a total of 10000 / 49854 tons. 39854 / 49854 tons remaining. Launched December 17th, 1945. Completed November 27th, 1948.
Class 1 Slip #1 - Soobrazitelny-class (Project 69) destroyer Razumny laid down July 1st, 1944. 1,945 tons required. 500 tons added Q4/1944 for a total of 1000 / 1945. 945 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
Class 1 Slip #2 - Soobrazitelny-class (Project 69) destroyer Provorny laid down July 1st, 1944. 1,945 tons required. 500 tons added Q4/1944 for a total of 1000 / 1945. 945 / 1945 tons remaining until completion. Launched November 11th, 1944. Completed May 28th, 1945.
Class 0 Slip #1 - Idle.
Class 0 Slip #2 - Idle.

Dockside:
- Soobrazitelny-class (Project 69) destroyer Rekordny laid down January 1st, 1944. 1,945 tons required. 445 tons added Q4/1944 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched May 12th, 1944. Completed November 28th, 1944.
- Soobrazitelny-class (Project 69) destroyer Blestyashchyy laid down January 1st, 1944. 1,945 tons required. 445 tons added Q4/1944 for a total of 1945 / 1945. 0 / 1945 tons remaining until completion. Launched May 12th, 1944. Completed November 28th, 1944.
- Gostinitsa-class (Project 61) patrol boat #59 laid down July 1st, 1944. 222 tons required. 0 tons added in Q2/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down January 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.
- Gostinitsa-class (Project 61) patrol boat #60 laid down July 1st, 1944. 222 tons required. 0 tons added in Q2/1944 for a total of 222 / 222 tons. 0 / 222 tons remaining. Laid down January 1st, 1944. Launched August 20th, 1944. Completed November 7th, 1944.

Petropavlovsk-Kamchatsky: Kamchatsky Shipyard No.49 "Gornyak"
Class 3 Drydock #1 - Kiev-class torpedo cruiser Perekop undergoing reconstruction. 570 tons required. 570 tons added Q4/1944 for a total of 570 / 570. 0 / 570 tons remaining until completion. Reconstruction requires 2.4 months.
Class 1 Drydock #1 - Idle.
Class 0 Drydock #1 - Idle.

Dockside:
None

Cam Ranh Bay (Indochina): Admiralty Shipyard No.191 "Alyans"
Class 4 Drydock #1 - Kiev-class torpedo cruiser Magadan undergoing reconstruction. 570 tons required. 570 tons added Q4/1944 for a total of 570 / 570. 0 / 570 tons remaining until completion. Reconstruction requires 2.4 months.
Class 1 Drydock #1 - Idle.
Class 1 Drydock #2 - Idle.

Dockside:
None

From Factories
- 3 Levkov L-11 fast attack craft constructed for 30 tons each and delivered to the trials and testing unit on the Sea of Azov.
- 10 Project 71 "Gematit" class coastal minesweepers constructed for 148 tons apiece.

Transactions
None

Scrapping Report
- 4 Admiral Lazarev-class cruisers finish scrapping.
- 18 Orphey-class destroyers begin scrapping at dockside. No tonnage removed this quarter; scrapping to complete Q1/1945.

- Total tonnage in recycling until Q3/1944: (11x175) + (4x513) + (29x66) = 5891t
- Total tonnage in recycling until Q4/1944: (4x342) + (4x628) + (1x588) + (2x513) = 5494t
- Total tonnage in recycling until Q1/1945: (4x503) + (1x406) + (2x342) + (4x628) = 5614t
- Total tonnage in recycling until Q2/1945: (4x503) = 2012

Other Notes
Design work completes on Project 76 class cruisers; two vessels ordered for 1945 and two more for 1946. Tentatively named Avrora class.

Order of Battle, December 31st, 1944
Note: X (Y)+Z = completed (under repair/refit) + under construction

The Fleet
Battleships: 18(0)+0
Battlecruisers: 5(0)+4
Coast Defense Battleships: 2(0)+0
Aircraft Carriers: 12(0)+3
Heavy / Armoured Cruisers: 12(0)+0
Escort Cruisers: 4(0)+0
Escort Carriers: 3(0)+0
Light Cruisers: 53(0)+3
Destroyers: 123(0)+6-18
Frigates: 6(0)+6
Sloops: 4(0)+0
Corvettes: 100(0)+0
Fleet Submarines: 40(0)+0
Coastal Submarines: 120(0)+0

Coastal Forces
Patrol Boats: 80(0)+0
Submarine Chasers: 170(0)+0
MTB: 340(0)+0
Experimental Fast Attack Craft: 9(0)+0
Minelayers: 50(0)+0
Minesweepers: 22(0)+0
Light Minesweepers: 20(0)+0

Fleet Services
Seaplane Carriers: 4(0)+0
Repair Ships: 2(0)+0
Fleet Icebreakers: 7(0)+0
Shallow-draft Icebreakers: 2(0)+0
Port Icebreakers: 20(0)+2
Fleet Oilers: 8(0)+0
Ice-Capable Fleet Oilers: 2(0)+0
Light Oilers: 4(0)+0
Destroyer Tenders: 3(0)+0
Corvette/Submarine Tenders: 19(0)+0
Sail Training Ship: 1(0)+0

Amphibious Forces
Amphibious Command Ships: 2(0)+0
Heavy Landing Ship (Caiman): 8(0)+0
Amphibious Transport Ships (Alligator): 12(0)+0
Amphibious Assault Ships (Krokodill): 18(0)+0
Amphibious Assault Boats: 62(0)+0

2

Tuesday, September 23rd 2014, 3:49am

Addendum to the above report: at some point, I thought I'd accounted for five escort carriers of the Aldeberan-class, which matched with the numbers AdmK had in his reports. But I just searched through the old sim reports this evening trying to find when they were converted, and I came to two conclusions.

First, the ship I'd thought was #5 in class, named Cygnus in the reports and converted in 1943, is apparently not of the Aldeberan class, but is its own unique design.

Second, I cannot account for two more Aldeberan-class ships. I'd found Orion in AdmK's order-of-battle, but this is apparently the ship converted in 1939 (which I'd presumed was Aldeberan). Apparently, then, I double-counted both Orion and Aldeberan. Similarly, I apparently picked up a Pollux somewhere, and I have even less idea how that ship appeared.

Therefore, instead of having two Canopus and five Aldeberan class escort carriers, I am revising the list to 2x Canopus, 2x Aldeberan (named Orion and Castor) and 1x Cygnus.