Report for Q4/1944
Industrial Allocation
- 24/27 factories producing 24,000t materials.
- 3/27 factories producing infrastructure
- 3,503t from stockpile.
- 2,378t from transactions.
- 1,668t from scrapping.
- 31,550t materials total.
- 23,779t used.
- 2,949t stored for Q1/45.
Infrastructure Development
3 factories dedicated to IP, producing 0.3 IP + 0.3 IP from dedicated production. 5.0 IP added to half-factory, 0.0 IP remaining.
Naval Construction
Arsenal de La Rochelle (Cl 5)
Class 4.5 Slip #1 - Idle
Class 4 Slip #1 - Idle
Class 3 Slip #1 - Class 3 Slip #2 - Idle
Class 3 Slip #3 - Contre-Torpillieur
L'Infatigable (
Forbin class) laid down September 1st, 1944. 2,500 tons required. 625 tons added in Q4/1944 for a total of 835 / 2500 tons. 1665 / 2500 tons remaining. Launched November 19th, 1944. Completed June 15th, 1945.
Class 3 Slip #4 - Idle
Class 2 Slip #1 - Contre-Torpillieur
L'Inébranlable (
Forbin class) laid down July 1st, 1944. 2,500 tons required. 625 tons added in Q4/1944 for a total of 1250 / 2500 tons. 1250 / 2500 tons remaining. Launched November 19th, 1944. Completed June 15th, 1945.
Class 2 Slip #2 - Contre-Torpillieur
L'Implacable (
Forbin class) laid down November 1st, 1944. 2,500 tons required. 625 tons added in Q4/1944 for a total of 625 / 2500 tons. 1875 / 2500 tons remaining. Launched March 19th, 1945. Completed October 15th, 1945.
Class 1 Slip #1 -Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
Dockside:
- Export Battleship
Tapae laid down for Romania January 1st, 1943. 34,448 tons required. 2,379 tons added in Q3/1944 for a total of 19032 / 34448 tons. 15416 / 34448 tons remaining. Launched June, 1944. Completion planned for September 9th, 1946.
- Heavy Cruiser
Redoubtable laid down July 1st, 1943. 14,275 tons required. 3000 tons added in Q4/1944 for a total of 8700 / 14275 tons. 5575 / 14275 tons remaining. Launched September, 1944. Completion planned for June 9th, 1945.
- Heavy Cruiser
Renommée laid down July 1st, 1943. 14,275 tons required. 3000 tons added in Q4/1944 for a total of 8700 / 14275 tons. 5575 / 14275 tons remaining. Launched September, 1944. Completion planned for June 9th, 1945.
- Contre-Torpillieur
Duperré (
Forbin class) laid down March 1st, 1944. 2,500 tons required. 625 tons added in Q4/1944 for a total of 2085 / 2500 tons. 415 / 2500 tons remaining. Launched July 19th, 1944. Completed March 15th, 1945.
- Contre-Torpillieur
L'Inflexible (
Forbin class) laid down May 1st, 1944. 2,500 tons required. 625 tons added in Q4/1944 for a total of 1875 / 2500 tons. 625 / 2500 tons remaining. Launched September 19th, 1944. Completed April 15th, 1945.
- Contre-Torpillieur
d'Estaing (
Forbin class) laid down November 1st, 1943. 2,500 tons required. 0 tons added in Q4/1944 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched March 19th, 1944. Completed October 15th, 1944.
- Contre-Torpillieur
Guépratte (
Forbin class) laid down January 1st, 1944. 2,500 tons required. 625 tons added in Q4/1944 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched May 19th, 1944. Completed December 15th, 1944.
- Escorteur rapide
Le Vendéen laid down January 1st, 1944. 1,185 tons required. 135 tons added in Q4/1944 for a total of 1185 / 1185 tons. 0 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
- Escorteur rapide
Le Bordelais laid down January 1st, 1944. 1,185 tons required. 135 tons added in Q4/1944 for a total of 1185 / 1185 tons. 0 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
- Escorteur rapide
Le Gascon laid down January 1st, 1944. 1,185 tons required. 135 tons added in Q4/1944 for a total of 1185 / 1185 tons. 0 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
- Escorteur rapide
Le Savoyard laid down January 1st, 1944. 1,185 tons required. 135 tons added in Q4/1944 for a total of 1185 / 1185 tons. 0 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
- Submarine
Naiade (
Thetis class) laid down January 1st, 1944. 675 tons required. 0 tons added in Q4/1944 for a total of 675 / 675 tons. 0 / 675 tons remaining. Launched April 30th, 1944. Completed October 21st, 1944.
- Submarine
Gymnote (Experimental Testbed) laid down July 1st, 1944. 375 tons required. 0 tons added in Q4/1944 for a total of 375 / 375 tons. 0 / 375 tons remaining. Launched August 24th, 1944. Completed November 12th, 1944.
- Submarine
Circé (
Thetis class) laid down April 1st, 1944. 675 tons required. 75 tons added in Q4/1944 for a total of 675 / 675 tons. 0 / 675 tons remaining. Launched July 30th, 1944. Completed January 21st, 1945.
- Tanker
Marne converted as naval auxiliary. 1451 tons required. 1451 tons added in Q4/1944. Conversion completed.
- Tanker
Ource converted as naval auxiliary. 1451 tons required. 1451 tons added in Q4/1944. Conversion completed.
- Tanker
Ventôse converted as naval auxiliary. 260 tons required. 260 tons added in Q4/1944. Conversion completed.
DCNS Brest (Cl 5)
Class 3 Drydock #1 - Light cruiser
Montcalm continues partial reconstruction started on July 1st, 1944. 2797 tons required. 1100 tons added in Q4/1944 for a total of 2200 / 2797 tons. 597 /2797 tons remaining. Refit completed February 11th, 1945.
Class 2 Drydock #1 - Light cruiser
Primauguet continues partial reconstruction. 2797 tons required. 597 tons added in Q4/1944 for a total of 2797 / 2797 tons. 0 /2797 tons remaining. Refit completed November 11th, 1944.
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Dockside:
- Tugboat
Taureau converted as naval auxiliary. 223 tons required. 223 tons added in Q4/1944. Conversion completed.
- Merchant ship
Dromadaire converted as naval auxiliary (aircraft transport). 211 tons required. 211 tons added in Q4/1944. Conversion completed.
Société Nouvelle des Forges et Chantiers de la Méditerranée, Marseilles (Cl 5)
Class 4 Drydock #1 - Idle
Class 3 Slip #1 - Aircraft Carrier
Zélé laid down January 1st, 1944. 14,550 tons required. 2700 tons added in Q4/1944 for a total of 3000 / 14550 tons. 11550 / 14550 tons remaining until completion. Launched March 3rd, 1945. Completed December 17th, 1945.
Class 3 Slip #2 - Aircraft Carrier
Héros laid down January 1st, 1944. 14,550 tons required. 2700 tons added in Q4/1944 for a total of 3000 / 14550 tons. 11550 / 14550 tons remaining until completion. Launched March 3rd, 1945. Completed December 17th, 1945.
Class 2 Drydock #1 - Light cruiser
Tourville begins partial reconstruction started on October 1st, 1944. 2797 tons required. 1100 tons added in Q4/1944 for a total of 1100 / 2797 tons. 1697 /2797 tons remaining. Refit completed April 11th, 1945.
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Dockside:
- Frégate de surveillance
Fidji (
Polynésie class) laid down January 1st, 1944. 2,779 tons required. 679 tons added in Q4/1944 for a total of 2779 / 2779 tons. 0 / 2779 tons remaining. Launched May 22nd, 1944. Completed December 24th, 1944.
- Frégate
Sans Peur laid down January 1st, 1944. 1,400 tons required. 200 tons added in Q4/1944 for a total of 1400 / 1400 tons. 0 / 1400 tons remaining. Launched May 5th, 1944. Completed December 12th, 1944.
Arsenal de Cayenne (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Dockside:
N/A
Arsenal de Abidjan (Cl 5)
Class 3 Drydock #1 -
Emilia-class patrouilleur
Frasquita refitting. 56 tons required. 56 tons added Q4/44. 0 tons remaining. Refit completed.
Class 1 Drydock #1 -
Emilia-class patrouilleur
Véronique refitting. 56 tons required. 56 tons added Q4/44. 0 tons remaining. Refit completed.
Arsenal de Oran (Cl 5)
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Dockside:
N/A
Arsenal de Tunis (Cl 5)
Class 4 Drydock #1 -Idle
Class 3 Slip #1 - Idle
Class 1 drydock #1 - Idle
Dockside:
N/A
Arsenal de Beiruit (Cl 5)
Class 3 Drydock #1 - Idle
Dockside:
N/A
Arsenal de Djibouti (Cl 2)
Class 2 Drydock #1 -
Emilia-class patrouilleur
Le Dancaïre refitting. 56 tons required. 56 tons added Q4/44. 0 tons remaining. Refit completed.
Class 1 Drydock -
Emilia-class patrouilleur
Micaëla refitting. 56 tons required. 56 tons added Q4/44. 0 tons remaining. Refit completed.
Class 1 Drydock #1 - Corvette
Chiers refitting. 80 tons required. 80 tons added Q4/1944. 0 tons remaining. Refit completes November 15th, 1944.
Dockside:
- None
Base Navale, Dakar
Class 1 Floating Drydock #1 - Idle.
Forges et Chantiers de Indochine, Saigon (Cl 5)
Class 4 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 0 Slip #1 - Two craft laid down end to end. Vedette FOM 8m laid down October 1st; 8 tons added Q4/44. Completed October 30th, 1944, launched. Vedette FOM 11m laid down October 1st; 11 tons added Q4/44. Completed October 30th, 1944, launched.
Class 0 Slip #2 - Idle
Dockside:
- N/A
Forges et Chantiers de Indochine, Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Idle
At New Caledonia (Cl 5)
Class 4 Drydock #1 - Heavy cruiser
Nouvelle-Calédonie completes total reconstruction. 8601 tons required. 2001 tons added in Q4/1944 for a total of 8601 / 8601 tons. 0 / 8601 tons remaining. Reconstruction completed Q4/1944.
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Aviso
Algérien (
Arabe class) laid down July 1st, 1944. 634 tons required. 190 tons added in Q4/1944 for a total of 380 / 634 tons. 254 / 634 tons remaining. Launched November 27th, 1944. Completed April 19th, 1945.
Class 0 Slip #2 - Aviso
Dong Da (
Arabe class) laid down July 1st, 1944. 634 tons required. 190 tons added in Q4/1944 for a total of 380 / 634 tons. 254 / 634 tons remaining. Launched November 27th, 1944. Completed April 19th, 1945.
Class 0 Slip #3 - Idle
Dockside:
- Aviso
Annamite (
Arabe class) laid down January 1st, 1944. 634 tons required. 64 tons added in Q4/1944 for a total of 634 / 634 tons. 0 / 634 tons remaining. Launched April 27th, 1944. Completed October 19th, 1944.
- Aviso
Van Kiep (
Arabe class) laid down January 1st, 1944. 634 tons required. 64 tons added in Q4/1944 for a total of 634 / 634 tons. 0 / 634 tons remaining. Launched April 27th, 1944. Completed October 19th, 1944.
At Papeete (Cl 3)
Class 3.5 Drydock - Idle
Dockside:
- None
On Trials:
Many, many things.
From Factories
- 4x EDA-55 landing craft constructed at 55 tons apiece. (220 tons used.)
- 4x EA-13 landing craft constructed at 13 tons apiece. (52 tons used.)
- 4x FOM 11m constructed at 12 tons apiece. (48 tons used.)
- 32x Hydroglisseur M44 constructed by Zodiac Marine at 1 ton apiece. (32 tons used.)
Transactions
- 2,379 tons from Romania for Export Battleship (construction costs).
Other Notes
None
Ships being scrapped
One
CS-27-class submarine is being scrapped for 66 tons apiece.
- Total tonnage in recycling until Q4/1944: (9x178) + (1x66) = 1668
- Total tonnage in recycling until Q1/1945: (1x178) + (1x66) = 244
- Total tonnage in recycling until Q2/1945: (1x66) = 66
Updated Order of Battle, End of Q4/1944
Note: X(Y)+Z = completed (under repair/refit) + under construction - scrapping
The Fleet
Battleships: 7(0)+1
Battlecruisers: 4(0)+0
Aircraft Carriers: 11(0)+2
Heavy Cruisers: 15(0)+2
Light Cruisers: 24(2)+0
Coast Defense Ships: 5(0)+0
Destroyers: 85(0)+5
Frigate: 4(0)+0
Corvettes: 10(0)+0
Escorteurs Rapides: 8(0)+0
Avisos: 12(0)+2
Fleet Submarines: 26(0)+0
Coastal Submarines: 58(0)+1
Motor Torpedo Boats: 38(0)+0
Motor Torpedo Boat Experimental: 1(0)+0
Patrouilleurs: 16(0)+0
Submarine Chasers: 100(0)+0
Light Patrol Boats: 8(0)+0
River Gunboats: 34 (0)+0
Vedettes: 8(0)+0
Minesweepers: 28(0)+0
Fleet Train
Replenishment Ships: 16(0)+0
Light Oiler Tankers: 7(0)+0
Gasoline Tankers: 3(0)+0
Oil Transport Tankers: 6(0)+0
Fleet Tenders: 4(0)+0
Submarine Tenders: 1(0)+0
Heavy Repair Ships: 2(0)+0
Light Repair Ships: 4(0)+0
Ammunition Ships: 2(0)+0
Transports: 8(0)+0
Aircraft Transports: 2(0)+0
Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Fleet Tugs: 12(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 0(0)+0
Research Ship: 3(0)+0
Research Submarine: 1(0)+0
Amphibious Forces:
Dock Landing Ship: 2(0)+0
Vehicle Landing Ship: 4(0)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 10(0)+0
Infantry Landing Craft Large (EDA-L): 6(0)+0
Tank Landing Craft (EDA): 17(0)+0
Infantry Assault Craft Small (EA): 33(0)+0
Minor Craft:
Bateau de Service: 72(0)+0
Patrouilleur de Port: 54(0)+0
Hydroglisseurs: 32(0)+0
Patrouille Navale:
Frigate: 1(0)+0
Avisos: 2(0)+1
Minesweepers: 16(0)+0
Survey Craft: 1(0)+0
Tank Landing Craft (EDA): 8(0)+0
Infantry Assault Craft (EA): 8(0)+0
Submarine Chasers: 54(0)+0
Motor Torpedo Boats: 4(0)+0
Vedettes: 22(0)+0
Light Patrol Boats: 4(0)+0
Bateau de Service: 12(0)+0
Patrouilleur de Port: 4(0)+0