Italian Naval Construction Summary: 1944 Q4
Patria e Onore
Factories: Italy
25 Total factories.
25 Factories dedicated to production of 25,000 tons of Naval material.
0 factories (designated) dedicated to the production of IP for a total of 0IP. 0 bonus IP for factory dedication.
Factories: East African State
2 Total factories.
2 Factories dedicated to production of 2,000 tons of Naval material.
0 factories (designated) dedicated to the production of IP for a total of 0IP.
Material Transactions:
1127t rolled over from Q3/44
2000t from the East African State to Italy
28127 tons available for use
Naval Construction and Refit Report
Italy
OTO La Spezia
- Type 3 Slipway: Destroyer
Lorenzo Marcello receives 675t. 1350t of 2700t assembled. 1350t required, launched Q4/44 and estimated completion Q2/45.
- Type 3 Slipway: Destroyer
Angelo Emo receives 675t. 1350t of 2700t assembled. 1350t required, launched Q4/44 and estimated completion Q2/45.
- Type 3 Drydock:
- Type 3 Drydock: Cruiser
San Pietro drydocked for reconstruction: receives 1665t. 6660t of 6660t assembled. 0t required, re-floated and completed Q4/44.
- Type 1.5 Drydock
- Type 1 Slipway: Auxiliary FRV-S1 layed down, receives 548t. 1096t of 2195t assembled. 1069t required, launched Q4/44 and estimated completion Q2/45.
-Dockside:
--Destroyer
Biagio Assereto receives 675t. 2700t of 2700t assembled. 0t required, completed Q4/44.
--Destroyer
Benedetto I Zaccaria receives 675t. 2700t of 2700t assembled. 0t required, completed Q4/44.
Orlando Taranto
- Type 4 Slipway:
- Type 4 Drydock:
- Type 3 Slipway: Destroyer
Lorenzo Marcello receives 675t. 1350t of 2700t assembled. 1350t required, launched Q4/44 and estimated completion Q2/45.
- Type 3 Drydock: Corvettes G-1 through G-3 layed down, receives 742.5t. 1485t of 1485t assembled. 0t required, launched and completed Q4/44.
- Type 3 Drydock:
- Type 1.5 Drydock:
- Type 1 Slipway: Auxiliary FRV-S2 layed down, receives 548t. 1096t of 2195t assembled. 1069t required, launched Q4/44 and estimated completion Q2/45.
-Dockside:
--Battleship
Dante Alighieri receives 3000t. 27000t of 45,275t assembled. 18275t required, estimated completion Q3/46.
--Destroyer
Guglielmo Grasso receives 675t. 2700t of 2700t assembled. 0t required, completed Q4/44.
Napoli di Castellammare
- Type 3 Slipway: Destroyer
Sebastiano Venier receives 675t. 1350t of 2700t assembled. 1350t required, launched Q4/44 and estimated completion Q2/45.
- Type 3 Drydock: Aircraft Carrier
Europa drydocked for reconstruction: receives 2001t. 6003t of 12011t assembled. 6008t required, estimated refloating and estimated completion Q3/45.
- Type 1 Slipway: Auxiliary FRV-S3 layed down, receives 548t. 1096t of 2195t assembled. 1069t required, launched Q4/44 and estimated completion Q2/45.
- Type 1.5 Drydock
-Dockside:
--Destroyer
Simone Doria receives 675t. 2700t of 2700t assembled. 0t required, completed Q4/44.
Marghera Fincantieri, Venezia
- Type 3 Slipway:
- Type 3 Slipway:
- Type 3 Drydock: Corvettes G-4 through G-6 layed down, receives 742.5t. 1485t of 1485t assembled. 0t required, launched and completed Q4/44.
- Type 1 Slipway: Auxiliary FRV-S4 layed down, receives 548t. 1096t of 2195t assembled. 1069t required, launched Q4/44 and estimated completion Q2/45.
- Type 1 Drydock
-Dockside:
--Destroyer
Carlo Zeno receives 675t. 2700t of 2700t assembled. 0t required, completed Q4/44.
--Destroyer
Lamba Doria receives 675t. 2700t of 2700t assembled. 0t required, completed Q4/44.
CRDA Trieste
-Type 4 slipway: Aircraft Carrier Giuseppe Cei laid down, receives 1583t. 1583t of 16000t assembled. 14417t required, estimated launch Q4/45 and estimated completion Q4/46.
-Type 4 slipway:
-Dockside:
--Battleship
Leonardo da Vinci receives 3000t. 36000t of 45,275t assembled. 12275t required, estimated completion Q4/45.
Messina di Castellammare
- Type 4 Drydock
- Type 3 Slipway:
- Type 3 Slipway:
- Type 3 Drydock: Cruiser
San Sylvestro drydocked for reconstruction: receives 1665t. 6660t of 6660t assembled. 0t required, re-floated and completed Q4/44.
- Type 1 Slipway: Auxiliary FRV-S5 layed down, receives 548t. 1096t of 2195t assembled. 1069t required, launched Q4/44 and estimated completion Q2/45.
-Dockside:
-- Destroyer
Agostino Barbarigo receives 675t. 2025t of 2700t assembled. 675t required estimated completion Q1/45.
-- Destroyer
Andrea Dandolo receives 675t. 2025t of 2700t assembled. 675t required estimated completion Q1/45.
Fincantieri Cagliari
- Type 3 Drydock: Cruiser
San Gregorio Magno drydocked for reconstruction: receives 1665t. 6660t of 6660t assembled. 0t required, re-floated and completed Q4/44.
- Type 1 Drydock
-Dockside:
-- Nine MAS.4490 Class boats constructed, 810t
-- Fourteen MAS.4429 Class boats constructed, 413t
East African State
Massawa
- Type 4 Drydock:
- Type 1 Slipway:
- Type 1 Drydock:
-Dockside:
Mogadishu
-Type 1 Drydock:
Scraping Report
No ships scrapped
Ships on Trials
Aircraft Carriers:
Aquila
Cruisers:
Sicily, Sardinia
Armored Cruiser:
Regina Elena
Current Order of Battle: Italian Navy
BB. 7(0)+2
CV. 13(1)+1
ACR. 10(3)+0
CL. 19(0)+0
AV. 1(0)+0
DD. 57(0)+12
Submarines. 105(0)+0
Escorts. 93(0)+6
MAS. 323(0)+23
Mine Warfare. 19(0)+0
Auxiliary. 95(0)+5
Current Order of Battle: East African State Navy
1(0)+0 Cruisers
2(0)+0 Coastal Defense ships
1(0)+0 Submarine
20(0)+0 MAS
Infrastructure Projects
Summary of Expenditures
28127t out of 28127t used in Naval construction.
0t out of 28127t used in payments.
0 IP used in Infrastructure Projects
28127t expended Q4/44.
0t rollover to Q1/45.