Brazil, Q3/1944
- 7000 tons from 7/7 factories producing naval materials
- 4,220 tons from stockpile
- 156 tons from scrapping
- 0 tons from transactions
- 11,376 tons total for Q3/1944
- 7,509 tons used in Q3/1944.
- 3,867 tons left for Q4/44.
0/7 factories committed for Quarter to infrastructure development
0/7 factories committed for Year to infrastructure development
Infrastructure Development
N / A
Naval Construction
Arsenal de Marinha do Rio de Janeiro
- Class 3 Slipway: Idle
- Class 1 Slipway: Destroyer Sorocaba laid down July 1st, 1944. 2,200 tons required. 650 tons added Q3/1944 for a total of 650/2200 tons. 1,550 tons remaining until completion. Ship requires 11.2 months to construct. Launched November 15, 1944. Completed June 7th, 1945.
- Class 1 Slipway: Destroyer Aracaju laid down July 1st, 1944. 2,200 tons required. 650 tons added Q3/1944 for a total of 650/2200 tons. 1,550 tons remaining until completion. Ship requires 11.2 months to construct. Launched November 15, 1944. Completed June 7th, 1945.
- Class 1 Slipway: Destroyer São José dos Campos laid down July 1st, 1944. 2,200 tons required. 650 tons added Q3/1944 for a total of 650/2200 tons. 1,550 tons remaining until completion. Ship requires 11.2 months to construct. Launched November 15, 1944. Completed June 7th, 1945.
- Class 1 Slipway: Destroyer Campo Grande laid down April 1st, 1944. 2,200 tons required. 650 tons added Q3/1944 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1944. Completed March 7th, 1945.
- Class 3.5 Drydock: Idle
- Class 3 Drydock: Idle
Dockside:
- Destroyer Contagem laid down October 1st, 1943. 2,200 tons required. 250 tons added Q3/1944 for a total of 2200/2200 tons. 0 tons remaining until completion. Ship requires 11.2 months to construct. Launched February 15, 1944. Completed September 7th, 1944.
- Destroyer Porto Alegre laid down January 1st, 1944. 2,200 tons required. 650 tons added Q3/1944 for a total of 1950/2200 tons. 250 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1944. Completed December 7th, 1944.
- Destroyer São Luís laid down January 1st, 1944. 2,200 tons required. 650 tons added Q3/1944 for a total of 1950/2200 tons. 250 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1944. Completed December 7th, 1944.
- Destroyer Belo Horizonte laid down January 1st, 1944. 2,200 tons required. 650 tons added Q3/1944 for a total of 1950/2200 tons. 250 tons remaining until completion. Ship requires 11.2 months to construct. Launched May 15, 1944. Completed December 7th, 1944.
Arsenal de Marinha do Macapa
- Class 1 Slipway: Patrol Craft Guaporé laid down July 1st, 1944. 108 tons needed to complete. 108 tons added Q3/1944 for a total of 108/108 tons. 0 tons remaining until completion. Launched complete on July 31st, 1944.
- Class 1 Slipway: Patrol Craft Bracuí laid laid down July 1st, 1944. 108 tons needed to complete. 108 tons added Q3/1944 for a total of 108/108 tons. 0 tons remaining until completion. Launched complete on July 31st, 1944.
- Class 1 Slipway: Destroyer João Pessoa laid down April 1st, 1944. 2,200 tons required. 650 tons added Q3/1944 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1944. Completed March 7th, 1945.
- Class 1 Slipway: Destroyer Natal laid down April 1st, 1944. 2,200 tons required. 650 tons added Q3/1944 for a total of 1300/2200 tons. 900 tons remaining until completion. Ship requires 11.2 months to construct. Launched August 15, 1944. Completed March 7th, 1945.
- Class 1 Slipway: Idle
- Class 1 Slipway: Idle
- Class 0 Drydock: Idle
Dockside:
- Destroyer Maceió laid down October 1st, 1943. 2,200 tons required. 250 tons added Q3/1944 for a total of 2200/2200 tons. 0 tons remaining until completion. Ship requires 11.2 months to construct. Launched February 15, 1944. Completed September 7th, 1944.
- Destroyer Belford Roxo laid down October 1st, 1943. 2,200 tons required. 250 tons added Q3/1944 for a total of 2200/2200 tons. 0 tons remaining until completion. Ship requires 11.2 months to construct. Launched February 15, 1944. Completed September 7th, 1944.
Arsenal de Marinha do Manaus
- Class 0 Slipway: River hospital ship Evandro Chagas (NAH-4) laid down July 1st, 1944. 250 tons required. 250 tons added Q3/1944 for a total of 250/250 tons. 0 tons remaining until completion. Ship requires 4.25 months to construct. Launched August 20th, 1944. Completed November 10th, 1944.
- Class 0 Slipway: River monitor Amapá laid down July 1st, 1944. 303 tons required. 175 tons added Q3/1944 for a total of 175/303 tons. 128 tons remaining until completion. Ship requires 4.3 months to complete. Launched August 20th, 1944. Completed November 10th, 1944.
- Class 0 Drydock: 70 ton river patrol craft BPR-13 laid down July 1st, 1944. 70 tons added. Launched complete on July 31st, 1944.
- Class 0 Drydock: 70 ton river patrol craft BPR-14 laid down July 1st, 1944. 70 tons added. Launched complete on July 31st, 1944.
Dockside:
- River monitor Rondônia laid down April 1st, 1944. 303 tons required. 128 tons added Q3/1944 for a total of 303/303 tons. 0 tons remaining until completion. Ship requires 4.3 months to complete. Launched May 20th, 1944. Completed September 10th, 1944.
On Trials:
Transactions
- None
Scrapping
156 tons in recycling until Q3/1944.
Order of Battle
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
The Fleet
Battleships: 1(0)+0
Aircraft Carriers: 4(0)+0
Battlecruisers: 2(0)+0
Light Cruisers: 10(0)+0
Destroyers: 35(0)+9
Submarines: 36(0)+0
Patrol Craft: 14(0)+0
Gunboats: 0(0)+0
Minelayers: 0(0)+0
Minesweepers: 20(0)+0
Fleet Train
Oilers: 3(0)+0
Tenders: 1(0)+0
Training Ships: 1(0)+0
Riverine Forces
River Monitor: 2(0)+1
River Gunboats: 14(0)+0
Barracks Ship: 1(0)+0
River Construction Tender: 1(0)+0
River Hospital Ship: 3(0)+0